Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Building package · Data center shell

One frame, four layers of load.

A data center shell is a steel frame that everything else hangs on: cooling on the roof, busway and cable tray below it, sometimes floors stacked above. World Steel, a structural steel fabricator producing 2,500 t (5.5 million lb) a month in our own plant in Vietnam, details every layer in one model and ships whole campuses, phase by phase, to your US contractor.

Switch the layers on and off
STRUCTURE CABLE POWER COOLING

Structure. Columns, frames, roof and wall steel: the shell itself.

Cable. Cable tray supports and bridges between rooms.

Power. Hung supports for busway and electrical gear.

Cooling. Roof dunnage and platforms for chillers and air handlers.

Diagram, not a design. Supports are placed from your MEP engineer’s layouts.

2,500 t
a month of structural steel
56,000 m²
of steel structures at Long Son
1 model
frame, dunnage and MEP supports
AC472
IAS-accredited plant
Inside a long steel building with grey columns and a clean floor, Long Son, Vietnam Photo · Long Son

The data center shell ecosystem

Every layer lands on the same steel

Cooling, power and cable each need steel in the right place. We model the supports with the frame, so the hangers, dunnage and platforms meet a beam where the services run. Each layer opens the products behind it.

Outside the data hall

The steel in the yard around the hall

A data center is more than its hall. Chillers, generators, transformers and the bridges between them all stand on steel, and on a large campus that steel adds up. We design it with the shell, in the same model.

DATA HALL CHILLERSGENERATORSPIPE BRIDGETRANSFORMERSSTAIRSPLANT
  1. Chiller gantryElevated steel platform for chillers and dry coolers, with stairs and catwalks.
  2. Generator yard screensSteel screen walls framed for wind around the generators.
  3. Pipe and cable bridgeA rack linking the hall to the central plant and the power yard.
  4. Transformer yard screensScreen and security framing around the electrical yard.
  5. Access stairs and catwalksSteel stairs, ladders and walkways to every roof and platform.
  6. Central plant buildingA smaller steel building for pumps, switchgear or storage.

Chillers, generators, transformers and their installation come from the equipment and MEP contractors. We supply the steel they stand on and the screens around them.

Large projects

Campus-sized steel, phase by phase

A data center campus is many shells on one schedule. World Steel supplied more than 56,000 m² (600,000 sq ft) of steel structures at the Long Son petrochemical complex in Vietnam, building after building, and runs several large projects through the shop in parallel.

Drone view of a long steel building across the Long Son petrochemical complex Photo Long Son, 56,000 m²
Long grey-roofed steel building among process plant at Long Son Photo One building of many
Grey steel columns and roof frame inside a long building Photo A clear hall

Projects outside the US, shown for their scale; they are not data centers or US sites.

Fabrication capacity

Shells for a whole campus, from one plant

2,500 metric tons a month

About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.

Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.

Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →

The in-depth solution

Data center steel structures, guide by guide

Data halls, heavy roof and MEP loads, equipment yards, pipe and cable racks, multi-story blocks, phased campuses, fast-track schedules, tolerance and vibration, and seismic design: how World Steel engineers and fabricates every part, with 2,500 t (about 2,750 US tons) of capacity a month.

In-depth articles

Inside the data center, rack by rack

Forty in-depth articles on planning, rating, laying out, cooling, powering, protecting and building a US data center, each read from the structural side: what the frame has to carry, where it sits on the schedule, and how World Steel designs and fabricates the steel for it in Vietnam.

Built on Hwaiyu Geng (ed.), Data Center Handbook, 2nd edition (Wiley, 2021), paraphrased and cited by chapter, with US codes and standards.

Rack AStrategy and planning

Sustainability, energy, data center types, edge sites and the cost picture.

Rack BRisk and resilience

Risk thinking, site search, Risk Category IV, performance-based seismic design and reuse of existing buildings.

Rack CNatural hazards

Wind, roof snow and rain, flood, lessons from Sandy and Tohoku, and post-event inspection.

Rack DStandards and ratings

TIA-942, Tier redundancy, ASHRAE thermal guidance, BICSI 002 and NFPA 75.

Rack EThe white space

Floor loads, ceiling height, column grid, raised floor and the overhead support steel.

Rack FCooling and air

Containment, economizers, liquid cooling, roof plant and the air the steel breathes.

Rack GPower and electrical

Generator yards, UPS and battery rooms, microgrids, grounding and electrical galleries.

Rack HBuild and operate

Project management, modular delivery, fire ratings, reliability and future growth.

Real World Steel frames

Long frame lines, made in our plant

Frames by World Steel standing before the roof goes on, and the members behind them in our shop. Tap a photo to open it full size.

Long run of steel frames and purlins before the roof sheeting Photo Frame line before the roof
Steel roof frame and columns during construction, seen from below Photo Rafters from below
Steel columns and roof frame standing over a bare site Photo Columns on a bare site
Grey painted built-up steel members laid out in the World Steel shop Photo Members in the shop
Inspector checking long steel members on the shop floor Photo Checked before release

Projects outside the US, shown for the structure type; they are not US sites.

Buying steel from outside the US

Every worry about an overseas fabricator, answered in writing

US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.

