Two lanes at once
What runs in parallel
In the US: your contractor
Site preparation, utilities, foundations and anchor rod setting, using the anchor rod plan we issue first.
In Vietnam: World Steel
Design for your EOR’s approval, Tekla detailing, plate cutting, welding, blasting, coating and QC release, area by area.
On the ocean
Early areas sail while later areas are still on the shop floor, so steel arrives in the order it will be erected.
How we shorten the path
Four habits that keep steel off the critical path
-
Anchor rods first
The anchor rod and base plate package is issued ahead of the frame so foundations are not waiting.
-
Release by area
Approved areas go to fabrication without waiting for the whole building.
-
Plate from Vietnamese mills
Plate and coil come from mills in Vietnam, ordered as soon as sizes are fixed.
-
Erection-sequence packing
Bundles and containers are loaded in the order your crews will need them.
See it, do not chase it
PEB Studio shows where every member is
Fast-track only works if everyone knows where the steel is. In PEB Studio your project team follows each member through cutting, welding, testing, coating and QC release in real time, with packing lists and container loads attached. No weekly status chase, no guessing which area ships next.
We do not publish schedules or durations on this site, because they depend on tonnage, approvals and shipping for each project. We give you a written schedule with your scope and keep it visible in PEB Studio.