Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Montana · Mining

Structural steel for Montana mine and mill structures

Montana was built on mining, from the copper of Butte to the platinum and palladium of the Stillwater and the gold of the western ranges. Active mines need mill buildings, truck shops, crane bays and conveyor steel to the owner’s specifications, often far from town. We fabricate and pack that steel.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your Montana site.

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Metals
Copper, PGMs, gold
Typical steel
Mills, truck shops
Cranes
Maintenance bays
Spec
Owner specifications

Why it matters

Mining country, still working

A truck shop for haul trucks needs very wide doors and crane bays, and a mill building stacks heavy equipment in a seismic and snow region. Access roads can limit truck sizes.

We fabricate process buildings, crane bays and conveyor steel to the owner’s specifications, coat them for the exposure and size bundles for the road to the site.

What we design and fabricate

Steel for mines and mills

Process buildings

Mill, concentrator and truck shop buildings.

Crane bays

Crane columns and runways for maintenance.

Conveyor steel

Galleries, trestles and transfer towers to owner specs.

Coatings

Galvanizing or duplex systems for dust and weather.

Who does what

Mine steel, split clearly

World Steel supplies

  • Process buildings, crane bays and conveyor steel
  • Fabrication to owner specifications
  • Coating systems for the exposure
  • Packing for remote site delivery
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Process design and equipment data from the owner
  • Engineer of Record approval and PE seal
  • Site access and foundations
  • Mine safety and permits
  • Erection and site work

Montana

What we do not claim

World Steel names no Montana mining company as a customer and claims no completed Montana mine project. Mine permits and safety are the owner’s scope.

Montana ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Montana contractors

Montana contractors: let’s win the next project together

If your next bid involves copper and metal mines, World Steel wants to be your long-term, win-win steel partner in Montana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Montana project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.

Q&A

What Montana buyers ask

Do you work to mine owner specifications?

Yes. We fabricate to the owner’s project specifications and inspection plan.

Can you supply conveyor steel?

Yes. Galleries, trestles and transfer towers to the owner’s design.

Do you handle mine permits?

No. Mine permits and safety are the owner’s scope.

Official sources: Montana Mining Association

Montana solutions

Every Montana guide

Related pages

Code facts on this page summarize Montana practice, the Montana building code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Montana?

Send the drawings or the site address, size and use. We set the Montana design basis with your Engineer of Record, design or detail the steel to the Montana building code, western seismic belts and mountain snow, and quote it made in our plant in Vietnam, packed complete in erection order and delivered by rail or truck to your site.