Illinois · Data centers
Data center structural steel for Chicagoland
Elk Grove Village, Itasca, Franklin Park, Aurora and Hoffman Estates host one of the largest data center markets in the country, close to Chicago’s fiber routes and power. Campuses are built hall by hall, under northern Illinois snow, with heavy cooling and electrical equipment on every roof and yard.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Illinois site by rail through the Chicago hub.
- Market
- Western and northwest suburbs
- Typical build
- Phased multi-hall campuses
- Steel drivers
- Roof plant, snow, floors
- Our part
- Repeatable hall packages
Why it matters
Heavy roofs in snow country
Data halls carry cooling units, dunnage and screens on the roof, and in northern Illinois those roofs also carry snow and the drifts that equipment creates. The frame has to be designed for both from the first model.
We detail the first hall once and release the next ones from the same model, so the contractor keeps the same sequence and crews on every building of the campus.
What we design and fabricate
Steel for data center campuses
Data hall frames
Long spans with repeatable bays.
Roof equipment steel
Dunnage and platforms for cooling units.
Hung services
Framing for cable trays, busway and piping.
Snow and drift
Roof steel sized for drift at equipment.
Who does what
Data center steel, split clearly
World Steel supplies
- Hall frames, roof steel and equipment platforms
- Phased release by building and by area
- Anchor bolt layouts and foundation reactions
- Coatings to the owner’s specification
- Tekla shop and erection drawings, included
The US contractor arranges
- Engineer of Record approval and seal
- The village or city permit and inspections
- Foundations, slabs and erection
- Mechanical and electrical installation
- Owner coordination on the campus schedule
Illinois
What we do not claim
We name no data center owner as a customer and claim no completed Illinois campus. We fabricate the structural steel to your drawings or our design, and your Engineer of Record approves it.
Illinois ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Illinois contractors
Illinois contractors: let’s win the next project together
If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Illinois. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Illinois project is cut, welded, inspected and packed.
Q&A
What Illinois buyers ask
Can you repeat one package across several halls?
Yes. Later halls are released from the same model with changes tracked, following the same erection sequence.
Do you design roof equipment steel for snow?
Yes, dunnage and platforms are designed with the equipment loads and the drift your engineer defines.
How does the steel reach the western suburbs?
By rail from the West Coast to the Chicago area yards, then a short truck trip to site.
Official sources: Intersect Illinois
Illinois solutions
Every Illinois guide
Related pages
Code facts on this page summarize Illinois practice, local code adoption, the Chicago Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the code and edition in force for your permit.
Building in Illinois?
Send the drawings or the site address, size and use. We set the Illinois design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the rail trip to your site.