
Proven at scale
Jobs from 1,000 to 5,000 t, from a 2,500 t/month plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.
-
5,000 t
Sunpro Steel Factory
Steel industry · about 5,500 short tons
-
2,500 t
CPV Food Processing Factory
Food processing · about 2,750 short tons
-
2,000 t
Long Son petrochemical complex
Oil and gas · about 2,200 short tons
-
2,000 t
M&D (MD Factory)
Warehouse and industrial · about 2,200 short tons
-
1,500 t
Tongwei Tien Giang feed factory, phase 1
Animal feed · about 1,650 short tons
-
1,000 t
New Era cold storage
Cold storage, phase 1 tonnage · about 1,100 short tons
Before and after
From the usual steel problem to the World Steel way
Interface by interface
One wall, two suppliers, zero gaps
Where our scope ends and yours begins, layer by layer.
One wall, two suppliers, zero gaps
- Primary frameColumns, rafters and bracing. World Steel
- Girts and purlinsSpaced to your panel’s span tables. World Steel
- InsulationFixed to our secondary steel with agreed details. Your product
- Cladding panelProfiles, trims and flashings coordinated. Your product or ours
- Doors and openingsFramed openings sized to your units. Your product
Request a quotation
Send us your next steel package
Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.
Your scope, mapped
Systems, guides and services that come up in your work
The parts of World Steel that building material suppliers use most, each with its own page to read before you call.
Ecosystem for Building Material Suppliers
Photo
Photo
Photo
Photo
Engineering guides
- Energy Code Building EnvelopesRoofs and walls that pass the IECC
- Complete Building SolutionsFrame, envelope and openings engineered as one US-code building.
How we work
- Packing & shippingBundled in erection sequence, documented for US customs and shipped to West, Gulf or East Coast ports.
- Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
Sectors you build for
Building packages
Buildings to look at
- IAS AC472 — Metal Building Systems
- EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
- EN 1090 EXC3 (CE marking) 2797 CPR 827443
- AS/NZS 5131 CC3 BMP 827566
How mill certificates and inspection records reach your inspector
Questions
What building material suppliers ask us first
Still have one? Ask it in the quote form and an engineer answers in writing.
Can you design the frame around our panel?
Yes. Send the panel span tables and fixing details. Girt and purlin spacing and connections are designed to suit.
Who supplies which part?
It is agreed per program and written into the scope: typically World Steel supplies frame and secondary steel, and you supply your products.
Can the frame and our products ship together?
Where it makes sense, steel can be shipped to match your delivery schedule and site sequence.
Do you supply envelope too?
Yes. World Steel can supply panels, trims and accessories when your range does not cover them.
What capacity is behind the program?
About 2,500 metric tons of structural steel a month from World Steel’s own plant.
Is the steel US-made?
No. It is fabricated in Vietnam and shipped to the US.
Similar roles
State guides
Code editions, local amendments and design loads differ by state. Check the guide for your project location.
All state guides →World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).
Ready to price your next steel package?
Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.