Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

West Coast · Washington

Steel buildings shipped to the Port of Seattle

Seattle is the closest major US container gateway to Asia by the great-circle route. We land your building on Puget Sound and hand it to drayage, BNSF or UP for Washington, the Inland Northwest and beyond.

Channel depth
Deep-draft berths on Elliott Bay and the Duwamish
Rail
BNSF and UP intermodal yards near the terminals
Ocean route
Direct across the Pacific
Our plant → SeattleWest Coast
Illustrative sea route from the World Steel plant in Vietnam to the Port of Seattle, across the Pacific. World Steel plant · Vietnam Seattle
  • Made in our IAS AC472 plant, Vietnam
  • Port of Seattle
  • Illustrative route; set per booking
Location
Seattle, Washington
Port authority
The Northwest Seaport Alliance (Ports of Seattle and Tacoma)
Highways
I-5, I-90, SR-99, SR-509

Made in Vietnam, landed at Seattle

Why ship your building through Seattle

Seattle’s container business is managed by the Northwest Seaport Alliance, a joint venture of the Ports of Seattle and Tacoma that markets Puget Sound as one gateway. Seattle’s big container terminals sit on the Duwamish waterways south of downtown, close to the SODO rail yards.

Your steel is engineered to Washington’s adopted codes, fabricated in World Steel’s plant in Vietnam and shipped to Puget Sound with its records attached. Seattle is a natural port for jobs in the city, the I-90 corridor and Alaska, where cargo moves north by barge or ship.

  • One package, one plant

    Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.

  • Accredited fabrication

    World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.

  • Designed to US codes

    IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.

  • Packed for this port

    Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.

Port facts

Terminals, channel and connections at Seattle

Channel

Deep-draft berths on Elliott Bay and the Duwamish

Rail

BNSF and UP intermodal yards near the terminals

Highways

I-5, I-90, SR-99, SR-509

TerminalWhere / operatorCargo
Terminal 5West Seattle, operated by SSA TerminalsContainers
Terminal 18Harbor Island, operated by SSA TerminalsContainers
Terminal 46Breakbulk and project cargo on the downtown waterfrontBreakbulk

Source: Northwest Seaport Alliance: terminal maps, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.

From our plant to Seattle

How your steel gets here

Across the North Pacific on the great-circle route, then through the Strait of Juan de Fuca into Puget Sound.

Your shipment to Seattle, leg by leg

Run the full simulation →
Our plantTay Ninh, Vietnam

By road

About 2 hours

World Steel pays

Cai Mep / Cat LaiPort of loading

By sea

≈ 6,600 nmi illustrative lane

Split between us

SeattleSeattle, Washington

Customs, truck or rail

Planned with your trucker

You pay

Your siteErected by the US contractor
Under FOB explained

Risk passes to you when the steel is on board the vessel at the named Vietnamese port.

Inland reach

Where steel goes from Seattle

Drayage serves the Puget Sound region. BNSF and UP carry containers east over the Cascades toward Spokane, Idaho and the northern plains. Alaska-bound cargo is transferred to the Jones Act services that run north from Puget Sound.

Map of the United States with the Port of Seattle, Washington highlighted, and the states it also serves: Idaho, Montana and Alaska. AK MT WA ID
Port stateAlso served from SeattlePort of Seattle

Designed for the region

Site conditions we design for around Seattle

Seismic Design

Western Washington is high seismic, including Cascadia subduction effects in the design ground motions.

How we design for it

Snow Load Steel Buildings

Eastern Washington, mountain passes and Idaho sites need snow and drift loads to ASCE 7.

How we design for it

Energy Code Building Envelopes

The Washington State Energy Code is among the strictest; insulation is designed to it.

How we design for it

On arrival

Receiving your steel at Seattle

Seattle or Tacoma?

Both are one gateway under the Northwest Seaport Alliance; the carrier’s rotation decides which terminal discharges your boxes.

Plan for the wet season

Keep insulation and panels covered on site through the rainy months.

Alaska jobs

Tell us early so containers can be timed to the northbound sailing.

Documents sent ahead to your broker

  • Commercial invoice and packing list per container
  • Bill of lading and certificate of origin
  • Container packing report with seal number and VGM
  • EN 10204 3.1 mill certificates
  • Shipping marks with a QR link to each member’s passport

What the quote states for Seattle

  • The Incoterm, for example FOB Vietnam, CFR or CIF Seattle
  • Who acts as importer of record
  • Containers, flat racks or breakbulk for oversize members
  • Delivery to the port or to a named US place, if offered

No prices, freight rates or duty estimates are published.

PEB Studio · real-time tracking

Follow every bundle from our shop floor to Seattle

Watch production stage by stage, open the container packing report when the seal goes on, and scan a member’s QR tag at the port or on site to see what it is and where it goes.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Built near Seattle

Industries and buildings this port serves

World Steel in the US

Projects we have shipped to the United States

All projects

Asked by US buyers

Seattle shipping questions

Why ship to Seattle rather than Los Angeles?

For Washington, Idaho, Montana and Alaska sites, Seattle cuts the inland leg sharply. We quote the Puget Sound gateway whenever the job is in the Northwest.

Can you supply steel buildings to Alaska?

Yes. Steel lands at Puget Sound and continues north on a domestic service; Alaskan snow and seismic loads are designed in from the start.

Who runs the Seattle container terminals?

The Northwest Seaport Alliance manages them; Terminals 5 and 18 are operated by SSA Terminals.

Keep reading

Related pages

Other West Coast ports

Building within reach of Seattle?

Send the site address and what the building is for. Our engineers confirm the design basis, suggest the gateway port and Incoterm, and return a written scope for steel made in our Vietnam plant.