Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Office block of World Steel standing between two fabrication halls

The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

A fabricator, not a broker

Buy your steel building from the people who weld it

World Steel engineers, fabricates, inspects and packs your steel in one operation it owns, then ships it from Vietnam to your US port. No trading desk sits between your order and the welder.

The World Steel DNA

Why US buyers can order steel from Vietnam with confidence

Ordering a building from a plant on the other side of the Pacific only works if you can see into it. World Steel gives US owners, contractors and engineers three things to check rather than three promises to trust: an accredited quality system, a production plan tied to your erection sequence, and a live view of every member.

Welder looking over the stiffeners and end plate of a heavy column Quality

Quality without shortcuts

One accreditation from design desk to paint hall

The engineers who size your frame and the crews who weld it work under the same IAS AC472 accreditation, so nothing is handed to an outside shop. QC signs off each member at every hold and witness point your ITP names, and that sign-off stays attached to the member until it ships.

  • IAS AC472 Part A (fabrication) and Part C (design)
  • EN ISO 3834-2 certification for the welding quality system
  • AWS D1.1 weld acceptance backed by WPS and welder qualification records
  • Coating systems selected under ISO 12944 for the site exposure, with film thickness recorded
How we control quality →
Painted members strapped into bundles and stacked for the voyage Schedule

A schedule that holds

Fabrication order follows your erection order

Shop work starts from the sequence your erector will set steel in, not from whatever is easiest to cut. Your project manager watches each stage, loads containers to match erection steps, and catches a missing piece at the plant in Vietnam, well before your crane arrives on a US site.

  • A plant of our own with 2,500 t a month of fabrication capacity
  • The same project manager from approval drawings through handover
  • Production reports every week, so slippage shows up early
  • Each bundle and container tied to a step in the erection plan
How we manage your project →
PEB Studio: production progress by stage, demonstration data Control Demonstration data

Total control, in real time

The factory floor, open in PEB Studio

From your office in the US you can sign in to PEB Studio and follow your own members through cutting, welding, coating, inspection and packing. A single ID and QR code ride with each piece from the 3D model to the laydown area, so its location is never a guess.

  • A client login that shows only documents released to you
  • Factory inspections you can join by Zoom or Microsoft Teams
  • Each container closed out with photos, video and a sealed packing report
  • Handover files frozen digitally so any later change is evident
See digital project control →

You do not pay extra for any of this. It is the standard way World Steel runs a US order, whichever state the steel is headed to.

The case for World Steel USA

Eight things a US buyer gets on every order

Every card opens the page with the method, the records or the shop photos that back it up. If we cannot show it, we do not claim it.

Long shop floor of built-up members, overhead cranes and a center walkway Photo

A fabricator, not a broker

The frame on your truck was cut and welded by World Steel in its own Vietnam plant. One company answers for the design office and the shop floor, both audited under a single IAS AC472 accreditation.

Inside the factory →
Rows of columns, rafters and purlins inside a large steel building Photo

Designed to the codes your permit uses

Frames are checked against IBC 2024 and ASCE 7-22, AISC 360 for built-up and hot-rolled steel and AISI S100 for cold-formed members, unless your Engineer of Record names another basis. SAP2000 runs the analysis; Tekla Structures details each piece.

Engineering & standards →
Coated members drying in rows on stands in the paint hall Photo

Loads set for your county, not a catalog

Wind, snow, seismic and exposure category are taken from your site address and your jurisdiction before a single member is sized. Coating is picked for the corrosivity your steel will actually face.

High-wind design →
Long factory building framed with red tapered portal frames and roof purlins Photo

One package, one scope sheet

Primary frames, purlins and girts, roof and wall panels, trim, gutters, doors and windows ship as a coordinated set, and a written scope tells your team what is in it and what is not.

Complete building solutions →
Pair of red truss assemblies with bolted connection plates inside the shop Photo

Value Engineering your EOR can approve

Our engineers test bay spacing, frame type, spans and connections against your drawings and list the options. Your Engineer of Record decides which ones go into the building.

Value Engineering →
Inspector walking a line of painted built-up members on the shop floor Photo

A project manager with your name on the file

The same project manager stays on your job from approval drawings until the last container is loaded, sends progress reports, and arranges on-site supervision or remote help for your erector.

Project management →
Welder looking over the stiffeners and end plate of a heavy column Photo

A shop floor you can log into

Your PEB Studio account shows your own members moving through cutting, welding, coating and QC release. Hold points can be witnessed live on Zoom or Microsoft Teams from your office.

Digital project control →
Painted members strapped into bundles and stacked for the voyage Photo

Bundles that match your erection plan

Steel is grouped by erection area and sequence, tagged and loaded at the plant, and each container is documented with a packing report, seal number, photos and video before it sails for a US port.

