Three types of station
Where crushing steel works hardest
Primary crusher station
The dump pocket, its retaining structure and the crusher support carry truck impact and the crusher’s own loads. Much of this is concrete; the steel is in the superstructure, crane, feeder support and platforms.
Secondary and tertiary crushing
Cone crushers sit high on steel or concrete with feed bins above. The frame carries the bins, the crusher maintenance crane and the access around them.
Screening buildings
Vibrating screens put repeated dynamic forces into their support beams. Stiffness, the frequencies of the frame and the fatigue details decide the design.
Design for dynamics
Stiff enough, and detailed for fatigue
A vibrating screen or crusher support can be strong enough and still fail if it is too flexible or if its natural frequency sits near the running speed of the machine. We take the dynamic loads and operating frequencies from the equipment supplier, check the frame’s frequencies and deflections, and keep them away from resonance as your Engineer of Record requires.
Repeated loads also need fatigue design. AISC 360 Appendix 3 sets the stress ranges for each detail category; we choose details that rate well, such as full-penetration welds ground where needed, continuous stiffeners and bolted splices away from the highest stress ranges, and we avoid short intermittent welds and abrupt changes in section.
In our shop, the welds on these members are made to AWS D1.1 with qualified procedures and welders, and inspected with the nondestructive testing your specification calls for.
Coordinated with the equipment
What we need from the crusher and screen suppliers
| Data | Why it matters | Where it goes |
|---|---|---|
| Static and dynamic loads | Sets member sizes and connection forces | Design calculations for your EOR |
| Operating frequencies | Keeps the frame out of resonance | Frequency check in the analysis model |
| Mounting and isolation details | Sets bolt patterns, stiffeners and bearing plates | Tekla model and shop drawings |
| Maintenance lifts | Sizes the crane or monorail and its clearances | Runway and hoist beam design |
| Liner and chute weights | Adds dead and wear loads to the steel | Load allowances on the calculations |