Quality program · large US jobs

One quality system, run at 2,500 metric tons a month

Big packages are where quality slips: more heats, more welders, more paint lots. Our plant in Vietnam runs every member through the same tags, hold points and records, whether the job is 50 t or 5,000 t.

  • Sunpro Steel: 5,000 t through the same QC
  • Long Son oil and gas: 2,000 t, 56,000 m²
  • CPV Food: 2,500 t food processing plant
Long shop floor of built-up steel members under overhead cranes at the World Steel plant

2,500 tStructural steel a month (about 2,750 short tons), every piece under one QC system

Built-up members in production at World Steel, Tay Ninh Province, Vietnam.

Four layers of checking

Who checks your steel, and how often

Our own QC sits at the center. Around it, independent auditors, then your inspector, then your building official on site.

  • World Steel QC Every member, every station

    Process tags signed by the worker, the foreman and QC at each station; fit-up, welds, dimensions and coating checked before release.

  • IAS and Smith-Emery Twice a year, every year

    The written program against AC472, then what people on the floor actually do: welding, traceability, design office and finished parts.

  • Your inspector At the points in your ITP

    Your QA agency or special inspector witnesses hold and witness points at the plant or by video and reviews the records.

  • Your building official On your site

    Field inspection and erection stay under your jurisdiction’s rules and your Engineer of Record. The steel arrives with the records they ask for.

Accreditation

The first and only IAS AC472 accredited steel plant in Vietnam

The accreditation covers how we design and how we fabricate, and IAS checks both twice a year. Building officials across the US look to it when they decide on shop inspection under IBC Chapter 17.

In the program since

2019

Audits a year

Two

Accredited scope

Part A + Part C

Inspection agency

Smith-Emery (AA-554)

Codes and specifications we work to

  • AWS D1.1
  • AWS D1.3
  • AWS D1.8
  • AISC 360
  • AISC 341
  • ASTM A6
  • EN 10204 3.1
  • ISO 3834-2

We design and fabricate to these codes as your specification sets them. ISO 3834-2 is a certificate held by World Steel; the others describe the work, not a certification.

IAS AC472 certificate of accreditation for World Steel, valid to August 1, 2027
IAS AC472 certificate in force today, valid to August 1, 2027, naming Smith-Emery for periodic plant inspections.

Questions

Quality questions from US contractors

How can we be sure of the quality of steel made in Vietnam?

Check it the way you would check any fabricator, then go further. Our plant has held IAS AC472 accreditation since 2019 and is audited twice a year; Smith-Emery Laboratories (IAS AA-554) carries out the periodic plant inspections. On your job you can send your own inspector to the hold points in your ITP, or witness them by video, and every member is traceable in PEB Studio from mill heat to container.

Is World Steel AISC certified?

No. Our accreditation is IAS AC472, the program IAS runs for metal building manufacturers that both design and fabricate, which building officials commonly accept under IBC Chapter 17. We work to AISC 360, AISC 341 and the AWS D1 codes your specification names, and we say "designed to" or "fabricated to" for those codes, never "certified".

Can our special inspector skip the shop inspection?

That decision belongs to your building official. IBC Chapter 17 lets the official waive shop special inspection for an approved fabricator, and plan reviewers often look to IAS accreditation for that approval. Raise it early in plan review. If the waiver is not granted, your inspector is welcome at the plant or by video.

Who approves the drawings and stamps them?

Your Engineer of Record. World Steel designs and fabricates the steel and provides calculations and drawings ready for your Engineer of Record’s review and approval. The seal, the permit and erection are on the US contractor’s side.

What happens if a member fails an inspection?

It goes on hold with a sticker and cannot be packed. It is repaired to procedure or remade, inspected again and closed with photos in the nonconformance log, which goes into your data book.

Which records come with the steel?

Mill certificates by heat (EN 10204 3.1, Charpy V-notch on request), WPS, PQR and welder records, the ITP signed by both parties, weld, dimension and coating reports, NDT results where your specification calls for testing, and closed NCRs.

Can we see the quality records before we award the job?

Yes. A sample ITP is free in our download center, and we can walk your team through a live project in PEB Studio on a video call. Items and rates in a real ITP are agreed by both parties for each project.

Put our quality records in front of your inspector

Send your specification and ITP requirements. We show you how the job would be checked, who can witness it and what lands in your data book, from a plant that fabricates 2,500 metric tons a month.