Vietnam to USA logistics →

Numbers you can check

The operation your project draws on

20,000 m²

plant site (about 215,000 sq ft) in Tay Ninh Province

2,500 t

metric tons of structural steel fabricated a month

300+

engineers, fabricators and QC staff

140

projects published on this site

14

countries that have received our steel

7

certifications on file, listed further down

Mr. Nguyen Khanh Lam, CEO and Chairman, World Steel Group

Leadership

A message from our CEO & Chairman, and the team you work with

Mr. Nguyen Khanh Lam, CEO & Chairman of World Steel Group, explains what World Steel does for US contractors. Read his letter and meet the World Steel USA team.

Meet our team →

Supplier checklist

Six questions to put to every metal building bidder

Run every bid through them, ours included. Below are World Steel USA’s answers and where to verify each one.

Ask thisWhy it mattersOur answer
Who welds the steel? A broker passes your order on; a fabricator owns every weld and every hole. World Steel, at its own plant in Hai Son Industrial Park, Tay Ninh Province. Details →
Is the design office and the plant audited by a third party? Plan reviewers and special inspectors want to know how fabrication quality is controlled. IAS AC472, Part A fabrication and Part C design, valid to Aug 1, 2027. Details →
What design basis is on the calculations? Your building department reviews against the IBC edition and amendments it has adopted. IBC 2024 and ASCE 7-22 by default, or the edition and basis your Engineer of Record sets. Details →
Can I see my steel before it leaves the plant? Correcting a part in the shop costs far less than correcting it with an erector and a crane waiting. Yes: live witness on Zoom or Teams, an inspector you appoint, or a visit to the plant. Details →
What does the quote leave out? Unpriced foundations, freight or duties turn a low number into a change order. A written scope of supply that names every inclusion, every exclusion and the Incoterm. Details →
Who picks up the phone after the contract? Overseas supply needs one accountable person, not a general inbox. A named project manager who owns your order from approval drawings until the steel is delivered. Details →
Get a competing quote Holding another supplier’s number? Send it along with the drawings and we will compare scope line by line.

How it works

From first inquiry to steel on your slab in seven steps

Each step ends with a document or a login you can verify, so an overseas fabricator never becomes a black box.

  1. Share the project

    Footprint, eave height, use and site address, as a sketch or a drawing set.

    You receive: A technical review of your inputs

  2. Engineering & Value Engineering

    Code edition, loads and framing are fixed for your jurisdiction.

    You receive: Design basis and VE options for your EOR

  3. Quote & scope

    Each line priced, each maker named, the Incoterm stated.

    You receive: Scope of supply with inclusions and exclusions

  4. Approval drawings

    Nothing is cut until you and your EOR sign off.

    You receive: Anchor rod plan, reactions and approval set

  5. Fabrication & QC

    Cutting, welding and coating, each stage released by QC.

    You receive: PEB Studio login, witness points, QC records

  6. Packing & ocean freight

    Bundled to your erection sequence and loaded at the plant in Vietnam.

    You receive: Packing lists, seal numbers, container photos

  7. Erection support

    Your erector works from drawings that match the piece marks.

    You receive: Erection drawings, site or remote support

Open production

Skip the status calls. Check the shop floor yourself.

PEB Studio is the system our own plant runs on, and your client account reads from it directly: member-by-member progress, weld and coating results, QC releases and packing. A production report lands in your inbox every week.

  • Remote witness

    Attend hold points on Zoom or Microsoft Teams.

  • Third-party QA

    Send the inspection agency you trust.

  • Plant visit

    Tour the shop with our QC inspectors.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Track record

World Steel buildings on US soil

US jobs are listed first, followed by work from the same plant across 14 countries.

All 140 projects
IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472

Credentials

Accreditations listed with issuer and expiry

All held by World Steel Construction JSC. Each row names the issuer, the expiry date and whether we have confirmed it with the issuer directly.

CertificationNumberIssuerValid untilStatus
IAS AC472 — Metal Building Systems—International Accreditation Service (IAS)Aug 1, 2027 Verified
EN ISO 3834-2 Welding QualityINY-CER/23/1056 Rev.0Bureau Veritas Vietnam— Details confirmed in quote
EN 1090 EXC3 (CE marking)2797 CPR 827443BSI Group The Netherlands B.V. (NB 2797)— Details confirmed in quote
AS/NZS 5131 CC3BMP 827566BSI Group ANZ (Benchmark, JAS-ANZ accredited)Jul 31, 2030 Details confirmed in quote
ISO 9001:2015786902Guardian Independent Certification Ltd (UKAS accredited)Sep 5, 2029 Details confirmed in quote
ISO 14001:2015799559Guardian Independent Certification Ltd (UKAS accredited)Sep 5, 2029 Details confirmed in quote
ISO 45001:2018721070Guardian Independent Certification Ltd (UKAS accredited)Sep 11, 2029 Details confirmed in quote

No AISC or CSA W47.1 certification is held or claimed. IAS AC472 for US buyers →

Clear responsibility

Our scope and your local team’s scope, in writing

A good supplier tells you where its work stops. Your scope of supply spells it out item by item before any contract is signed.

