Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Steel for Washington snow, from the passes to Spokane

Snow in Washington changes within a short drive. Puget Sound sees little; the Cascade passes carry some of the heaviest ground snow loads in the country; Spokane and the Columbia Basin have cold winters with snow that stays. Roof steps, parapets and rooftop equipment collect drifts, and rain on snow adds weight in the west.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Washington port.

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington project is cut, welded, inspected and packed.

Q&A

What Washington buyers ask

What ground snow load do you use?

The one your jurisdiction and Engineer of Record confirm for your site: from ASCE 7 data or the local published value, whichever governs. We publish no value per city.

Can you design for drift at a new addition next to an existing building?

Yes. Drift on the lower roof of an addition is common and often governs. We need the heights and roof shapes of both buildings.

Is rain-on-snow required in Washington?

Where the code requires it, typically on low-slope roofs in milder, wetter areas. Your Engineer of Record confirms.

Washington solutions

Every Washington guide

Related pages

Code facts on this page summarize Washington rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Washington?

Send the drawings or the site address, size and use. We set the Washington design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.