US codes & standards center

Every US code your steel building answers to, applied in one Vietnam plant

A US steel building is judged against a stack of documents: the code your county adopted, the loads it names, the steel specifications those loads feed, the welding, bolting and material standards on our shop floor, and the inspection rules that decide who checks the work. This center maps the whole stack.

Our default design basis, switched as a set to your adopted code

Older editions →
  1. IBC 2024Building code
  2. ASCE 7-22Design loads
  3. AISC 360-22Structural steel
  4. AISC 341-22Seismic steel
  5. AISI S100Cold-formed steel
  6. AWS D1.1 · D1.8Welding
  7. RCSCHigh-strength bolts
  8. IAS AC472Plant accreditation
Accreditation
IAS AC472, the first and only fabricator in Vietnam to hold it
Default design basis
IBC 2024 · ASCE 7-22 · AISC 360-22
Shop drawings
Included on every project at no extra charge
Proof on record
Every member traceable in PEB Studio, from mill certificate to shipping

Questions and answers on every US standard

325 answers on the codes we design to

Type a word such as Charpy, drift, slip-critical or permit, or pick a standard. Every question links straight to its answer from our engineers.

Codes & standards centerGeneral questions on this page34
State & local codesWhich building code governs your steel building? It depends on the county11 All State & local codes answers →
IBCReading the IBC as a steel building buyer15 All IBC answers →
IEBCAdding to a building that already stands? The IEBC decides what gets checked14 All IEBC answers →
ASCE 7ASCE 7-22, load by load, for a US steel building15 All ASCE 7 answers →
AISC 360AISC 360 in practice: the checks behind every frame we ship14 All AISC 360 answers →
AISC 341 SeismicAISC 341: steel that bends in an earthquake, and the proof it was built to28 All AISC 341 Seismic answers →
AISI S100AISI S100: light-gauge purlins and girts sized zone by zone14 All AISI S100 answers →
MBMAThe conventions US teams expect from a metal building, followed from the first drawing14 All MBMA answers →
AISC Design GuidesTapered frames and crane bays, checked by the methods US reviewers expect14 All AISC Design Guides answers →
AWS D1.1Every structural weld made in our Vietnam plant, every weld on record14 All AWS D1.1 answers →
AWS D1.3Thin steel follows its own welding code, and we know where it starts11 All AWS D1.3 answers →
AWS D1.8AWS D1.8: the seismic supplement for welds that must hold through a major earthquake14 All AWS D1.8 answers →
RCSC High-Strength BoltsRCSC bolting, with the joint type spelled out for your ironworkers14 All RCSC High-Strength Bolts answers →
ASTM MaterialsASTM grades, part by part, with certificates your reviewer can check14 All ASTM Materials answers →
ConnectionsConnection design responsibility, settled before the first drawing11 All Connections answers →
Shop drawingsOne current revision for your designers, our plant and your jobsite11 All Shop drawings answers →
BIM & TeklaOne Tekla model drives every drawing, from approval set to final bolt13 All BIM & Tekla answers →
SSPC Surface PreparationSSPC surface preparation, from SP 1 to SP 10, done in our blast shop17 All SSPC Surface Preparation answers →
AMPPAMPP: the SSPC and NACE coating standards under one name16 All AMPP answers →
AASHTO Pedestrian BridgesSteel pedestrian bridges, designed to the AASHTO guide specification17 All AASHTO Pedestrian Bridges answers →

The code stack

Six questions every US building department asks, and the standard that answers each

Read top to bottom: each layer takes its numbers from the one above it. Pick any standard to see what it asks of a steel building and exactly how World Steel meets it.

  1. Adopted building code

    Who has authority?

    Your state, county or city adopts a model code and amends it. That code, not a catalog, sets the rules for your permit.

  2. Design loads

    What forces must it resist?

    The adopted IBC sends every load to ASCE 7: dead, live, snow, rain, wind, earthquake and, from the 2022 edition, tornado for some buildings.

  3. Steel design specifications

    How is each member sized?

    Hot-rolled and welded plate members are checked to AISC 360, seismic systems to AISC 341, purlins and girts to AISI S100. Metal building practice and AISC design guides fill in the details.

