New Mexico · Food plants
Structural steel for New Mexico dairy and cheese plants
New Mexico is one of the larger dairy states, with big herds and cheese plants on the eastern plains around Clovis, Portales and Roswell, plus chile and food plants along the Rio Grande. These are wet, cold, busy buildings. We fabricate their halls, platforms and cold room steel.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your New Mexico site.
- Hubs
- Clovis, Portales, Roswell
- Plants
- Dairy, cheese, chile
- Coatings
- Washdown systems
- Cold rooms
- Thermal break details
Why it matters
Washdown rooms on the plains
A cheese plant combines washdown process rooms, coolers and docks, often in hard wind with hot summers and cold nights. Expansions usually go up beside a plant that keeps running.
We choose galvanized, duplex or paint systems for each room, detail thermal breaks for cold rooms and release the steel in phases that fit the owner’s plan.
What we design and fabricate
Steel for food plants
Process halls
Clear-span halls over production lines.
Platforms and mezzanines
Equipment platforms, catwalks and mezzanines.
Washdown coatings
Galvanized, duplex or paint systems for wet rooms.
Cooler and freezer steel
Frames with thermal breaks for cold rooms.
Who does what
Plant steel, split clearly
World Steel supplies
- Process hall, platform and mezzanine steel
- Coating systems chosen for each room
- Phased releases next to running lines
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process layout with the owner and equipment suppliers
- Engineer of Record approval and PE seal
- Food safety and sanitation design
- Equipment setting and piping
- Erection and site work
New Mexico
What we do not claim
World Steel names no New Mexico food company as a customer and makes no food safety or sanitation claim. Food safety design is the owner’s and their team’s scope.
New Mexico ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Mexico contractors
New Mexico contractors: let’s win the next project together
If your next bid involves dairy and cheese plants, World Steel wants to be your long-term, win-win steel partner in New Mexico. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Mexico project is cut, welded, inspected and packed.
Q&A
What New Mexico buyers ask
Which coatings suit dairy plants?
Usually galvanizing or duplex systems in wet rooms, confirmed by your team.
Can you build beside a running plant?
Yes. We release the steel in phases that match the owner’s shutdowns.
Do you design the process?
No. Process, refrigeration and sanitation design are your team’s scope.
Official sources: New Mexico Department of Agriculture
New Mexico solutions
Every New Mexico guide
Related pages
Code facts on this page summarize New Mexico practice, the New Mexico Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Mexico?
Send the drawings or the site address, size and use. We set the New Mexico design basis with your Engineer of Record, design or detail the steel to the New Mexico Commercial Building Code, Rio Grande seismic rules and altitude snow, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail or truck to your site.