Illinois · Seismic
Seismic design for structural steel in southern Illinois
The New Madrid Seismic Zone, centered where Missouri, Kentucky and Tennessee meet, produced some of the largest earthquakes in US history in 1811 and 1812. The Wabash Valley zone lies along the Indiana border. Metro East and far southern Illinois sites, often on soft river soils, can fall in higher seismic design categories than the rest of the state.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Illinois site by rail through the Chicago hub.
- Sources
- New Madrid, Wabash Valley
- Most affected
- Metro East, far south
- Design basis
- ASCE 7 site class and category
- Our part
- Bracing and connections
Why it matters
One state, two seismic pictures
A warehouse near Chicago and one near East St. Louis can face very different seismic demand. River-bottom soils in the Metro East amplify shaking, which can move a site into a higher design category and change which framing systems are allowed.
Your Engineer of Record sets the site class and category from the geotechnical report. We design or detail the braced or moment frames to match, using AWS D1.8 qualified procedures and welders when the design calls for them.
What we design and fabricate
Seismic steel for southern Illinois
Braced frames
Braces and gussets detailed to the category.
Connections
Joints sized for seismic forces.
Base details
Base plates and anchors for shear and uplift.
Weld quality
AWS D1.8 procedures and records when required.
Who does what
Seismic design, split clearly
World Steel supplies
- Frames and connections detailed to the category
- AWS D1.8 qualified welders when required
- Protected-zone marking on request
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Geotechnical report and site class
- Engineer of Record approval and seal
- Special inspections on site
- Foundations and erection
- The permit
Illinois
What we do not claim
We set no seismic category ourselves. The design category and system come from your Engineer of Record and the geotechnical report.
Illinois ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Illinois contractors
Illinois contractors: let’s win the next project together
If your next bid involves Southern Illinois seismic, World Steel wants to be your long-term, win-win steel partner in Illinois. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Illinois project is cut, welded, inspected and packed.
Q&A
What Illinois buyers ask
Does all of Illinois need seismic detailing?
Every building gets a seismic check. Higher categories are most common in the Metro East and the far south.
Can you weld to AWS D1.8?
Yes. Our shop has AWS D1.8 qualified procedures and welders for seismic force-resisting systems when required.
Do river soils change the design?
Yes. Softer site classes raise seismic forces. Your engineer sets the class from the geotechnical report.
Official sources: USGS: New Madrid Seismic Zone
Illinois solutions
Every Illinois guide
Related pages
Code facts on this page summarize Illinois practice, local code adoption, the Chicago Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the code and edition in force for your permit.
Building in Illinois?
Send the drawings or the site address, size and use. We set the Illinois design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the rail trip to your site.