  4. Fabrication standards

    How is it made and joined?

    Welds follow AWS D1.1 for structural steel and AWS D1.3 for sheet steel, with the AWS D1.8 seismic supplement added for welds in an AISC 341 seismic system. Bolted joints follow RCSC, and every grade is an ASTM grade backed by a mill certificate.

  5. Inspection, approval and seal

    Who checks and signs?

    IBC Chapter 17 decides what gets special inspection. IAS AC472 accreditation lets your building official recognize our plant, and your Engineer of Record approves the drawings.

  6. Import, delivery and records

    How does it reach your site?

    Steel made in Vietnam enters the US under the import rules in force, ships in erection order and arrives with its records. You follow every member live in PEB Studio.

All standards, by discipline

37 codes, standards and methods behind a World Steel building

Each card names the edition we work to by default and how we apply it. The badge shows how the claim is backed: verified against a public record, or confirmed in writing in your quote.

Building codes & adoption

The legal frame: which model code applies, as amended where your building stands.

State & Local Codes

Details confirmed in quote

State and Local Building Code Adoption

Edition: Varies by state and jurisdiction; confirmed per project

The IBC is a model code: it has no force until a state, county or city adopts it, often years after publication and usually with local amendments. Some states adopt one c...

Read the State & Local Codes page →11 Q&A

IBC

Verified

International Building Code

Edition: 2024 (latest edition)

Every state builds its commercial code on the IBC. For a steel building, three chapters do most of the work: 16 brings in ASCE 7 loads, 22 brings in the AISC and AISI ste...

Read the IBC page →15 Q&A

IEBC

Details confirmed in quote

International Existing Building Code

Edition: The edition adopted with your IBC

The ICC code for work on buildings that already stand: additions, alterations, repairs and changes of occupancy. It decides how much of the existing structure has to be c...

Read the IEBC page →14 Q&A
Not sure which edition applies? Send the site address. An engineer confirms the adopted code and its amendments before any member is sized. Ask an engineer →

Steel design

The specifications every member and connection is checked against, from rafter to purlin clip.

AISC 360

Details confirmed in quote

Specification for Structural Steel Buildings

Edition: AISC 360-22 (referenced by IBC 2024)

The American specification that governs strength and stability checks for structural steel members and their connections.

Read the AISC 360 page →14 Q&A

AISC 341

Details confirmed in quote

Seismic Provisions for Structural Steel Buildings

Edition: As referenced

Extra member, connection, welding and material rules for steel systems expected to yield in a strong earthquake.

Read the AISC 341 page →28 Q&A

AISI S100

Details confirmed in quote

North American Specification for the Design of Cold-Formed Steel Structural Members

Edition: As referenced

How light-gauge steel is designed, which in a metal building means the roof purlins, wall girts and eave struts.

Read the AISI S100 page →14 Q&A

MBMA

Details confirmed in quote

Metal Building Systems Manual

Edition: Current edition, as your specification names

The US industry reference for pre-engineered metal buildings: how code loads are applied to a metal building, collateral and crane loads, serviceability guidance, and the...

Read the MBMA page →14 Q&A

AISC DG

Details confirmed in quote

AISC Design Guides 7 and 25

Edition: Current editions, as your Engineer of Record accepts

AISC Design Guide 7 covers industrial buildings, crane runways and their columns; Design Guide 25 covers frame design with web-tapered members, the backbone of a pre-engi...

Read the AISC DG page →14 Q&A
Not sure which edition applies? Send the site address. An engineer confirms the adopted code and its amendments before any member is sized. Ask an engineer →

Welding, bolting & materials

What happens on our shop floor in Vietnam, and the records your reviewer can ask for.

AWS D1.1

Details confirmed in quote

Structural Welding Code — Steel

Edition: Per project specification

The American welding code for structural steel: how procedures are written and proven, how welders qualify and how welds are inspected. Sheet steel falls under AWS D1.3.

Read the AWS D1.1 page →14 Q&A

AWS D1.3

Details confirmed in quote

Structural Welding Code — Sheet Steel

Edition: Per project specification

The American welding code for structural sheet steel up to 4.8 mm (3/16 in) thick: arc spot and arc seam welds, fillet and flare-groove welds on cold-formed members and d...

