Caribbean guide · Salt air

Salt-air corrosivity in the Caribbean: C5 and CX coating systems

Trade winds blow salt off the sea all year, warm humid air keeps it wet and the sun bakes it in. On the shore that makes the air C5, very high corrosivity, and in the spray of the surf it reaches CX, the extreme end of ISO 12944. We start every coastal package by naming the category for each part of the steel, then pick a system that lasts as long as the owner needs.

CXSurf and spray zone
C5Shore
C4Near coast
C3Inland
Sea on the left, inland on the right. Typical exposed coast, not a site survey.

Distance from the sea

From the surf line inland

Corrosivity falls with distance from breaking waves, but not on a fixed scale: wind direction, height, shelter and rain washing all change it. These bands are a typical picture for an exposed Caribbean coast. A site survey or coupon test settles it.

CX

Surf and spray zone

Seafront walls, piers, jetties, marine terminals

C5

Shore

Beachfront resorts, port warehouses, coastal plants

C4

Near coast

Coastal towns and estates a little inland

C3

Inland

Sheltered inland sites and the inside of closed buildings

ISO 12944-2

What the air does to bare metal in the first year

ISO 12944-2 defines each category by the steel and zinc a standard sample loses in its first year of exposure.

CategoryCorrosivityCarbon steel lossZinc loss
C3Medium200–400 g/m² · 25–50 µm0.7–2.1 µm
C4High400–650 g/m² · 50–80 µm2.1–4.2 µm
C5Very high650–1,500 g/m² · 80–200 µm4.2–8.4 µm
CXExtreme1,500–5,500 g/m² · 200–700 µm8.4–25 µm

Durability: years to first major maintenance (ISO 12944-1)

LLow · up to 7 years
MMedium · 7 to 15 years
HHigh · 15 to 25 years
VHVery high · more than 25 years

Go deeper: one coating guide per category

Our ISO 12944 paint system ladder takes each category from C1 to CX in turn: the environment, loss rates, example systems, preparation grades and inspection.

Coating systems

Three systems for Caribbean salt air

Each stack is drawn to its film thickness, primer at the bottom on the blasted steel.

C5 · High durability

For shore buildings where the owner plans first maintenance in 15 to 25 years.

  • Zinc-rich epoxy primer60 µm
  • High-build epoxy160 µm
  • Polyurethane finish60 µm

About 280 µm in three coats

C5 · Very high durability

For resorts, hospitals and port buildings meant to go past 25 years before first major maintenance.

  • Zinc-rich epoxy primer60 µm
  • Epoxy intermediate100 µm
  • Epoxy intermediate100 µm
  • Polyurethane finish60 µm

About 320 µm in four coats

CX · Spray zone

For steel in the surf spray. ISO 12944-9 systems are prequalified by cyclic ageing tests of 4,200 hours.

  • Zinc-rich epoxy primer60 µm
  • Glass-flake or high-build epoxy200 µm
  • Polyurethane or polysiloxane finish60 µm

Usually 320 µm and up, or galvanizing plus paint

Typical builds for illustration. The exact products, coats and film thickness come from the specification and the coating maker's data sheet. Galvanizing plus paint is compared in the galvanizing and duplex guide.

Coating systems from

JotunPPGCarbolineHempelNippon PaintInternational Paint

We apply coating systems from six international makers whose products are sold across the Caribbean, so touch-up and maintenance paint is the same product your steel left our plant in, and the maker's warranty terms can apply.

Four checks in our paint hall

Surface checked before blasting

Weld spatter removed, edges ground and the surface checked free of oil and salt.

Blasted to Sa 2½

Abrasive blasting to ISO 8501-1 Sa 2½ with the profile the data sheet asks for.

Climate logged

Steel temperature, dew point and humidity recorded before every coat.

Film thickness on every member

Dry film readings taken coat by coat and stored with the member in PEB Studio.

More on how we check coatings: coating quality.

Our paint hall

Blasted and coated before the steel leaves Vietnam

Real World Steel photos of the blasting line and paint hall. None is shown as a Caribbean site.

Crew loading steel parts onto the shot-blasting conveyor
Roller conveyor carrying members into a shot-blasting machine
Primed column with its bolted end plate set on painting stands
Members in gray finish paint laid out in the paint hall

Caribbean hurricane and marine guides

The rest of the storm and salt-air story

The code, port and parishes of each island are on its own page:

Questions

Questions on salt-air coatings

What is C5 corrosivity?

C5 is the very high category of ISO 12944-2: a standard carbon steel sample loses 80 to 200 µm in its first year. Most exposed Caribbean shorelines are C5, and steel within the surf spray is often CX.

What is the difference between C5 and CX?

CX is the extreme category, with first-year steel losses of 200 to 700 µm, found in the spray zone and offshore. CX systems are prequalified to ISO 12944-9 and are usually thicker or combined with galvanizing.

How long will the coating last?

ISO 12944 durability is the time to first major maintenance: L up to 7 years, M 7 to 15, H 15 to 25 and VH more than 25. It is a planning figure, not a guarantee, and depends on correct application and care.

Which paint brands do you use?

We apply coating systems from Jotun, PPG, Carboline, Hempel, Nippon Paint and International Paint. The specification names the system; we follow the maker's data sheet.

Does the inside of a building need the same coating?

Usually not. Steel inside a closed building near the sea may be C3 or C4, while exposed canopies, eaves and outdoor frames are C5. We set the system for each part, which keeps the cost of coating in check.

Do you test for salt on the steel before painting?

Yes. The steel is checked before blasting and coating in our plant, and the specification can set a soluble salt limit that we measure and record.