Cold storage · Tay Ninh Province, Vietnam · 1,000 t in phase 1, phase 2 shown
New Era cold storage
1,000 tabout 1,100 short tons
Steel structure designed, fabricated and supplied by World Steel.
What makes this project type different
A freezer warehouse runs at temperatures far below zero inside while the docks and the outside sit at ambient. The structure lives in that gradient. Columns and beams that pass through the insulation become thermal bridges, and steel in the warm, humid zones at the docks is where condensation and corrosion start.
The design team decides early whether the insulated envelope hangs from the steel, sits outside it or wraps it, and the steel is detailed around that choice. Refrigeration plant on the roof or on platforms, tall walls in high wind and hung ceilings add loads a dry warehouse never sees.
Steel passing through the envelope is detailed with breaks or kept on the warm side, as the design team decides.
Ceiling panels hung from the roof steel add a uniform load and many hanger points.
Evaporators, condensers and machine rooms add heavy, vibrating point loads.
Automated storage pushes clear heights up, and wind on tall walls with it.
Warm, humid air meets cold steel at doors and docks, so coatings and details matter there.
Under-floor heating is the floor contractor’s scope, but it sets where columns and base plates go.
Structures and systems
Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.
| Structure | Typical system | What we fabricate |
|---|---|---|
| Main frames | Rigid or braced frames with interior columns in the racking | Columns, rafters, bracing, base plates |
| Ceiling support | Hanger steel and secondary beams for insulated ceilings | Hanger and ceiling support steel |
| Plant platforms | Roof or mezzanine platforms for refrigeration plant | Platforms, dunnage, stairs and rails |
| Dock zone | Dock canopies, vestibules and door framing | Canopies, door frames, dock steel |
| Office and staging | Attached office or ambient staging hall | Frames in the same model |
Our advice before you bid
Hung ceiling, external envelope or wrapped steel: each changes the steel layout and the details. Decide it at concept.
Weights, footprints and vibration data of the plant before the roof is sized.
Docks and transition zones may need galvanizing or epoxy; the cold, dry core usually does not.
Interior columns placed in the rack lines save steel without losing pallet positions.
Cold storage owners often come back for a second phase. Design the gable for it.
World Steel projects of this type
Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.
Cold storage · Tay Ninh Province, Vietnam · 1,000 t in phase 1, phase 2 shown
1,000 tabout 1,100 short tons
Steel structure designed, fabricated and supplied by World Steel.
Real photos
World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.
Inside our factory
How World Steel supports this
Cold storage experience
A cold storage client that came back for a second phase.
Shop drawings, included
Hanger points, penetrations and dock details on the drawings at no extra charge.
Coatings by zone
Galvanizing or epoxy where condensation is likely, primer where it is not.
The structural steel ecosystem
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Questions from US contractors
Yes. Phase 1 of the New Era cold storage job in Tay Ninh Province, Vietnam, used about 1,000 metric tons of World Steel structural steel, and the client came back for phase 2.
We can supply insulated panels made in Vietnam as part of a package. Refrigeration plant comes from the refrigeration contractor.
We detail the steel to the envelope strategy your design team chooses, with thermal breaks or warm-side steel where they specify it.
Yes. Coatings can change by zone, so the docks and transition areas get the protection they need.
Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.
No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.
A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.
Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.