Read the AWS D1.3 page →11 Q&A

AWS D1.8

Details confirmed in quote

Structural Welding Code — Seismic Supplement

Edition: AWS D1.8/D1.8M:2021, as referenced by AISC 341-22

The supplement to AWS D1.1 for welds in seismic force-resisting systems designed to AISC 341: notch-tough filler metal, demand-critical welds, weld access holes, backing...

Read the AWS D1.8 page →14 Q&A

RCSC

Not yet verified

Specification for Structural Joints Using High-Strength Bolts

Edition: As referenced by AISC 360

Sets the rules for installing, pretensioning and inspecting high-strength bolted joints.

Read the RCSC page →14 Q&A

ASTM

Not yet verified

ASTM Material Standards

Edition: Per specification

The material standards a US steel specification usually names: A992, A572, A36 and A6 for structural steel, A653 and A1011 for strip, F3125 for bolts, F1554 for anchor ro...

Read the ASTM page →14 Q&A

Connections

Details confirmed in quote

Structural Connections

Knee and ridge end plates, brace gussets and base plates: the joints that turn separate members into one frame.

Read the Connections page →11 Q&A

Inspection, approval & documents

How the work is approved, sealed, drawn and proven before it leaves the plant.

The submittal file

Eight documents your reviewer receives, and the standard behind each

Standards only help your permit when the paperwork proves them. These are the records that come with a World Steel job, in the order they arrive, each one tied to the code or standard it answers to and posted in PEB Studio as it is issued.

  1. IBC · ASCE 7 · AISC 360

    Design report

    Design criteria, every load with its source, member and connection checks, and the code basis on the first pages.

    After the contract, with the approval drawings

    How to read it
  2. Your adopted code

    Approval drawings

    Anchor bolt plan, frame elevations, bracing and the reactions your foundation engineer designs to.

    With the design report, for your Engineer of Record

    See a sample set
  3. AISC 360 · AWS D1.1

    Shop drawings and Tekla model

    Every piece detailed with its welds, holes and piece mark, released under revision control.

    Before production, for your approval

    Shop drawing coordination
  4. IBC Chapter 17 · AWS D1.1

    Inspection and test plan

    Each check, its acceptance criteria, its frequency and the hold points you or your inspector can witness.

    Agreed per project before fabrication

    How the ITP works
  5. ASTM grades · EN 10204 3.1

    Mill test certificates

    Chemistry and mechanical results for each heat, matched to the piece marks that use it.

    As material is received, in PEB Studio

    EN 10204 explained
  6. AWS D1.1 · D1.3 · D1.8

    WPS, PQR and welder records

    The qualified procedure for each joint, the test record behind it and the welders qualified to run it.

    Before production welding starts

    WPS and PQR guide
  7. AWS D1.1 Clause 8 · AISC 341 Chapter J

    Weld inspection and NDT reports

    Visual inspection of every weld, plus UT or MT where the plan calls for it, with the results by piece mark.

    As fabrication runs, before release

    Weld inspection and NDT
  8. Your project specification

    Handover data book

    Certificates, inspection records, coating reports, packing lists and as-shipped drawings in one file.

    At final release and shipping

    Handover documents

Part by part

Which standards govern each part we fabricate

The same building answers to different documents in different places. This is the map our engineers and your reviewer work from. Grades shown are the ones US specifications usually name; your specification sets the grade for your job.

Part of the buildingDesignMaterialFabrication & joining
Main frames: columns and raftersBuilt-up steel sections → Plate to ASTM A572 Grade 50 or as specified
Seismic frames and bracingRigid frame systems → Grades with the toughness AISC 341 asks for
Hot-rolled membersHot-rolled structural members → W-shapes to ASTM A992; angles and plates to A36 or A572
Purlins, girts and eave strutsZ purlins → Coil to ASTM A653 coated or A1011 uncoated
Crane runway beams and bracketsCrane runway beams → Plate and rolled shapes as specified
Frame connections and end platesConnection plates → Bolts to ASTM F3125 (A325 / A490) when in our scope
Anchor rods and base platesAnchor bolts → Anchor rods to ASTM F1554
Roof and wall panelsMetal roof panels → Coated sheet to the ASTM grade your specification names
Galvanized steelHot-dip galvanizing → Zinc coating to ASTM A123 (members) or A153 (hardware)
Painted steelEpoxy coatings → Coating systems from Jotun, PPG, Carboline, Hempel, Nippon Paint or International Paint (IP)
Additions to existing buildingsExpansions & add-ons → Matched to the existing frame after a site survey

Edition matters

One building, three possible code editions

The US adopts codes county by county, so two sites an hour apart can be on editions six years apart. When the IBC edition changes, the load standard and the steel specifications change with it. We switch the whole set, not just the loads.

