Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Idaho · Seismic

Structural steel for Idaho fault zones and seismic design

Central and eastern Idaho sit in the Intermountain Seismic Belt. The 1983 Borah Peak earthquake was the largest in Idaho’s history, and the 2020 Stanley earthquake was felt across the state. Your Engineer of Record sets the site class and Seismic Design Category. We design and fabricate the lateral steel to AISC 341 where it applies.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Seattle, Tacoma or Portland for your Idaho site.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Belt
Intermountain Seismic
Reference events
Borah Peak, Stanley
Design
AISC 341 where it applies
Welds
AWS D1.8-qualified

Why it matters

Snow mass adds to the shaking

In Idaho the heaviest seismic and snow loads often meet on the same site, and part of the roof snow counts as seismic mass. Braced frames, moment frames and anchorage are sized for both.

We design or detail lateral systems to AISC 341 where they apply, mark protected zones on request and weld demand-critical joints with AWS D1.8-qualified WPS and welders.

What we design and fabricate

Steel for seismic categories

Braced frames

Special concentric and buckling-restrained frame steel.

Moment frames

Prequalified connections under AISC 358 where specified.

Demand-critical welds

Welds made by AWS D1.8-qualified welders with procedures on file.

Anchorage

Base plates and anchor rods for the seismic reactions.

Who does what

Seismic steel, split clearly

World Steel supplies

  • Lateral system steel designed or detailed to AISC 341 where it applies
  • AWS D1.8-qualified procedures and welders for demand-critical welds
  • Protected zones marked on the members on request
  • Mill certificates traced by heat, with Charpy results on request
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Site class and Seismic Design Category by the Engineer of Record
  • Engineer of Record approval and PE seal
  • Special inspections and the quality assurance plan
  • Foundations and anchorage installation
  • Erection and site work

Idaho

What we do not claim

AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no Idaho engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.

Idaho ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Idaho contractors

Idaho contractors: let’s win the next project together

If your next bid involves fault zones and seismic, World Steel wants to be your long-term, win-win steel partner in Idaho. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Idaho project is cut, welded, inspected and packed.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.
Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.

Q&A

What Idaho buyers ask

Which Idaho sites need seismic detailing?

Many in central and eastern Idaho. Your engineer sets the category from the soils.

Is AISC 341 a certificate?

No. AISC 341 is a design standard. We design and fabricate to it where it applies.

Can you supply Charpy-tested plate?

Yes. Vietnam plate mills can supply EN 10204 3.1 certificates with Charpy results on request.

Official sources: Idaho Geological Survey

Idaho solutions

Every Idaho guide

Related pages

Code facts on this page summarize Idaho practice, the Idaho Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Idaho?

Send the drawings or the site address, size and use. We set the Idaho design basis with your Engineer of Record, design or detail the steel to the Idaho Building Code, its fault zones and mountain snow, and quote it made in our plant in Vietnam, packed in erection order and delivered through Seattle, Tacoma or Portland to your site.