World Steel USA supplies

  • Metal building design, calculations and approval drawings for your EOR
  • Primary frames and secondary members fabricated in our plant in Vietnam
  • Roof and wall panels, trim, flashing and gutters
  • Doors, roll-up doors and windows sourced from World Steel partners
  • Shop coating, QC records and a PEB Studio login
  • Export crating, container loading and ocean freight coordination
  • Erection drawings with site or remote support

By your local team, unless the contract says otherwise

  • Foundations and anchor rod setting
  • Erection labor, cranes and site safety
  • Permits and building department approvals
  • MEP work and site utilities
  • Customs entry and inland delivery, unless the Incoterm covers them

Add-ons such as HVAC, lighting, fire protection or solar can be quoted for a project and appear as separate lines.

Vietnam → United States

American buyers already source heavily from Vietnam

Ordering steel from Vietnam puts you in good company. The federal government’s own trade figures for all goods show imports from Vietnam climbing fast enough to rank it among the biggest sources of US imports.

2023

$114.4B

US$ billion

-10.3% vs 2022

#7 US import source

2024

$136.3B

US$ billion

+19.2% vs 2023

#6 US import source

2025

$193.9B

US$ billion

+42.2% vs 2024

2026 (Jan–Sep)

$204.8B

US$ billion

+45.7% vs Jan–Sep 2025

Already above all of 2025

Values are goods imports in nominal dollars without seasonal adjustment. Each rank is the position Vietnam held by import value in that year’s Census Bureau top-partner table. The 2026 row is January through September only. Sources: Census Bureau: US trade in goods with Vietnam, by year; Census Bureau: 2023 ranking of US trading partners; Census Bureau: 2024 ranking of US trading partners; USTR: Vietnam trade summary.

FAQ

Questions US buyers raise before they sign

Does World Steel USA have a US office or warehouse?

World Steel has a US office at 7302 Emerson Ave, Westminster, CA 92683. There is no US warehouse or yard: engineering and fabrication happen in Vietnam, and we work with US owners, contractors and engineers directly by phone, email and video call. A dedicated project manager is your single contact, and erection can be supervised on site or supported remotely when the contract includes it. Your local erector and trades do the site work.

Has World Steel supplied projects in the United States?

Yes. Published US references include Addario, Apache Camper Center, North West Community Center and NYT Warehouse in New York, plus projects in the US territory of Guam built under US codes. In total the plant has shipped to 14 countries, and the projects page lists every published job.

Will the design satisfy my building department?

We design to IBC 2024 and ASCE 7-22 unless your Engineer of Record or your jurisdiction’s adopted edition calls for something else, and we supply the calculations and drawings plan review asks for. Your Engineer of Record reviews and approves them for the permit. The permit decision always rests with the building official.

Can World Steel claim AISC certification?

No, and we never say so. The design office and the factory are accredited under IAS AC472 for metal building systems, a program tied to the special inspection provisions of IBC Chapter 17. Whether it satisfies your inspection requirements is the building official’s call.

How can I check fabrication from the US?

Hold and witness points are written into the Inspection and Test Plan. Join them live on Zoom or Microsoft Teams, send a third-party inspector, or fly in and walk the plant. Between visits, PEB Studio shows the status of every member.

Who handles duties and import paperwork?

Each quote states the Incoterm and who acts as importer of record. Imported steel can be subject to US duties, for example under Section 232, and the quote says who carries them. Federal buyers should confirm any domestic-content rules with their contracting officer before ordering.

What is outside the World Steel supply?

Foundations, anchor rod setting, erection labor and cranes, permits, MEP and other site work are by others unless your contract says otherwise. The scope of supply lists them line by line.

What do you need to start a quote?

Building dimensions, intended use and the site address are enough for a first review. A drawing set, a geotechnical report or your Engineer of Record’s criteria let us price tighter, and we will tell you what else would help.

Who makes your steel

See the World Steel plant before you order

Gate of the World Steel plant with the office block and two of its fabrication halls Welder beside a deep built-up girder running through the automatic line Coated members drying in rows on stands in the paint hall
  • 2,500 t a month fabrication capacity
  • IAS AC472, first and only in Vietnam
  • IAS audits twice a year since 2019
  • Laser cutting of plate up to 100 mm
  • 300+ in engineering, shop & QC
  • OEM supply under your brand

Open call · US contractors

World Steel is looking for US contractor partners

General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.

You bring

  • Your market and owners
  • EOR approval and permit
  • Foundations and erection

We bring

  • 2,500 t a month, own plant
  • IAS AC472, first in Vietnam
  • Engineering and shop drawings

Bid your next US building against World Steel USA

A sketch, a footprint or a full set of drawings is enough. We return an engineering review and an itemized scope so you can compare suppliers on substance.