Cooling
Roof dunnage and platforms for chillers and air handlers.
The data center shell ecosystem
Cooling, power and cable each need steel in the right place. We model the supports with the frame, so the hangers, dunnage and platforms meet a beam where the services run. Each layer opens the products behind it.
Roof dunnage and platforms for chillers and air handlers.
Hung supports for busway and electrical gear.
Cable tray supports and bridges between rooms.
Columns, frames, roof and wall steel: the shell itself.
MEP equipment, busway, cable tray and their installation belong to the MEP contractors. Foundations and erection belong to the US contractor, our customer.
Outside the data hall
A data center is more than its hall. Chillers, generators, transformers and the bridges between them all stand on steel, and on a large campus that steel adds up. We design it with the shell, in the same model.
Chillers, generators, transformers and their installation come from the equipment and MEP contractors. We supply the steel they stand on and the screens around them.
Large projects
A data center campus is many shells on one schedule. World Steel supplied more than 56,000 m² (600,000 sq ft) of steel structures at the Long Son petrochemical complex in Vietnam, building after building, and runs several large projects through the shop in parallel.
Photo
Long Son, 56,000 m²
Photo
One building of many
Photo
A clear hall Projects outside the US, shown for their scale; they are not data centers or US sites.
Fabrication capacity
2,500 metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →The in-depth solution
Data halls, heavy roof and MEP loads, equipment yards, pipe and cable racks, multi-story blocks, phased campuses, fast-track schedules, tolerance and vibration, and seismic design: how World Steel engineers and fabricates every part, with 2,500 t (about 2,750 US tons) of capacity a month.
In-depth articles
Forty in-depth articles on planning, rating, laying out, cooling, powering, protecting and building a US data center, each read from the structural side: what the frame has to carry, where it sits on the schedule, and how World Steel designs and fabricates the steel for it in Vietnam.
Built on Hwaiyu Geng (ed.), Data Center Handbook, 2nd edition (Wiley, 2021), paraphrased and cited by chapter, with US codes and standards.
Sustainability, energy, data center types, edge sites and the cost picture.
Risk thinking, site search, Risk Category IV, performance-based seismic design and reuse of existing buildings.
Wind, roof snow and rain, flood, lessons from Sandy and Tohoku, and post-event inspection.
TIA-942, Tier redundancy, ASHRAE thermal guidance, BICSI 002 and NFPA 75.
Floor loads, ceiling height, column grid, raised floor and the overhead support steel.
Containment, economizers, liquid cooling, roof plant and the air the steel breathes.
Generator yards, UPS and battery rooms, microgrids, grounding and electrical galleries.
Project management, modular delivery, fire ratings, reliability and future growth.
Real World Steel frames
Frames by World Steel standing before the roof goes on, and the members behind them in our shop. Tap a photo to open it full size.
Photo
Frame line before the roof
Photo
Rafters from below
Photo
Columns on a bare site
Photo
Members in the shop
Photo
Checked before release Projects outside the US, shown for the structure type; they are not US sites.
Large projects by World Steel
Buying steel from outside the US
US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.
The worry: “Will steel designed overseas pass US plan check?”
We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.
The worry: “I can’t see the quality from across the Pacific.”
Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.
The worry: “Will the materials be traceable to the grade on the drawings?”
Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.
The worry: “What if pieces don’t fit when they reach the site?”
Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.
The worry: “How will I know where my order really is?”
You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.
The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”
Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.
The worry: “Who handles customs and duties?”
Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.
The worry: “Time zones and language will slow everything down.”
Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.
The worry: “Who erects it, and who stands behind the field work?”
World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.
The worry: “Who is responsible for the design?”
We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.
What the package contains
In a data center shell the steel carries more than the roof. Cooling units sit on rooftop dunnage, cable tray and busway hang from the frame, and every penetration has to stay weathertight. We model those supports with the structure in Tekla, so brackets and platforms arrive cut and drilled, and we hand your MEP designers a frame they can route around before anything is fabricated.
standard = in the base scope · optional = add if you want it · confirm = depends on your design
Talk to an engineer
Our engineers work in English. We model the frame, the roof dunnage and the MEP support steel together and send a written scope for the steel.
Asked by data center contractors
12 answers on the shell, roof loads, campuses and scope.
The primary frame, roof and wall steel, roof dunnage for cooling equipment, hung-load supports for ductwork, busway and cable tray, and where needed mezzanines and multi-story framing. Cladding and insulated panels can be added. The in-depth guides on our data center pages explain each part.
Yes. Equipment weights and positions from the mechanical engineer go into the frame design, and roof dunnage is detailed so units sit on steel aligned with the frames below.
No. MEP equipment and its installation belong to the MEP contractors. We supply the steel that carries it, coordinated in one Tekla model so supports land where the services run.
Yes. Our plant fabricates 2,500 t (5.5 million lb) of structural steel a month, several projects move through the shop in parallel, and campus buildings are packed and shipped building by building or phase by phase with production slots confirmed in the quote. For scale, World Steel supplied more than 56,000 m² (600,000 sq ft) of steel structures at the Long Son petrochemical complex in Vietnam.
The first phase sets the frame, connection and support details; later phases reuse the model, so a phase two order starts from drawings already approved.
IBC 2024 and ASCE 7-22 by default, or your jurisdiction’s edition, with AISC 360, AISC 341 where seismic design calls for it, and the owner’s own specifications for deflection, vibration and tolerance.
Your Engineer of Record reviews and approves the calculations and drawings we prepare. The approval, the PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.
Yes. Screen walls around generator yards, transformer yards and rooftop equipment are framed in steel and designed for wind, with girts for the screen panels or louvers your design team chooses.
Yes. Pipe racks and cable bridges between the data halls, the central plant and the power yard are designed and fabricated with the campus steel, with access walkways where maintenance needs them.
Yes. Ground-level gantries or elevated platforms for chillers and dry coolers keep heavy, vibrating equipment off the hall roof. We design them for the operating weights and the wind; vibration isolation comes from the equipment supplier.
No. World Steel designs, fabricates and supplies the steel. Foundations, erection, MEP installation and site work are the scope of the US contractor, our customer, and the trades they hire.
No. Send the bid documents or the layout, the equipment schedule and the site address and we return a written scope and quotation.
Keep reading
Send the bid documents, the equipment schedule and the site address. We model the frame and every support layer together and send a written scope for the steel, made in our plant in Vietnam.