Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Louisiana · Soft soils

Steel frames for Louisiana soft soils and subsidence

Much of south Louisiana sits on deep, soft river and marsh deposits with a high water table, and parts of the coast are sinking. Large buildings there usually stand on piles, and every column and every tonne of dead load adds foundation cost. A light steel frame with a well-chosen column layout can save as much below ground as above it.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to your Louisiana site through the Port of New Orleans and the river ports.

Hazard
Soft clays, high water, subsidence
Most affected
New Orleans and the coastal parishes
Answer
Light frames, fewer columns
Our part
Reactions and layouts for your engineer
Tall columns and rafters inside a clear-span building with roof sheeting on
Clear-span interior on a World Steel job in southern Vietnam.

Why it matters

The foundation follows the frame

On soft soils the foundation is often the biggest structural cost. Each column needs a pile group, and heavy frames need more piles. Wide clear spans cut the number of columns, and steel keeps dead load low compared with concrete.

We work with your Engineer of Record and geotechnical engineer on the column grid, give the column reactions early, and detail connections and cladding to tolerate the small differential settlements they expect.

What we provide

Steel choices for soft ground

Clear spans

Fewer columns, fewer pile groups.

Light dead load

Steel frames lighter than concrete.

Early reactions

Column reactions for the pile design.

Movement details

Connections and cladding that tolerate settlement.

Typical options

Frame layouts and foundations

Typical pattern only; your engineers choose the foundation.

LayoutColumnsFoundation effect
Clear-span framePerimeter onlyFewest pile groups
Multi-span frameInterior columnsMore, smaller pile groups
Truss roofWide baysLight roof, long spans

Louisiana

What we do not claim

We do not design foundations or give soil advice. The geotechnical engineer and your Engineer of Record design the foundations; we supply the steel and its reactions.

Louisiana ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Louisiana contractors

Louisiana contractors: let’s win the next project together

If your next bid involves soft soils and subsidence, World Steel wants to be your long-term, win-win steel partner in Louisiana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Louisiana project is cut, welded, inspected and packed.

Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Welder guiding a drilled base plate hanging from a jib hoist
A drilled base plate on its way to fit-up in the Vietnam plant.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Curved long-span trusses being set during erection
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

Q&A

What Louisiana buyers ask

Can you reduce the number of piles?

Wider spans and a lighter frame reduce columns and loads; your engineers design the piles.

When do you give column reactions?

Early in design, so the pile design can start in parallel.

Can steel tolerate settlement?

Connections and cladding can be detailed for the movements your engineer expects.

Official sources: USGS: land subsidence in Louisiana

Louisiana solutions

Every Louisiana guide

Related pages

Code facts on this page summarize Louisiana practice, the Louisiana State Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.

Building in Louisiana?

Send the drawings or the site address, size and use. We set the Louisiana design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.