New Hampshire · Multi-story
Structural steel for New Hampshire hospitals, campuses and resorts
New Hampshire builds hospitals and medical buildings in Lebanon, Manchester and Concord, college and school buildings across the state and lodges and resort buildings in the White Mountains. Steel frames with composite floors carry the snow and seismic loads and go up fast. We fabricate that steel floor by floor.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New York or Boston for your New Hampshire site.
- Uses
- Hospitals, campuses, resorts
- Floors
- Composite on deck
- Lateral
- Snow and seismic
- Release
- Floor by floor
Why it matters
Short seasons, tall frames
A hospital addition must go up beside a running hospital, and a resort lodge must close in before winter. Heavy snow on the roof also counts as seismic mass where the code requires it.
We fabricate columns, beams, bracing and deck and ship them floor by floor in erection order, coated ready for fire protection.
What we design and fabricate
Steel for multi-story buildings
Frames and floors
Columns, beams and composite floors on metal deck.
Lateral systems
Braced or moment frames for wind and seismic loads.
Stairs and cores
Steel stairs and core framing.
Fire protection
Steel ready for the fire-resistance design.
Who does what
Multi-story steel, split clearly
World Steel supplies
- Columns, beams, bracing and deck
- Floor-by-floor releases packed in erection order
- Coating ready for fire protection
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Architecture and the Engineer of Record’s design
- Engineer of Record approval and PE seal
- Fire protection and inspections
- Concrete topping and MEP
- Erection and site work
New Hampshire
What we do not claim
World Steel names no New Hampshire developer as a customer and claims no completed New Hampshire building. Fire protection and inspections are your team’s scope.
New Hampshire ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Hampshire contractors
New Hampshire contractors: let’s win the next project together
If your next bid involves hospitals, campuses and resorts, World Steel wants to be your long-term, win-win steel partner in New Hampshire. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Hampshire project is cut, welded, inspected and packed.
Q&A
What New Hampshire buyers ask
Can you deliver floor by floor?
Yes. We pack and ship the steel floor by floor.
Do you supply metal deck?
Yes. Metal decking is part of the package.
Do you supply fireproofing?
No. Fire protection is your team’s scope; the steel is coated ready for it.
Official sources: New Hampshire Hospital Association
New Hampshire solutions
Every New Hampshire guide
Related pages
Code facts on this page summarize New Hampshire practice, the New Hampshire State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Hampshire?
Send the drawings or the site address, size and use. We set the New Hampshire design basis with your Engineer of Record, design or detail the steel to the New Hampshire State Building Code, mountain snow and seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered through New York or Boston to your site.