If your jurisdiction enforcesLoadsStructural steelSeismic steelWhat changes for a metal building
IBC 2024DefaultASCE 7-22AISC 360-22AISC 341-22Our default basis. Reliability-targeted ground snow loads, multi-period seismic spectra and tornado loads for Risk Category III and IV buildings in the tornado-prone area.
IBC 2021ASCE 7-16AISC 360-16AISC 341-16Still enforced in many jurisdictions. We switch the whole calculation set to these editions, not just the loads.
IBC 2018ASCE 7-16AISC 360-16AISC 341-16Common where a state adopts slowly. Same steel editions as 2021; local amendments often matter more than the edition.
State code (CBC, FBC, NCSBC…)As the state code namesAs the state code namesAs the state code namesAn IBC-based state code with its own amendments. We read the state code's referenced standards list, not the IBC's.

Each adopted code lists its referenced standards and their editions in its own chapter of referenced standards. Your Engineer of Record confirms the list that applies to your permit; we then design every member to it.

State by state

The code behind the permit, in every US state

Each state guide names the adopted code, the hazard that governs the steel there and the US port your package ships to. Pick a state on the map, or start with the state codes US contractors ask us about most.

From quote to handover

Which standard is in charge at each step, and where you watch it happen

Every step below is logged in PEB Studio, so you, your engineer and your inspector see the same record in real time, from the code basis in the quote to the last bolt list.

  1. Quote

    Code basis, loads and scope agreed in writing before any price is discussed.

  2. Design

    Frames, purlins and connections analyzed and checked to the agreed specifications.

  3. Review & approval

    Your Engineer of Record reviews and approves our design report and drawings; we answer comments on our design in writing.

  4. Shop drawings

    Every piece detailed in Tekla, approved by your team, then released under revision control.

  5. Materials

    Each heat matched to its EN 10204 3.1 mill certificate and ASTM grade before cutting.

  6. Fabrication

    Qualified procedures and welders, inspection to your plan, hold points you can witness online. Seismic welds add the D1.8 supplement.

  7. Shipping

    Packed in erection order, bolts and parts listed per bundle, import paperwork prepared.

  8. Erection & records

    The US contractor, our customer, erects the frame and installs the bolts to RCSC; the handover data book closes the job.

Credentials

What we hold, and what we will never claim

Standards are what we design and build to. Credentials are what an outside body has audited. We keep the two apart, so your reviewer can check every claim.

IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472

Accredited · Parts A and C

IAS AC472 metal building systems

World Steel is the first and only fabricator in Vietnam accredited under IAS AC472, for design and for fabrication. Valid until August 1, 2027.

What it means for your permit →

EN ISO 3834-2 Welding Quality

Bureau Veritas Vietnam

EN 1090 EXC3 (CE marking)

BSI Group The Netherlands B.V. (NB 2797)

AS/NZS 5131 CC3

BSI Group ANZ (Benchmark, JAS-ANZ accredited) · valid until Jul 2030

ISO 9001:2015

Guardian Independent Certification Ltd (UKAS accredited) · valid until Sep 2029

ISO 14001:2015

Guardian Independent Certification Ltd (UKAS accredited) · valid until Sep 2029

ISO 45001:2018

Guardian Independent Certification Ltd (UKAS accredited) · valid until Sep 2029

ISO, EN and AS/NZS certificates are held by World Steel Construction JSC for the Vietnam plant. They show how the plant is run; US code compliance is shown project by project.

