Solutions · PEB Studio

See your building being made, from anywhere in the US

Buying a building made on the other side of the Pacific should not mean waiting for status emails. Our plant runs on PEB Studio, and you get your own login to follow every member of your building through cutting, welding, inspection, coating, packing and shipping as it happens.

Your access
Your own login, set up at kickoff
Updates
As each step is scanned in the plant
Every member
An ID and QR label from the model to your site
Runs on
Any browser, on a laptop, tablet or phone

PEB Studio in numbers

One platform from the model to your jobsite

1
ID and QR label per steel membertraced from the Tekla model to your jobsite
9
linked modulesone record from the Tekla model and bill of materials through to erection and closeout
19
packing-list languagesso your receiving crew reads it in its own language
1
named project manageraccountable from contract to final delivery

Why it matters

What changes when you can see the plant

No more “is it ready?”

You see which assemblies are welded, which wait on coating inspection and which bundle is already in a container.

Problems surface early

A failed inspection and its repair show up on the member’s record, not weeks later at the jobsite.

Your team plans ahead

Your erector and foundation crew can plan around real progress, not an estimate.

Records your official accepts

Mill certificates, weld records and inspection results are collected as the work happens, ready for your permit file.

Find any piece on site

Scan a QR label to see where a member goes, its bundle and the parts it connects to.

Closeout without a chase

The quality documents for turnover are already in one place when the last container leaves.

Worry-free shipping

The shipping is planned for you, and you can watch it happen

Our logistics team knows US ports, customs and trucking, and plans the fastest workable route to your site around your schedule. PEB Studio is where you see that plan play out, container by container.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Design optimization

An optimized design, tracked piece by piece

The design you approve is already optimized for tonnage, cost and container shipping. PEB Studio then shows each member move from approved drawing to production slot to container, with the mill certificate of its steel attached.

  • Optimized steel tonnage

    Tapered built-up frames follow the bending moment, and bay spacing, purlins and girts are tuned as one system. Your building carries the same code loads with the steel it actually needs, and the proposal reports the tonnage for your project.

    Tapered framesBuilt-up steel sectionsZ purlins

  • Lower investment cost

    Less steel to buy, fewer shop hours, fewer containers and simpler bolted erection all lower the installed cost of the building. The proposal shows the effect of each option on your project, never a generic percentage.

    Complete building packageBuilding packagesComponents-only supply

  • In-depth project assessment

    Engineers review your drawings, the code edition your jurisdiction enforces, wind, snow and seismic data, foundations, erection sequence and the route to your site, then write down the risks and options they find before you commit.

    Steel building designDesign processUS codes & standards

  • Designed to ship in containers

    Every member is detailed to fit inside a standard 20 ft or 40 ft shipping container, with splices placed by the engineer, not cut on the shop floor. Containers are the most economical way to move steel from Vietnam to the US, and they reach your port sealed.

    Shipping Vietnam to USAExport packing & shippingIncoterms for steel buildings

  • Fast response to your production schedule

    Design, detailing and fabrication sit under one roof, and the materials are already available in Vietnam, so approved drawings move into production without waiting on imported steel. Your production slot is booked against your site date and tracked live in PEB Studio.

    Shop drawings, includedPEB StudioProject management

  • Quality materials from Vietnam plants

    Most of the plate, coil and sections come from steel plants in Vietnam, ready for our plant without long import queues. Each heat arrives with the mill’s EN 10204 type 3.1 inspection certificate, and its heat number follows every member it goes into.

    World Steel factoryQuality controlIAS AC472 accreditation

What you follow

Every stage your members pass through

  1. Next step Request a quote →

Sample of the stages we track; this is not data from a live job.

Who uses it

One project, a view for each person on your team

PersonWhat they look at
Owner or buyer Progress by stage and area, shop photos and shipping documents
General contractor Container contents and arrival paperwork to plan receipt and erection
Engineer of Record or inspector Weld records, inspection results and the released drawing revision
Erector on site Piece location by gridline and elevation, erection step and bundle

Inside PEB Studio

A look at the screens

Five views your project team uses, shown with demonstration data from a training project rather than a real customer order.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Shop drawings, included on every projectHow PEB Studio works step by stepDigital quality records

Asked by US buyers

Questions about pEB Studio real-time tracking

Is PEB Studio access included?

Yes. Every buyer gets a login to follow their own order, set up at kickoff.

Can my contractor and engineer get access?

Yes. Your project manager adds the people on your team who should see the project, each with their own login.

Can other customers see my project?

No. Every request is checked against your project and your role, so a login only reaches that customer’s own order.

Do I need to install anything?

No. PEB Studio runs in a web browser on a computer, tablet or phone.

Can I see it before I buy?

Yes. Ask for a demonstration on a training project with sample data.