If any part of your metal building is heated or cooled, expect the plan reviewer to check its envelope against the IECC or ASHRAE 90.1. A shop in Houston and a shop in Duluth face very different U-factor targets. We size the frame and the envelope together, so purlin depth, insulation, thermal blocks, air sealing and vapor control are settled before a single panel is ordered.

Finished warehouse in white wall panels with sectional doors along one side

IECC climate zones, hot to cold, one example city each

  1. 1 Miami Very hot, humid
  2. 2 Houston Hot
  3. 3 Atlanta Warm
  4. 4 Baltimore Mixed
  5. 5 Chicago Cool
  6. 6 Minneapolis Cold
  7. 7 Duluth Very cold
  8. 8 Fairbanks Subarctic

Compliance paths

The locally adopted IECC, or ASHRAE 90.1 as the alternative

Climate zones

IECC zones 0 through 8, assigned county by county

Assemblies

Metal building roofs and walls with thermal blocks or liner systems

What we supply

Assembly data your designer enters in COMcheck or an energy model

The layers

Six parts of a code-compliant metal building envelope

Shown on one eave detail: the roof assembly above, the wall assembly below, and where heat and air try to escape.

cool roof panel roof insulation (yellow band) thermal block on each purlin wall insulation between girts vapor retarder, warm side steel column air seal at the eave (circle)
Diagram, not to scale. Your assemblies come from the climate zone and the code path your designer picks.
  • Roof insulation

    Faced blanket over the purlins, a filled-cavity system or a liner system, picked to reach your zone's roof U-factor.

  • Thermal spacer blocks

    Rigid blocks between purlin and panel restore some of the insulation lost where it is crushed over the steel.

  • Wall insulation

    Blanket between girts, insulated metal panels or continuous insulation, depending on the target and the finish you want.

  • Air barrier

    Sealed laps, closures, trims and penetrations keep conditioned air inside and help meet the code's air leakage rules.

  • Vapor control

    A facing or retarder on the warm side keeps moisture from condensing on cold steel, which matters most up north and in cold storage.

  • Cool roofs

    Light, reflective roof colors where hot-climate zones call for them, coordinated with the panel paint system.

South versus north

How the envelope priorities flip with climate

Hot zones

Cold zones

Insulation level

Moderate, with the roof doing most of the work

High in both roof and walls; liners or continuous insulation common

Thermal bridging

Thermal blocks still pay off

Blocks and continuous layers are often the only way to reach the U-factor

Roof reflectance

Cool roof frequently required

Rarely required

Vapor control

Keep humid outdoor air out of a cooled interior

Warm-side retarder to prevent winter condensation

Air sealing

Sealed laps and closures stop humid air leaks

Sealed laps, trims and doors limit heat loss and frost

From our drawings

Data your energy designer can pull straight from the set

  • Each roof and wall assembly with insulation type and thickness
  • Panel profile, gauge, coating and roof color
  • Thermal block or liner details where they are in our supply
  • Air-barrier details at trims, closures and laps
  • Door and framed-opening details with their reactions
  • Gutter and downspout locations and sizes
New Era cold storage, structural steel by World Steel Large conditioned building 1,000 t New Era cold storage Tay Ninh Province, Vietnam · Cold storage, phase 1 tonnage

Cold storage puts the most demand on vapor control and air sealing. It is one of the large jobs from a plant that fabricates 2,500 metric tons of structural steel a month; see the large-project program.

Inside a big warehouse: steel columns carrying rafters and the roof
Insulated sectional door seen from inside a steel building
Finished steel building in blue wall panels with a walk-in door
Finished feed mill with long blue metal roofs, seen from the air

Asked by US project teams

Energy code questions

10 answers from our engineers, grouped by topic.

Does the code apply to us 3 answers

Does an unheated warehouse have to meet the energy code?

Often only in part. Many envelope rules apply to conditioned space, and ASHRAE 90.1 treats semiheated space separately. Your designer decides how the building is classified under the code your jurisdiction enforces.

How do I find my climate zone?

IECC assigns a zone to every US county, with a moisture letter (A, B or C) in most zones. Your designer reads it from the code your jurisdiction adopted; we design the assemblies to the zone they confirm.

IECC or ASHRAE 90.1: which path should we use?

Most adopted energy codes let commercial buildings comply through either the IECC provisions or ASHRAE 90.1. Your design professional picks the path, often by which one suits the building and the software they use.

Roof and wall assemblies 4 answers

Why do metal roofs need thermal blocks?

Where blanket insulation is squeezed over a purlin it loses most of its value, and the steel carries heat straight through. A spacer block restores some separation, and that can be what gets the assembly to the required U-factor.

Does insulation change the steel design?

It can. Thicker insulation or a liner system may need deeper purlins and girts, longer screws and different clip details, and a heavy roof assembly adds dead load. That is why we size the frame and the envelope together.

Where is condensation most likely in a metal building?

On cold steel in a warm, moist space: northern buildings in winter, cold storage rooms all year and humid interiors such as wash bays. A continuous vapor retarder on the warm side and sealed laps are the main defenses.

Can you supply insulated metal panels?

Yes, for walls and roofs where your target or finish calls for them, sourced to the project and detailed in the same Tekla model as the frame.

Data and delivery 3 answers

What do you give our energy designer?

A list of every roof and wall assembly with insulation type and thickness, panel profile, color, thermal block or liner details and air-barrier details, ready to enter in COMcheck or an energy model.

Can the envelope come in the same shipment as the steel?

Yes. Roof and wall panels, trims, closures, gutters and fasteners can travel with the frame, matched to the erection drawings.

Have you supplied large cold storage buildings?

Yes. New Era cold storage in Vietnam took about 1,000 metric tons of structural steel in its first phase. Our plant fabricates 2,500 metric tons a month, so large refrigerated or conditioned buildings are routine.

Keep reading

Related engineering guides

Each one goes deeper on a part of the design this page touches.

All eight US site-condition guides, the standards we design to and the IAS AC472 program are on the engineering & standards hub.

Get an engineer’s eyes on your US building

Share drawings, a sketch or the footprint and site address. We agree the design criteria with your Engineer of Record, then send a written scope and the list of submittals, from a plant that fabricates 2,500 metric tons of structural steel a month.