Not claimed, on purpose

Claims you will not find on this site

  • AISC certification of the plant (our fabrication accreditation is IAS AC472)
  • AWS certification of the company for D1.1, D1.3 or D1.8 (weld quality is proven per project with procedures, welder records and inspection)
  • MBMA membership (the Manual is a practice reference for us)
  • UL, FM or Miami-Dade product approvals for panels or doors
  • Buy American or BABA eligibility for federal funding
  • A shop inspection waiver: only your building official can grant one
Section 232 import rules

Asked by US engineers and buyers

The standards World Steel applies: questions and answers

34 general answers on the codes we design to, drawings and approval, welding, materials, inspection and what we do and do not claim. Each standard page adds its own set: search them all in the Q&A finder above.

Codes and editions 6 answers

Which building code does World Steel design to?

IBC 2024 with ASCE 7-22 loads and AISC 360-22 by default. If your county or state enforces an older edition or its own state code, we switch the whole calculation set to that basis once your Engineer of Record confirms it.

Our state has its own building code. Can you design to it?

Yes. State codes such as the California Building Code and the Florida Building Code are built on the IBC with state amendments. We design to the edition your jurisdiction has adopted, including the amendments that touch steel, wind, snow and seismic design.

Which standards cover a metal building from foundation to roof?

ASCE 7 sets the loads; AISC 360 designs the hot-rolled and built-up steel; AISI S100 covers cold-formed purlins and girts; AISC 341 adds seismic detailing where required; AWS D1.1, D1.3 and D1.8 govern welding; RCSC covers high-strength bolting; ASTM specifications set the materials. The IBC ties them together.

Do you design by LRFD or ASD?

AISC 360 allows both, and we use whichever method your Engineer of Record prefers. The method is stated on the first page of the calculations and kept the same for the whole building.

How many standards does a typical World Steel building touch?

Usually around a dozen: the adopted IBC and its state amendments, ASCE 7, AISC 360, AISI S100, the AISC Design Guides, AWS D1.1 and D1.3, RCSC, the ASTM material specifications and, in seismic regions, AISC 341 and AWS D1.8. Each has its own page here with its own questions and answers.

Where do I start if I only know the site address?

Send it to us. From the address we find the adopted code, the risk category options and the site loads, then fill in a design criteria sheet your Engineer of Record confirms before any member is sized.

Design, drawings and approval 6 answers

Who seals the drawings for my permit?

The US contractor, our customer, and their Engineer of Record. World Steel designs and fabricates the steel structure; they review, approve and seal the calculations and drawings for the permit.

Can you build to our own engineer's design instead?

Yes. Send the sealed design or drawings and we fabricate to them, with shop drawings for your engineer's approval before production starts.

Which drawings do I get, and when?

Proposal drawings with the quotation, approval drawings and the design report after the contract, then shop drawings and the Tekla model for production. Shop drawings come with every project at no extra charge.

Can the design be optimized without breaking the code?

Yes. Our design optimization looks at bay spacing, frame type, connections and container loading to cut steel tonnage and cost, while every member still meets the code your Engineer of Record has set.

Do you design to US codes from Vietnam, or does a US office do it?

Our engineering team in Ho Chi Minh City designs to the US codes and standards on this page, inside the same IAS AC472-accredited program as the plant. The Westminster, California office is a sales and support office, not a design or fabrication site.

What is in a design criteria sheet?

The code edition and amendments, risk category, every design load with its source, the design method, serviceability limits and the standards the steel is designed to. It is the first page your Engineer of Record signs off, and it heads the calculation package.

Fabrication, welding and bolting 6 answers

Can a plant in Vietnam really meet US codes?

Yes. US codes govern the design, materials, welding and inspection of the steel, not where it is made. Our engineers design to the US specifications, the plant is accredited under IAS AC472 for metal building systems, and every member carries its mill certificate and inspection record to your reviewer.

Which welding codes do you work to?

AWS D1.1 for structural steel, AWS D1.3 for light-gauge sheet steel and AWS D1.8 on top of D1.1 for welds in seismic systems designed to AISC 341.

Are your welders and welding procedures qualified?

Yes. Welding procedures are qualified before production welding starts, welders are qualified for the processes and positions they use, and our shop procedures and welders are qualified to AWS D1.8 for seismic work. The records come with your project.

