Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Delaware · Cold storage

Structural steel for Port of Wilmington cold storage

The Port of Wilmington on the Delaware River is one of the leading US gateways for imported fresh fruit and frozen goods, with large cold storage warehouses on and around the port. These buildings need insulated envelopes, thermal breaks, dock framing and coatings for river air. We fabricate the steel for them.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore or New York for your Delaware site.

Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Hub
Port of Wilmington
Cargo
Fruit and frozen goods
Details
Thermal breaks
Coatings
For river air

Why it matters

Cold rooms on the river

A port cold store keeps fruit and frozen goods at set temperatures beside a busy waterfront, with many dock doors and frost risk under the slab.

We fabricate frames, girts and purlins for the insulated envelope, detail thermal breaks at the cold line and frame dock doors and canopies, with coatings chosen for the exposure.

What we design and fabricate

Steel for cold buildings

Freezer frames

Frames inside or outside the insulated box, as the design sets.

Thermal breaks

Details at columns, girts and penetrations.

Dock framing

Dock doors, canopies and vestibules.

Coatings

Galvanized or duplex systems for cold, wet rooms.

Who does what

Cold storage steel, split clearly

World Steel supplies

  • Frames, girts and purlins for the insulated envelope
  • Thermal break details at columns and penetrations
  • Dock door framing and canopies
  • Coating systems chosen for cold, wet rooms
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Refrigeration design and equipment
  • Engineer of Record approval and PE seal
  • Insulated panels and vapor barrier
  • Heated slab and foundations
  • Erection and site work

Delaware

What we do not claim

World Steel names no Delaware cold storage operator as a customer. Refrigeration design and panel installation are your team’s scope.

Delaware ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Delaware contractors

Delaware contractors: let’s win the next project together

If your next bid involves port cold storage, World Steel wants to be your long-term, win-win steel partner in Delaware. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Delaware project is cut, welded, inspected and packed.

Labeled stacks of steel plate under a gantry crane
Raw plate stock waiting in the World Steel yard, Vietnam.
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.

Q&A

What Delaware buyers ask

Do you detail thermal breaks?

Yes. Thermal breaks are detailed at columns, girts and penetrations.

Do you supply insulated panels?

Yes, insulated metal panels can be part of the package.

Do you design refrigeration?

No. Refrigeration is your team’s scope; we support it.

Official sources: Port of Wilmington

Building in Delaware?

Send the drawings or the site address, size and use. We set the Delaware design basis with your Engineer of Record, design or detail the steel to the county or city building code and coastal wind, and quote it made in our plant in Vietnam, packed in erection order and delivered through Baltimore or New York to your Delaware site.