Phase by phase
How a campus grows in steel
-
Master plan in
We read the campus plan with your team: hall footprints, yards, racks and the order they will be built.
-
First hall designed to repeat
Bay sizes, frames and connections chosen so the same design works for the next halls.
-
Future connections detailed
End walls, expansion joints and rack extensions detailed now, so the next phase bolts on.
-
Each phase re-checked
Loads, codes and site data checked again for each new hall before it is fabricated.
Why repeat pays
What a repeatable design gives your campus
Less engineering each phase
The next hall starts from an approved design, so review focuses on what changed.
Faster fabrication
Repeated members run through our lines as a known family of parts.
Familiar erection
Your contractor’s crews erect the same connections and sequence each time.
Clean records
One piece-mark system and one Manufacturing Data Record format across the campus.
Capacity for campus scale
A plant sized for more than one hall at a time
World Steel Group fabricates up to 2,500 metric tons (about 2,750 US tons) of structural steel a month in its own plant in Vietnam. That lets a large US contractor run the halls of a campus in overlapping phases, with the next building in fabrication while the last is still being erected.
Each phase is a project of its own in PEB Studio, so your team can see what is cut, welded, coated and packed for every hall separately.