
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
Georgia · Studios and soundstages
Long-span steel for Georgia’s studios
Metro Atlanta has become one of the largest film and television production centers in the US, with studio campuses in Fayette, Clayton, DeKalb and Atlanta itself. A soundstage is a quiet, column-free box with a heavy rigging grid, tall elephant doors and an envelope that keeps the outside world out. Its steel is long-span, heavily loaded and closely coordinated with acoustics.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and landed at a Georgia port.
- Market
- Metro Atlanta studio campuses
- Spans
- Column-free stages, tall clear heights
- Loads
- Grid, catwalk and rigging loads
- Envelope
- Acoustic walls and roofs
Why it matters
A quiet box with a heavy roof
Productions hang lights, sets and equipment from a grid under the roof, and crews work on catwalks above the floor. The roof structure carries those loads across a column-free span, so trusses or deep built-up frames are sized for rigging points the studio operator defines, not just for roof and wind loads.
Sound isolation matters as much as strength. Wall and roof assemblies are built up with mass, insulation and air gaps, and penetrations are detailed so rain, traffic and aircraft noise stay outside. We coordinate the steel with the acoustic consultant’s assemblies.
What we fabricate
Steel for a studio campus
Long-span stages
Trusses or built-up frames for wide, column-free soundstages.
Grid and catwalks
Rigging grids, catwalks and walkways framed for the operator’s load criteria.
Elephant doors
Tall door openings framed for the door’s weight and wind reactions.
Acoustic envelopes
Framing and girts for heavy acoustic wall and roof assemblies.
Mill and support buildings
Workshops, set storage and production offices on the same campus.
Offices and post-production
Multi-story steel frames for offices and edit suites.
What we do not claim
We name no studio as a World Steel customer and claim no acoustic rating. Acoustic performance is designed and verified by the owner’s acoustic consultant; we fabricate the steel to the approved design.
Georgia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Georgia contractors
Georgia contractors: let’s win the next project together
If your next bid involves studios and soundstages, World Steel wants to be your long-term, win-win steel partner in Georgia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Georgia project is cut, welded, inspected and packed.
Q&A
What Georgia buyers ask
Can you fabricate trusses for a heavy rigging grid?
Yes. We fabricate long-span trusses and built-up frames to the Engineer of Record’s design, including the rigging loads the studio operator specifies.
Do you supply acoustic wall panels?
We supply framing, girts and standard panels; specialist acoustic assemblies usually come from acoustic suppliers, and we coordinate the steel with them.
Can a stage be expanded later?
Yes, if planned. We design end walls and connections so another stage or bay can be added without rebuilding the first one.
Official sources: Georgia Film Office
Georgia solutions
Every Georgia guide
Related pages
Code facts on this page summarize Georgia rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Georgia?
Send the drawings or the site address, size and use. We set the Georgia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, landed at Savannah and packed in erection order.