Are the connections bolted or welded on site?

Our frames are welded in the plant and bolted on site. Bolted joints are designed to the RCSC Specification with high-strength bolts of the grade your drawings specify, and the US contractor installs them in the field.

How much steel can your plant fabricate to these standards?

Our plant fabricates 2,500 metric tons of structural steel a month, all under the same procedures, welder qualifications and inspection plan, so large US jobs get the same records as small ones.

Do you weld purlins and girts, or bolt them?

They are bolted to clips on the frames and lapped with bolts. Where a light-gauge part is welded in the plant, it follows AWS D1.3, and its records go into the project file.

Materials and certificates 6 answers

Where does the steel come from?

All of it comes from plants in Vietnam, and the structure is fabricated in World Steel's own plant there. We do not mix in steel from other countries.

Do I receive mill certificates?

Yes. Plate and sections come with EN 10204 type 3.1 inspection certificates issued by the mill, registered by heat number and filed under each piece mark.

Can you meet ASTM grades?

We order steel to the ASTM grade your drawings call for and check each mill certificate against that specification at intake, before the material is cut.

Can you supply Charpy impact test results?

Yes, on request. Vietnamese mills can provide Charpy V-notch results on the 3.1 certificate where your specification or AISC 341 requires notch toughness.

Can steel be substituted with a non-ASTM grade?

Only with your Engineer of Record's written approval of a side-by-side comparison of chemistry and mechanical properties against the ASTM grade, submitted before the steel is ordered.

How do I trace a member on site back to its certificates?

Scan the QR label on the member. PEB Studio opens its piece mark with the heat numbers, mill certificates, welds and inspections behind it.

Inspection and acceptance 6 answers

Does IAS AC472 replace special inspection?

It can stand in for special inspection of the shop work only, and only if your building official accepts it under IBC Section 1704.2.5. Field inspections go ahead as usual.

Can our inspector witness fabrication?

Yes. You, your special inspector or a third-party agency can witness hold points at the plant in person or live over Zoom or Microsoft Teams, and the video is archived.

Can I see the welding and material records?

Yes. Procedures, welder qualifications, inspection results and mill certificates are filed under each piece mark in PEB Studio and assembled into the Manufacturing Data Record you receive at handover.

What testing is done on welds?

Every weld is inspected visually. Ultrasonic, magnetic particle or dye penetrant testing is added to the extent your specification, AWS D1.1 and, for seismic systems, AISC 341 require.

How often is World Steel audited under IAS AC472?

Twice a year, by IAS experts, covering both the design office and the plant, with Smith-Emery Laboratories conducting the periodic plant inspections named on the certificate. World Steel has held the accreditation since 2019.

Who inspects the steel once it reaches our site?

The US contractor's quality control and the special inspector engaged by the owner, under IBC Chapter 17 and your building department's rules. Our drawings label every bolted joint and protected zone for them.

What we claim, and what we do not 4 answers

Is World Steel AISC or AWS certified?

No. We hold IAS AC472 accreditation, the first and only fabricator in Vietnam to do so, and we design and fabricate to AISC and AWS standards with the records to prove it on each project. We do not claim AISC certification or an AWS company certification.

Does World Steel erect the building?

No. World Steel supplies the steel structure only. Erection is the scope of the US contractor, World Steel’s customer and partner.

Do you supply to federal or Buy American projects?

We make no Buy American or BABA eligibility claim. Imported steel can be restricted on federal work, so federal buyers confirm the requirements with their contracting officer before ordering.

Does World Steel provide the PE seal for our permit?

No. World Steel designs, fabricates and supplies the steel structure. Drawing approval, any PE seal and the permit are the scope of the US contractor and their Engineer of Record; we supply calculations and drawings ready for their review.

Seismic projects

Questions on AISC 341, AWS D1.8 and seismic QA

Seismic systems, capacity design, Charpy toughness, Chapter J inspection and who does what on an earthquake-country job each have their own answers.

Put the standards to work

Where the standards meet your project

Tell us your site, we will tell you the code basis

Send the address and a footprint or drawings. An engineer confirms the adopted code, the design loads and the standards that apply, then sends the design criteria for your Engineer of Record to sign off.