Chip and advanced plants
Boise and Nampa
Long-span halls, stiff floors and heavy utility steel.
Boss Pharmacere factory, Thailand: plant steel by World Steel
Six gems on the map
From the fabs of Boise and the warehouses of Canyon County to the dairies of the Magic Valley and the potato country of eastern Idaho, Idaho’s large projects gather in six places. Each has its own buildings and its own weather.
Chip and advanced plants, offices and public work.
Warehouses, food plants and distribution.
Dairies, cheese and food plants.
Potato storage, labs and energy research.
Manufacturing, snow and timber.
Very high snow and seismic sites.
Boise, Nampa and Caldwell growth.
Dairy, cheese and food plants.
Potatoes, labs and the Snake River.
Coeur d’Alene snow and plants.
Faults and heavy snow.
Grain, timber and river ports.
Idaho guides
One guide per Idaho condition: the Idaho code, fault zones, mountain snow, the Northwest port route, and the potato, dairy, warehouse and chip projects that drive the market.
Ready for Idaho
2,500 metric tons of structural steel a month from our own plant, released area by area.
Large-project program →Calculations that state the Idaho Building Code edition, the reviewing office and the loads.
Idaho building code guide →Steel designed or detailed to AISC 341 where the Seismic Design Category calls for it.
Fault zones and seismic guide →AWS D1.8-qualified welding procedures and welders, with protected zones marked on request.
Demand-critical welds →The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.
IAS AC472 accreditation →Tekla shop and erection drawings for every Idaho project at no extra cost, ready for approval.
Shop drawings, included →Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.
PEB Studio tracking →Steel packed in erection order through Seattle, Tacoma or Portland and on to Idaho.
Northwest ports and I-84 guide →Solution advisor
Structural steel for the project types Idaho builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Boise and Nampa
Long-span halls, stiff floors and heavy utility steel.
Boss Pharmacere factory, Thailand: plant steel by World Steel
Idaho Falls, Rupert, Burley
Storage halls with wall framing for pile loads and processing plants.
CPV Food processing plant, Vietnam: 2,500 t of World Steel structural steel
Twin Falls, Jerome and Gooding
Cheese plants and freezer warehouses with thermal breaks.
New Era cold storage, Vietnam: 1,000 t of World Steel structural steel
Nampa, Caldwell and Boise
Clear-span frames and dock walls on I-84.
M&D warehouse, Thailand: 2,000 t of World Steel structural steel
Coeur d’Alene and Pocatello
Production halls, crane bays and platforms.
Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel
The Snake River Plain
Machine sheds, feed and commodity buildings.
Haid Vinh Long feed plant, Vietnam: feed mill steel by World Steel
Idaho Falls and eastern Idaho
Process buildings and equipment steel to owner specifications.
GPPD Energy factory, Vietnam: plant steel by World Steel
Boise and Meridian
Composite floor framing and braced frames.
College of Medicine, Philippines: multi-story steel frame by World Steel
The Idaho ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large Idaho structures, beyond metal buildings.
Complete buildings engineered for Idaho sites.
Members and parts made in our Vietnam plant.
The design basis your building official checks.
How you buy and follow your steel.
From the plant in Vietnam to your Idaho site.
Open call · Idaho contractors
Chip and advanced plants in Boise, warehouses in Nampa and Caldwell, potato storage and processing plants on the Snake River Plain and dairy and cheese plants around Twin Falls and Jerome are large steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, deliver it in erection order and back your bids with drawings and live tracking.
Buying steel from outside the US
The questions Idaho owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant front, plate store, saw station, girders, weld checks, blasting, primed columns and packed stacks. None is shown as an Idaho site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from Idaho buyers
The Idaho Building Code, which adopts the IBC statewide with state amendments through the Division of Occupational and Professional Licenses. Many cities and counties enforce it themselves; elsewhere the state does. We confirm the edition and reviewing office with your Engineer of Record.
Yes, in many places. Eastern and central Idaho have active faults, and the 1983 Borah Peak and 2020 Stanley earthquakes were felt across the state. Your Engineer of Record sets the site class and Seismic Design Category, and we design and detail the steel to AISC 341 where it applies.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match the erection sequence.
Our steel usually lands at Seattle, Tacoma or Portland and travels by truck or rail on I-84 and I-86 to the Treasure Valley and the Snake River Plain. Members are packed in erection order.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, seismic, snow and delivery questions for your site.
Honest status. World Steel designs and fabricates to the Idaho Building Code and ASCE 7. We hold no state or local approval and no Idaho engineering license, and we do not submit plans for approval or apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, size and use. We set the Idaho design basis with your Engineer of Record, design or detail the steel to the Idaho Building Code, its fault zones and mountain snow, prepare it for plan review, and quote it made in our plant in Vietnam, packed in erection order and delivered through Seattle, Tacoma or Portland to your site.