Follow a car through the dealership
Six stops, one steel frame
Each stop puts its own demand on the structure. Here is what World Steel designs and fabricates at every one of them.
-

Arrival
The street face and entry canopy
A tall portal and fascia for the brand, sign supports and an entry canopy tied into the main frame for wind uplift.
Steel canopies -

Showroom
An open, glass-fronted showroom
Long spans for an open display floor, wind columns and headers sized for big glass, and framing for a display mezzanine.
Architectural steel features -

Sales and offices
Offices and lounge on a second level
A steel floor over the write-up area or along the showroom, with stairs fabricated with the frame.
Stairs -

Service drive
A covered write-up lane
Wide door openings framed on their own, a drive-through lane with no columns in the way and support steel for the doors.
Industrial overhead doors -

Repair bays
Column-free bays for lifts
Clear spans over the lift rows, support steel for exhaust reels, lube lines and lights, and a hoist or monorail where you want one.
Mechanical equipment support steel -

Parts and storage
Parts room with a storage mezzanine
A mezzanine over the parts counter doubles storage without adding footprint, framed and decked in the same model.
Steel mezzanine frames
Photos are World Steel projects outside the US, shown for the structure type.
Fabrication capacity
A dealer group’s whole rollout from one plant
2,500 metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →- 20,000 m² plant site (215,000 sq ft) in Tay Ninh Province, Vietnam
- 300+ people in engineering, production and quality control
- In parallel several projects move through the shop side by side
- Your slot production slot and ship date confirmed in your quote
- AC472 IAS-accredited design and fabrication, first and only in Vietnam
- 14 countries we have shipped structural steel to
Showrooms that stack
Multi-level frames, built in our plant
Showrooms with display floors above, offices over the service drive, parts storage on a mezzanine: World Steel frames that go up as well as out. Tap a photo to open it full size.
Photo
Hai Trung showroom, Vietnam
Photo
From the air
Photo
Moment frame corner
Photo
Honda warehouse, Philippines
Photo
Floors and roof The dealership ecosystem
Design, make, ship, build: every link on one route
How a World Steel dealership comes together, and where your US contractor takes over.
For dealer groups and brand programs
One design kit, many rooftops
A dealer group opening or re-imaging several stores should not pay for the same design each time. We set the details up once, adapt each store to its site and book the stores into the plant one after another.
Illustration. Each store is checked for the loads at its own address.
One design kit
Frame details, connections, portal and canopy set up once for the group.
Adapted per site
Each store re-checked for its own wind, snow and seismic loads.
Same standards
Shop drawings, coatings and labeling follow one standard across stores.
Production slots
Stores booked into our 2,500 t a month plant one after another.
Showrooms and long spans World Steel has built
Projects behind this package
Photo
Hai Trung Furniture Showroom and Model House Center
A multi-level showroom and model house center: open display floors, a steel stair tower and a long front for glazing. World Steel designed, fabricated and supplied the steel structure.
Open the project
Photo
Photo
Photo
Projects outside the US are shown for the structure type; they are not US sites.
Clear scope on a dealership job
Who does what
World Steel supplies
- Frame design and calculations for your Engineer of Record
- Steel for the portal, fascia, canopies and mezzanines drawn by your architect
- Shop drawings at no extra charge
- Fabrication in our plant in Vietnam, tracked in PEB Studio
- Packing in erection order and shipping to a US port
Your US contractor (our customer) handles
- Drawing approval and PE seal with the Engineer of Record
- Permit, foundations, slabs and lift pits
- Steel erection and all site work
- Glazing, brand finishes, lifts and MEP
Buying steel from outside the US
Every worry about an overseas fabricator, answered in writing
US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.
- Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
- An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
- Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
- Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
- Real-time tracking in PEB Studio“How will I know where my order really is?”
- Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
- Incoterm and importer of record in writing“Who handles customs and duties?”
- One English-speaking project manager“Time zones and language will slow everything down.”
- Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
- Scope split agreed before you sign“Who is responsible for the design?”
- First and only IAS AC472 plant in Vietnam
- Designed to US codes
- Shop drawings at no extra charge
- Live production in PEB Studio
- Supplied to US contractors
What the package contains
Components in this package
A dealership has two jobs under one roof: sell in the showroom and turn bays in the service drive. We frame the showroom for its glass, canopy and signage, keep the service lanes free of columns for lifts, and plan the support steel for exhaust, lighting and doors with the frame. Your architect finishes the street face; the steel behind it arrives detailed and piece-marked.
standard = in the base scope · optional = add if you want it · confirm = depends on your design
Primary Structural System
- Pre-Engineered Metal Buildingsstandard
- Rigid Frame Systemsstandard
- Built-Up Steel Columnsstandard
