Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Data center steel for the Columbia Basin

Low-cost hydropower from the Columbia River dams brought large data center campuses to Quincy, East Wenatchee, Malaga and Moses Lake. Each new phase repeats a hall that has to be framed, clad and handed over on a fixed date, with heavy equipment on the roof and snow and wind on the plateau.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Washington port.

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington project is cut, welded, inspected and packed.

Q&A

What Washington buyers ask

Can you supply several phases of the same design?

Yes. Once the model is detailed, repeat phases are fabricated from it, packed per building and shipped to your schedule.

Do you supply the envelope too?

Yes. We can supply insulated metal panels with the frame, or only the steel if the envelope is bought separately.

Which port do you use for Central Washington?

Usually Seattle or Tacoma, with trucks over the Cascades on I-90. We plan the route and loads with your logistics team.

Washington solutions

Every Washington guide

Related pages

Code facts on this page summarize Washington rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Washington?

Send the drawings or the site address, size and use. We set the Washington design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.