Resorts and condominiums
Grace Bay, Long Bay, Turtle Cove, Leeward
Resort blocks, condominium towers, villas, restaurant roofs and back-of-house buildings.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Six districts on two island groups
The Turks and Caicos Islands have six districts: Providenciales with Grace Bay and the airport, North, Middle and South Caicos across the Caicos Bank, and Grand Turk with the capital Cockburn Town and little Salt Cay in the Turks Islands. Each page covers the main settlement, the ground, the hurricane and surge conditions, the route from the port and the steel we recommend for what gets built there.
ProvidencialesThe Caicos IslandsThe Turks Islands
Providenciales and West Caicos: Grace Bay, the resorts, the airport, South Dock and most of the population.
North Caicos, Middle Caicos and South Caicos with East Caicos: farms, caves, fishing and quiet settlements.
Grand Turk with the capital Cockburn Town, and Salt Cay, the old salt island.
National symbols of the Turks and Caicos Islands
The navy of the flag and the gold shield with the queen conch, the spiny lobster and the Turk’s head cactus, and the salt that made the Turks Islands rich. Four symbols, and what each one means for the steel we make for buildings on the islands.
The conch on the shield is the islands’ best-known catch and their emblem. Built strong for the sea, like every frame we design for a low coast.
The lobster beside the conch stands for the fisheries that feed the islands. Steel near the docks gets coatings made for salt and spray.
The cactus with its red cap gave the Turks Islands their name. It survives sun, salt and storms, which is the brief for every building we supply.
Salt Cay and Grand Turk once raked salt from the sea for half the Atlantic. Salt is still the enemy of steel here, and the reason for every coating we choose.
Project types
The four project types behind most steel orders on the islands, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Grace Bay, Long Bay, Turtle Cove, Leeward
Resort blocks, condominium towers, villas, restaurant roofs and back-of-house buildings.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Providenciales, Grand Turk, the Caicos Islands
Classrooms, clinics, offices and halls designed to serve as hurricane shelters where required.
Going up beside the plant in Vietnam: World Steel framed its own office building.
South Dock, Five Cays, the airport
Clear-span warehouses, distribution buildings, depots and utility buildings.
Completed, clad building by World Steel in Quang Ngai Province, Vietnam.
Providenciales, Grand Turk, North and South Caicos
Terminal, hangar and cargo frames, and transport buildings.
Clear-span interior on a World Steel job in southern Vietnam.
Turks and Caicos guides
Planning and building permits, hurricanes and surge from Ike to Irma, sand and limestone ground, salt air, South Dock and the island legs, and the resort and public work that drives the market, one guide each.
Why World Steel
2,500 metric tons of structural steel a month from our own plant, released building by building.
Large-project program →Frames, cladding and anchors designed for the wind, with floor levels set above surge.
Hurricane guide →Calculations that state the code basis for your engineer and building control.
Building code guide →Paint systems and galvanizing chosen for beachfront and low, salt-laden islands.
Coatings guide →Packed in erection order and shipped to South Dock, with onward legs to the other islands.
Port delivery guide →Buy it all in one place · Turks and Caicos
Resorts on Providenciales, island warehouses, airport buildings and public works. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Providenciales, with every piece tracked live in PEB Studio.
All solutions and products for Turks and Caicos→Picked for Turks and Caicos
Hurricane, salt air and earthquake guides
Also from the same plant
One desk, every step
No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.
Seeking Turks and Caicos Islander contractor partners
Resorts and condominiums on Grace Bay and the Providenciales coast, villas, the airport, schools, clinics, government buildings in Grand Turk and warehouses near South Dock are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Providenciales and back your bid with drawings and live tracking.
Hurricanes, salt air, earthquakes
A broad hazard picture for Turks and Caicos and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.
Real World Steel photos
Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in the Turks and Caicos Islands.
Questions from Turks and Caicos Islander buyers
Planning goes through the Department of Planning, and building permits through the building control office. The Turks and Caicos building code draws on the International Codes. We state the code basis your engineer of record sets on the first calculation sheet.
Yes. Ike and Hanna in 2008 and Irma and Maria in 2017 all did heavy damage. On low islands surge and wind come together. We design the whole load path for the wind speed your engineer sets.
The islands sit on the stable Bahamas platform, north of the more active Hispaniola faults. Your engineer sets the seismic values for each site, and we design the frames to them.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
South Dock on Providenciales takes most cargo. Grand Turk has its own cargo dock, and the other islands are served onward by sea.
No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.
Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for the Turks and Caicos Islands and the US standards it references. We hold no approval, licence or registration in the Turks and Caicos Islands and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.
Contact World Steel · Turks and Caicos
WhatsApp, email or a video call with our engineers, booked at an hour that suits Cockburn Town. Our contact page for Turks and Caicos has the ports, the local time and the form.