Laps
Side and end laps sealed and fastened to the pattern on the shop drawings.
Roof plan
ASCE 7-22 splits a roof into corner, edge and field zones for components and cladding. Pick a zone to see where it sits and what we change there.
Plan view, not to scale. Zone widths come from the building size and the code.
What changes in the corners
What changes in the edges and ridge
What changes in the field
Before anything is made
Side and end laps sealed and fastened to the pattern on the shop drawings.
Curbs and flashings for fans, vents and rooftop units resolved before anything is made.
Ridge, eave, gable and wall-to-roof flashings drawn in full, where most roofs leak.
Roof pitch, gutters and snow retention planned with the drainage system.
Photo
Photo
Photo
US codes
Suction peaks at roof corners, edges and ridges. Panel, clip or screw, and purlin are all checked against the same zone pressure.
Screw type, pattern and pull-out values come from tested assembly data and the project engineer’s design.
Laps, penetrations and flashing transitions are where roofs usually leak, so those details are resolved on the shop drawings before anything is made.
Insulation thickness and cool-roof finishes follow the energy code adopted for your climate zone, typically the IECC or ASHRAE 90.1.
Panel coating and fastener material are matched to the exposure, whether that is salt air, de-icing salt or a livestock barn.
Roof pitch, gutters and snow retention are planned for local rainfall intensity and, in cold regions, for ice dams and sliding snow.
Owners should check screws, sealant and flashings every year and after heavy storms or snow events.
Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
5,000 t
Sunpro Steel Factory
Can Tho City, Vietnam · 2024
2,500 t
CPV Food Processing Factory
Dong Nai Province, Vietnam · 2020
2,000 t
Long Son petrochemical
Ba Ria–Vung Tau, Vietnam · 2022
2,000 t
M&D warehouse, Thailand
Thailand · 2024
1,500 t
Tongwei feed factory, phase 1
Dong Thap Province, Vietnam · 2018
1,000 t
New Era cold storage, phase 1
Tay Ninh Province, Vietnam
In the catalog
Photo
Photo
Roof sheets are screwed through, or held by concealed clips, to the purlins below.
Design limit: Purlins can be no farther apart than the panel’s tested span allows at the ASCE 7 roof pressure, which tightens at corners, edges and ridges. · What gets checked: Screw type, spacing and sealing are compared with the approved roof drawings.
Roof insulation sits over the purlins under the sheets, or comes built into insulated panels.
Design limit: Thicker insulation needs longer screws and can change the panel standoff or clip height. · What gets checked: Look for an unbroken vapor retarder with every facing seam taped.
Gutters and flashings fix along the eaves, the ridge and any valleys.
Design limit: Gutter size follows the design rainfall rate, and every valley or parapet gutter needs a way for overflow to escape. · What gets checked: Run water through the gutters and downspouts to confirm flow.
Ventilators and other roof penetrations are flashed into the roof sheets.
Design limit: Curbs and flashings are shaped to the exact rib profile of the roof panel. · What gets checked: Water test around each penetration.
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
We do not label a roof with a wind or hurricane rating. Performance comes from tested assembly data and the project engineering for your site, which your Engineer of Record reviews.
ASCE 7-22 gives corners and edges higher components-and-cladding pressure than the field of the roof. The fastening pattern and purlin spacing follow those zones.
Ground snow load, drift at steps and parapets and sliding snow are part of the frame and purlin design. In cold regions roof pitch, snow retention and ice dams are planned with the drainage.
At laps, penetrations and flashing transitions. We draw those details on the shop drawings before fabrication so your roofing crew installs exactly what was designed.
The one adopted for your climate zone, usually the IECC or ASHRAE 90.1. Thickness and cool-roof finishes are confirmed with your design team.
Yes. Our largest jobs include about 2,000 t of steel structures covering more than 56,000 m² at the Long Son petrochemical complex, and the plant fabricates 2,500 t of structural steel a month.
Keep reading
Price it or partner with us
We engineer the panel, the purlins and the fastening together for your wind and snow loads, and draw every flashing before we cut a sheet.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Have this system engineered for your site
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.