IECC climate zones, hot to cold, one example city each
- 1 Miami Very hot, humid
- 2 Houston Hot
- 3 Atlanta Warm
- 4 Baltimore Mixed
- 5 Chicago Cool
- 6 Minneapolis Cold
- 7 Duluth Very cold
- 8 Fairbanks Subarctic
Compliance paths
The locally adopted IECC, or ASHRAE 90.1 as the alternative
Climate zones
IECC zones 0 through 8, assigned county by county
Assemblies
Metal building roofs and walls with thermal blocks or liner systems
What we supply
Assembly data your designer enters in COMcheck or an energy model
The layers
Six parts of a code-compliant metal building envelope
Shown on one eave detail: the roof assembly above, the wall assembly below, and where heat and air try to escape.
Roof insulation
Faced blanket over the purlins, a filled-cavity system or a liner system, picked to reach your zone's roof U-factor.
Thermal spacer blocks
Rigid blocks between purlin and panel restore some of the insulation lost where it is crushed over the steel.
Wall insulation
Blanket between girts, insulated metal panels or continuous insulation, depending on the target and the finish you want.
Air barrier
Sealed laps, closures, trims and penetrations keep conditioned air inside and help meet the code's air leakage rules.
Vapor control
A facing or retarder on the warm side keeps moisture from condensing on cold steel, which matters most up north and in cold storage.
Cool roofs
Light, reflective roof colors where hot-climate zones call for them, coordinated with the panel paint system.
South versus north
How the envelope priorities flip with climate
Hot zones
Cold zones
Insulation level
Moderate, with the roof doing most of the work
High in both roof and walls; liners or continuous insulation common
Thermal bridging
Thermal blocks still pay off
Blocks and continuous layers are often the only way to reach the U-factor
Roof reflectance
Cool roof frequently required
Rarely required
Vapor control
Keep humid outdoor air out of a cooled interior
Warm-side retarder to prevent winter condensation
Air sealing
Sealed laps and closures stop humid air leaks
Sealed laps, trims and doors limit heat loss and frost
From our drawings
Data your energy designer can pull straight from the set
- Each roof and wall assembly with insulation type and thickness
- Panel profile, gauge, coating and roof color
- Thermal block or liner details where they are in our supply
- Air-barrier details at trims, closures and laps
- Door and framed-opening details with their reactions
- Gutter and downspout locations and sizes
Photo
Photo
Large conditioned building
1,000 t
New Era cold storage
Tay Ninh Province, Vietnam · Cold storage, phase 1 tonnage
Cold storage puts the most demand on vapor control and air sealing. It is one of the large jobs from a plant that fabricates 2,500 metric tons of structural steel a month; see the large-project program.
Asked by US project teams
Energy code questions
10 answers from our engineers, grouped by topic.
Does the code apply to us 3 answers
Does an unheated warehouse have to meet the energy code?
Often only in part. Many envelope rules apply to conditioned space, and ASHRAE 90.1 treats semiheated space separately. Your designer decides how the building is classified under the code your jurisdiction enforces.
How do I find my climate zone?
IECC assigns a zone to every US county, with a moisture letter (A, B or C) in most zones. Your designer reads it from the code your jurisdiction adopted; we design the assemblies to the zone they confirm.
IECC or ASHRAE 90.1: which path should we use?
Most adopted energy codes let commercial buildings comply through either the IECC provisions or ASHRAE 90.1. Your design professional picks the path, often by which one suits the building and the software they use.
Roof and wall assemblies 4 answers
Why do metal roofs need thermal blocks?
Where blanket insulation is squeezed over a purlin it loses most of its value, and the steel carries heat straight through. A spacer block restores some separation, and that can be what gets the assembly to the required U-factor.
Does insulation change the steel design?
It can. Thicker insulation or a liner system may need deeper purlins and girts, longer screws and different clip details, and a heavy roof assembly adds dead load. That is why we size the frame and the envelope together.
Where is condensation most likely in a metal building?
On cold steel in a warm, moist space: northern buildings in winter, cold storage rooms all year and humid interiors such as wash bays. A continuous vapor retarder on the warm side and sealed laps are the main defenses.
Can you supply insulated metal panels?
Yes, for walls and roofs where your target or finish calls for them, sourced to the project and detailed in the same Tekla model as the frame.
Data and delivery 3 answers
What do you give our energy designer?
A list of every roof and wall assembly with insulation type and thickness, panel profile, color, thermal block or liner details and air-barrier details, ready to enter in COMcheck or an energy model.
Can the envelope come in the same shipment as the steel?
Yes. Roof and wall panels, trims, closures, gutters and fasteners can travel with the frame, matched to the erection drawings.
Have you supplied large cold storage buildings?
Yes. New Era cold storage in Vietnam took about 1,000 metric tons of structural steel in its first phase. Our plant fabricates 2,500 metric tons a month, so large refrigerated or conditioned buildings are routine.
Keep reading
Related engineering guides
Each one goes deeper on a part of the design this page touches.
- High-wind steel buildings
- Coastal corrosion protection
- Roofing system
- Wall cladding system
- Insulation & building performance
- Drainage & weather protection
All eight US site-condition guides, the standards we design to and the IAS AC472 program are on the engineering & standards hub.
Proof at scale
Photo
Photo
Get an engineer’s eyes on your US building
Share drawings, a sketch or the footprint and site address. We agree the design criteria with your Engineer of Record, then send a written scope and the list of submittals, from a plant that fabricates 2,500 metric tons of structural steel a month.