- Built-Up Steel Raftersstandard
Secondary Framing
- Z Purlinsstandard
- Wall Girtsstandard
- Eave Strutsstandard
- Roof Bracingstandard
- Wall Bracingstandard
Roofing System
- Metal Roof Panelsstandard
- Ridge Capsstandard
- Roof Flashingsstandard
Wall & Cladding System
- Metal Wall Claddingstandard
- Insulated Metal Panelsstandard
- Wall Flashingsstandard
Doors & Building Openings
- Industrial Overhead Doorsconfirm
Mezzanines & Floor Systems
- Steel Mezzanine Framesoptional
Connections & Anchorage
- Anchor Boltsstandard
- Base Platesstandard
- Connection Platesstandard
Drainage & Weather Protection
- Guttersstandard
- Downspoutsstandard
- Entrance Coversoptional
Ventilation & Building Services Support
- Lighting Support Structuresoptional
Special Building Accessories
- Steel Canopiesoptional
- Architectural Steel Featuresoptional
Not included
- Foundations, slabs-on-grade, anchor rod setting and other sitework.
- Steel erection and field labor, provided by your erector or general contractor.
- Permit applications and plan review fees, unless agreed in writing.
- Mechanical, electrical and plumbing design and installation.
- US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.
Talk to an engineer
Send the site plan and the brand drawings.
Our engineers work in English. Tell us the showroom size, the bay count and the brand requirements, and we come back with a frame concept and a written scope.
Covered in our state guides
Asked by dealers, developers and contractors
Dealership steel questions and answers
15 answers on showrooms, service bays, codes, shipping and what World Steel does and does not do.
Showrooms and brand image programs 3 answers
Can a steel frame meet an automaker’s brand image program?
Yes. The image program is set by the automaker and drawn by the dealer’s architect: portal, fascia, glazing, colors and signage. We supply the steel that carries it, including tall portal frames, fascia framing, sign supports and canopy steel, detailed to the architect’s drawings. World Steel does not hold or claim any automaker approval.
How tall can the showroom glass be?
As tall as your architect draws it. Wind columns, girts and headers are sized for the glazing supplier’s deflection limits, so the curtain wall or storefront system can be specified first and the steel designed around it.
Can cars be displayed on a mezzanine or upper floor?
Yes, with the floor designed for vehicle loads and a ramp or vehicle lift chosen by your architect. The mezzanine framing, deck support and guardrail posts are part of the steel package.
Service drive and repair bays 3 answers
Can the service bays be free of interior columns?
Yes. Clear spans keep the lift rows, the drive aisle and the write-up lane open. If a column line saves a lot of steel, we show you both options with their steel weight during design optimization.
Do you design for vehicle lifts, exhaust and cranes?
Lifts sit on the slab, which is your contractor’s scope, but we keep columns clear of lift positions and design support steel for exhaust reels, lube lines, lighting and any hoist or monorail you want.
What about a car wash or detail bay?
Wet bays get a coating system chosen for constant moisture and cleaning chemicals, and the framing is detailed so water does not sit on the steel.
Design and codes 3 answers
Which codes do you design dealerships to?
IBC 2024 and ASCE 7-22 by default, or the edition your jurisdiction uses, AISC 360 for members and connections, and AWS D1.1 and D1.3 for welding. Repair garages bring their own fire and ventilation rules, which your architect and MEP engineer set and we coordinate with.
Who approves and seals the drawings?
Your side does. World Steel prepares calculations and drawings for your Engineer of Record to review and approve. The approval, the PE seal and the permit belong to the US contractor, our customer, and their engineer.
Can the showroom and the service building be separate?
Yes. We can frame them as one building with an expansion joint or as two buildings with a covered drive between them, whichever your site plan and architect prefer.
Dealer groups and brand programs 3 answers
Can one design be reused across several stores?
Yes. For a dealer group we set up one design kit: frame details, connection standards, the portal and the canopy. Each new store is then adapted to its site, wind and snow instead of starting again, and the shop drawings follow the same standards.
What happens when the brand updates its image program?
The portal, fascia and canopy are framed so they can change without touching the main frame. When a brand updates its facade, we design the new support steel against the existing frame.
How do you keep a tall glass front from cracking?
Glass needs a stiff frame. Wind columns, headers and the roof edge above the glass are designed to the deflection limits the glazing supplier sets, and those limits are shown on our drawings for your Engineer of Record.
Buying, shipping and erection 3 answers
Do you build the dealership?
No. World Steel designs, fabricates and supplies the steel structure, and the roof and wall panels if you want them. Erection, foundations, slabs and finishes are the scope of the US contractor, our customer.
How do we follow production from the US?
In PEB Studio, where each member shows its status from cutting to loading, with QC photos, in real time.
Do you publish prices?
No. Send the site plan, the brand requirements and the bay count and we return a written scope and quotation.
Keep reading
Related pages
Planning a showroom or service building?
Send the site plan, the brand requirements and the number of service bays. We design one steel frame for the whole dealership, made in our plant in Vietnam.
