Our quality program
Five questions US contractors ask, answered with proof
Five pages, five questions US contractors ask before they buy structural steel made overseas. Each answer shows what we do and what you can check yourself.
“Can I see my steel being made from the US?”
Digital project control
Every piece mark tied to its heat, welds, inspections and coating readings in PEB Studio, live.
Open digital project control →
“Can my inspector check the steel before it ships?”
Inspector access
Your QA agency or special inspector witnesses hold points at the plant or live by video.
Read more →
“What paperwork comes with the steel?”
Quality records
Mill certificates, WPS and PQR, ITP sign-offs and inspection reports, filed as one data book.
Read more →
“What happens when something is wrong?”
Nonconformance control
A failed check stops the member: tagged, repaired or remade, re-inspected and closed with photos.
Read more →
“Will the paint hold up on my site?”
Coating quality
UL-certified coating products from worldwide brands, applied by manufacturer-certified painters.
Read more →Four layers of checking
Who checks your steel, and how often
Our own QC sits at the center. Around it, independent auditors, then your inspector, then your building official on site.
-
World Steel QC Every member, every station
Process tags signed by the worker, the foreman and QC at each station; fit-up, welds, dimensions and coating checked before release.
-
IAS and Smith-Emery Twice a year, every year
The written program against AC472, then what people on the floor actually do: welding, traceability, design office and finished parts.
-
Your inspector At the points in your ITP
Your QA agency or special inspector witnesses hold and witness points at the plant or by video and reviews the records.
-
Your building official On your site
Field inspection and erection stay under your jurisdiction’s rules and your Engineer of Record. The steel arrives with the records they ask for.
Accreditation
The first and only IAS AC472 accredited steel plant in Vietnam
The accreditation covers how we design and how we fabricate, and IAS checks both twice a year. Building officials across the US look to it when they decide on shop inspection under IBC Chapter 17.
In the program since
2019Audits a year
TwoAccredited scope
Part A + Part CInspection agency
Smith-Emery (AA-554)Codes and specifications we work to
- AWS D1.1
- AWS D1.3
- AWS D1.8
- AISC 360
- AISC 341
- ASTM A6
- EN 10204 3.1
- ISO 3834-2
We design and fabricate to these codes as your specification sets them. ISO 3834-2 is a certificate held by World Steel; the others describe the work, not a certification.
Go deeper
More on how your steel is made and checked
Questions
Quality questions from US contractors
How can we be sure of the quality of steel made in Vietnam?
Check it the way you would check any fabricator, then go further. Our plant has held IAS AC472 accreditation since 2019 and is audited twice a year; Smith-Emery Laboratories (IAS AA-554) carries out the periodic plant inspections. On your job you can send your own inspector to the hold points in your ITP, or witness them by video, and every member is traceable in PEB Studio from mill heat to container.
Is World Steel AISC certified?
No. Our accreditation is IAS AC472, the program IAS runs for metal building manufacturers that both design and fabricate, which building officials commonly accept under IBC Chapter 17. We work to AISC 360, AISC 341 and the AWS D1 codes your specification names, and we say "designed to" or "fabricated to" for those codes, never "certified".
Can our special inspector skip the shop inspection?
That decision belongs to your building official. IBC Chapter 17 lets the official waive shop special inspection for an approved fabricator, and plan reviewers often look to IAS accreditation for that approval. Raise it early in plan review. If the waiver is not granted, your inspector is welcome at the plant or by video.
Who approves the drawings and stamps them?
Your Engineer of Record. World Steel designs and fabricates the steel and provides calculations and drawings ready for your Engineer of Record’s review and approval. The seal, the permit and erection are on the US contractor’s side.
What happens if a member fails an inspection?
It goes on hold with a sticker and cannot be packed. It is repaired to procedure or remade, inspected again and closed with photos in the nonconformance log, which goes into your data book.
Which records come with the steel?
Mill certificates by heat (EN 10204 3.1, Charpy V-notch on request), WPS, PQR and welder records, the ITP signed by both parties, weld, dimension and coating reports, NDT results where your specification calls for testing, and closed NCRs.
Can we see the quality records before we award the job?
Yes. A sample ITP is free in our download center, and we can walk your team through a live project in PEB Studio on a video call. Items and rates in a real ITP are agreed by both parties for each project.
Put our quality records in front of your inspector
Send your specification and ITP requirements. We show you how the job would be checked, who can witness it and what lands in your data book, from a plant that fabricates 2,500 metric tons a month.