Included in every scope
Detailing is part of the steel, not an extra
Shop drawings turn an engineer’s design into the exact pieces a plant makes: every plate, hole, weld and length. On World Steel projects they are prepared by our own detailers and included at no extra charge, on every project, whatever its size.
One less contract to buy
Many US jobs hire steel detailing as a separate trade. With World Steel the detailing sits inside the steel scope, so there is no second firm to find, schedule or pay.
The people who draw it make it
The detailers work from the same Tekla model our plant cuts and drills from, so a question on a sheet is answered by the team that will fabricate the piece.
Errors stop in Vietnam, not on your site
Steel crosses the Pacific before anyone on your site touches it. Getting every hole, plate and length right on paper first is what keeps field fixes off your schedule.
Your reviewers stay in control
Your Engineer of Record, architect or inspector stamps each sheet. The plant only receives a release for sheets marked approved.
The drawing set
Everything your team, our plant and your erector need
One Tekla Structures model produces every sheet below, so a piece mark on a plan always matches the assembly drawing and the tag on the steel.
Anchor rod plan
Rod layout, projection, diameter and grade, with the column reactions for every load case.
Used by Foundation engineer and concrete crew
Framing plans and elevations
Gridlines, frame lines, bracing, roof and wall framing, openings and girts, with piece marks for every member.
Used by Engineer of Record and general contractor
Assembly drawings
Each welded or bolted assembly with every plate, weld symbol, hole and dimension the shop needs.
Used by Our plant and your inspector
Single-part drawings
Plates, clips, stiffeners and purlins drawn one by one, with the CNC files that cut and drill them.
Used by Our cutting and drilling lines
Roof and wall sheeting
Panel layout, lap and fastener patterns, trims and flashings at every edge, opening and penetration.
Used by Envelope installer
Erection drawings
Where each piece mark goes by gridline and elevation, bolt types, sequence notes and temporary bracing.
Used by Your erector
Bolt and material lists
Bolts, nuts and washers by connection, plus the material list tied to mill certificates by heat number.
Used by Receiving and inspection
IFC model
The full steel model as IFC for clash checks with the architectural and MEP models.
Used by Architect, MEP and BIM coordinator
Reading a sheet
What is on an assembly drawing
An example of the assembly drawing for one rafter. Your reviewer sees the same information on every sheet.
Piece mark
The same mark is printed on the sheet, the steel tag in the plant and the erection drawing, so a member is never anonymous.
Dimensions in your units
Most US jobs are drawn in feet and inches; if your design team works in millimeters, the set is issued in millimeters.
Weld symbols
Size, type and length for each weld, drawn to AWS A2.4 symbols that your inspector reads without a key.
Holes and bolts
Hole size and type (standard, oversized or slotted) with the bolt grade, so the field bolt-up matches the design.
Revision cloud
Every change since the last issue is clouded and tagged with its revision letter, and listed in the title block.
Title block and stamp
Project, sheet, revision and the space for your reviewer’s stamp: approved, approved as noted, or revise and resubmit.
Where shop drawings fit
Proposal, approval, then shop drawings
Shop drawings are the third set of drawings on a World Steel project. They are detailed from the approved APD and Design Report, so the design your engineer signed off is exactly what the plant makes.
-
With the quotation
Proposal drawings
For projects World Steel designs: general arrangement, frame lines, elevations and the scope of supply the quotation covers, so you see exactly what the price includes.
Reviewed by: You, your architect and your estimator
See a sample set → -
After the contract is signed
Approval drawings (APD) and Design Report
Anchor rod plan with column reactions, framing plans, elevations and sections, plus the Design Report with the structural calculations. Your Engineer of Record reviews, approves and seals them for the permit.
Reviewed by: Your Engineer of Record, architect and building department
Learn more → -
After the APD is approved
Shop drawings and Tekla model
Assembly and single-part drawings, CNC files, roof and wall sheeting, erection drawings, bolt lists and the IFC model, all from one Tekla model. Included on every project at no extra charge.
Reviewed by: Your reviewer, then our plant
Learn more → -
Once sheets are released
Fabrication to the approved revision
Members are cut, welded, coated and inspected in our Vietnam plant against the approved revision, and PEB Studio records which revision every piece was made to.