The worry: “Will steel designed overseas pass US plan check?”

Designed to US codes, ready for your engineer’s review

We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.

The worry: “I can’t see the quality from across the Pacific.”

An accredited plant you can inspect, live

Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.

The worry: “Will the materials be traceable to the grade on the drawings?”

Mill certificates by heat number

Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.

The worry: “What if pieces don’t fit when they reach the site?”

Modeled, approved, then measured

Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.

The worry: “How will I know where my order really is?”

Real-time tracking in PEB Studio

You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.

The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”

Packed in erection order, listed per container

Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.

The worry: “Who handles customs and duties?”

Incoterm and importer of record in writing

Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.

The worry: “Time zones and language will slow everything down.”

One English-speaking project manager

Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.

The worry: “Who erects it, and who stands behind the field work?”

Your US contractor erects, with our drawings

World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.

The worry: “Who is responsible for the design?”

Scope split agreed before you sign

We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.

  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

What the package contains

Components in this package

In a data center shell the steel carries more than the roof. Cooling units sit on rooftop dunnage, cable tray and busway hang from the frame, and every penetration has to stay weathertight. We model those supports with the structure in Tekla, so brackets and platforms arrive cut and drilled, and we hand your MEP designers a frame they can route around before anything is fabricated.

standard = in the base scope · optional = add if you want it · confirm = depends on your design

Primary Structural System

Secondary Framing

Roofing System

Wall & Cladding System

Insulation & Building Performance

Connections & Anchorage

Drainage & Weather Protection

Ventilation & Building Services Support

Crane Runway & Industrial Supports

Optional Add-Ons (Made in Vietnam)

Not included

  • Foundations, slabs-on-grade, anchor rod setting and other sitework.
  • Steel erection and field labor, provided by your erector or general contractor.
  • Permit applications and plan review fees, unless agreed in writing.
  • Mechanical, electrical and plumbing design and installation.
  • US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.
  • Raised floors, cooling, power and fire suppression systems are designed and supplied by their own specialists.

Talk to an engineer

Send the layout and the equipment schedule.

Our engineers work in English. We model the frame, the roof dunnage and the MEP support steel together and send a written scope for the steel.

Asked by data center contractors

Data center shell questions and answers

12 answers on the shell, roof loads, campuses and scope.

Shell, roof loads and MEP 3 answers

What does the shell package include?

The primary frame, roof and wall steel, roof dunnage for cooling equipment, hung-load supports for ductwork, busway and cable tray, and where needed mezzanines and multi-story framing. Cladding and insulated panels can be added. The in-depth guides on our data center pages explain each part.

Can the roof carry heavy cooling equipment?

Yes. Equipment weights and positions from the mechanical engineer go into the frame design, and roof dunnage is detailed so units sit on steel aligned with the frames below.

Do you supply the busway, cable tray or cooling units?

No. MEP equipment and its installation belong to the MEP contractors. We supply the steel that carries it, coordinated in one Tekla model so supports land where the services run.

Campuses, phases and schedule 2 answers

Can World Steel supply a multi-building campus?

Yes. Our plant fabricates 2,500 t (5.5 million lb) of structural steel a month, several projects move through the shop in parallel, and campus buildings are packed and shipped building by building or phase by phase with production slots confirmed in the quote. For scale, World Steel supplied more than 56,000 m² (600,000 sq ft) of steel structures at the Long Son petrochemical complex in Vietnam.

How do phased data center campuses work with you?

The first phase sets the frame, connection and support details; later phases reuse the model, so a phase two order starts from drawings already approved.

Design, tolerance and codes 2 answers

Which codes do you design to?

IBC 2024 and ASCE 7-22 by default, or your jurisdiction’s edition, with AISC 360, AISC 341 where seismic design calls for it, and the owner’s own specifications for deflection, vibration and tolerance.

Who approves and seals the drawings?

Your Engineer of Record reviews and approves the calculations and drawings we prepare. The approval, the PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.

The yard around the hall 3 answers

Do you supply equipment screen walls?

Yes. Screen walls around generator yards, transformer yards and rooftop equipment are framed in steel and designed for wind, with girts for the screen panels or louvers your design team chooses.

Can you build pipe and cable bridges between buildings?

Yes. Pipe racks and cable bridges between the data halls, the central plant and the power yard are designed and fabricated with the campus steel, with access walkways where maintenance needs them.

Can chillers sit on a steel gantry instead of the roof?

Yes. Ground-level gantries or elevated platforms for chillers and dry coolers keep heavy, vibrating equipment off the hall roof. We design them for the operating weights and the wind; vibration isolation comes from the equipment supplier.

Buying, shipping and erection 2 answers

Do you erect the shell?

No. World Steel designs, fabricates and supplies the steel. Foundations, erection, MEP installation and site work are the scope of the US contractor, our customer, and the trades they hire.

Do you publish prices?

No. Send the bid documents or the layout, the equipment schedule and the site address and we return a written scope and quotation.

Keep reading

Related pages

Bidding a data center shell?

Send the bid documents, the equipment schedule and the site address. We model the frame and every support layer together and send a written scope for the steel, made in our plant in Vietnam.