Reviewed by: You, live in PEB Studio
Learn more →
Approval process
From the approved design to the steel on your site
One rule runs through every step: nothing is cut before the sheets that govern it are approved.
-
Kickoff and criteria
We confirm the design basis, the governing drawings, your units and who reviews the submittal on your side.
-
Model in Tekla
The approved design is modeled member by member, with every connection, opening and accessory placed.
-
Approval drawings (APD)
After the contract is signed, the anchor rod plan, framing plans and elevations go out with the Design Report of structural calculations for your Engineer of Record and building department.
-
Your review
Your reviewers mark up the set with their usual stamp. Each comment gets a written answer and is closed out in the next revision.
-
Release for fabrication
Only sheets marked approved are released to the plant. Nothing is cut, drilled or welded before then.
-
Made to the approved revision
In our Vietnam plant each member is made and inspected against its sheet, and PEB Studio logs which revision it was made to.
-
Erection set ships with the steel
Erection drawings and bolt lists travel with the containers, matched to the piece marks on every tag.
-
As-built record
At closeout the final revision of every sheet and the IFC model are frozen in PEB Studio as your record set.
Every project
However you buy, the shop drawings come with it
-
Complete building package
We design the building, then detail frame, secondary steel, sheeting, trims and openings in one set.
Included, no extra charge
-
Build to your drawings
Your Engineer of Record’s design is detailed by us and returned for their approval before anything is cut.
Included, no extra charge
-
Components-only supply
Frames, purlins, panels or trim are detailed piece by piece, with cutting lists for you to approve.
Included, no extra charge
-
Expansions and add-ons
New bays, lean-tos or mezzanines are detailed against the survey of your existing building.
Included, no extra charge
-
Built-up members
Girders, tapered rafters and crane runway members get plate-by-plate assembly drawings.
Included, no extra charge
-
OEM and private label
The steel is tagged under your brand, and the shop drawings are still prepared by our detailers.
Included, no extra charge
| How you buy | Shop drawings | Extra charge |
|---|---|---|
| Complete building package | We design the building, then detail frame, secondary steel, sheeting, trims and openings in one set. | None, included |
| Build to your drawings | Your Engineer of Record’s design is detailed by us and returned for their approval before anything is cut. | None, included |
| Components-only supply | Frames, purlins, panels or trim are detailed piece by piece, with cutting lists for you to approve. | None, included |
| Expansions and add-ons | New bays, lean-tos or mezzanines are detailed against the survey of your existing building. | None, included |
| Built-up members | Girders, tapered rafters and crane runway members get plate-by-plate assembly drawings. | None, included |
| OEM and private label | The steel is tagged under your brand, and the shop drawings are still prepared by our detailers. | None, included |
Drawn to US practice
The standards behind every sheet
Your reviewers see the conventions they already know. Design responsibility follows the contract: World Steel designs the metal building system, and your Engineer of Record reviews it.
| Document | How it shows up on the drawings |
|---|---|
| AISC 303 Code of Standard Practice | Sets out how shop and erection drawings are submitted, reviewed and approved between fabricator and design team. |
| AISC 360 | Members and connections on the drawings are designed to the AISC Specification for Structural Steel Buildings. |
| MBMA Metal Building Systems Manual | Metal building systems are designed to the practices in the MBMA manual. |
| AWS D1.1 and AWS D1.3 | Structural welds are detailed to AWS D1.1; sheet-steel welds are designed to AWS D1.3. |
| AWS A2.4 | Weld and inspection symbols on every sheet follow the standard American notation. |
| RCSC Specification | Bolt grades, hole types and tightening (snug-tight or pretensioned) are shown for each connection. |
Get started
What to send, and what comes back
Send us
- Design drawings and calculations, or the architectural set if we are designing the building
- Site address and the code edition your jurisdiction enforces
- Your preferred units: feet and inches, or millimeters
- Who reviews the submittal: Engineer of Record, architect or inspector
- Any BIM model (IFC) we should coordinate with
You receive
- Anchor rod plan with column reactions
- Framing plans, elevations and sections with piece marks
- Assembly and single-part shop drawings
- Roof and wall sheeting, trim and flashing drawings
- Erection drawings, bolt lists and the material list by heat number
- IFC model of the steel and PDF sheets for every revision
- All of it included in the scope at no extra charge