Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

West Coast · California

Steel building packages landed at the Port of Long Beach

Long Beach shares San Pedro Bay with Los Angeles and has some of the deepest water on the West Coast. We ship frames, panels and trims here in containers packed to your erection order, ready for drayage or on-dock rail.

Channel depth
up to 23.2 m (76 ft) main channel; container berths shallower
Rail
UP and BNSF via the Alameda Corridor, on-dock rail
Ocean route
Direct across the Pacific
Our plant → Long BeachWest Coast
Illustrative sea route from the World Steel plant in Vietnam to the Port of Long Beach, across the Pacific. World Steel plant · Vietnam Long Beach
  • Made in our IAS AC472 plant, Vietnam
  • Port of Long Beach
  • Illustrative route; set per booking
Location
Long Beach, California
Port authority
Port of Long Beach (City of Long Beach Harbor Department)
Highways
I-710, I-405, SR-103

Made in Vietnam, landed at Long Beach

Why ship your building through Long Beach

The Port of Long Beach is run by the City of Long Beach Harbor Department and handles a large share of the Asia trade on the West Coast. Its main entrance channel is the deepest in the San Pedro Bay complex, and its terminals have invested heavily in on-dock rail, which suits inland jobs that need steel moved by train.

When your booking discharges at Long Beach, the steel has come straight from World Steel’s own fabrication plant in Vietnam. Each container carries a packing report with its seal number, weight and photos, so your receiving crew knows what is inside before the door is opened.

  • One package, one plant

    Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.

  • Accredited fabrication

    World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.

  • Designed to US codes

    IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.

  • Packed for this port

    Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.

Port facts

Terminals, channel and connections at Long Beach

Channel

up to 23.2 m (76 ft) main channel; container berths shallower

Rail

UP and BNSF via the Alameda Corridor, on-dock rail

Highways

I-710, I-405, SR-103

TerminalWhere / operatorCargo
Long Beach Container TerminalMiddle HarborContainers
Total Terminals InternationalPier TContainers
SSA MarinePier AContainers
Pacific Container TerminalPier JContainers
International Transportation ServicePier GContainers
SSA Marine / MatsonPier CContainers
Breakbulk and project cargo berthsHandled by stevedores at dedicated piers; the berth is named on the bookingBreakbulk

Source: Port of Long Beach, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.

From our plant to Long Beach

How your steel gets here

Direct transpacific service from southern Vietnam to San Pedro Bay, with no canal transit.

Your shipment to Long Beach, leg by leg

Run the full simulation →
Our plantTay Ninh, Vietnam

By road

About 2 hours

World Steel pays

Cai Mep / Cat LaiPort of loading

By sea

≈ 7,100 nmi illustrative lane

Split between us

Long BeachLong Beach, California

Customs, truck or rail

Planned with your trucker

You pay

Your siteErected by the US contractor
Under FOB explained

Risk passes to you when the steel is on board the vessel at the named Vietnamese port.

Inland reach

Where steel goes from Long Beach

Long Beach terminals push a large share of their containers onto on-dock rail, which suits jobs in the Mountain West. Local sites are served by drayage on I-710, and transload yards nearby move steel from containers onto flatbeds.

Map of the United States with the Port of Long Beach, California highlighted, and the states it also serves: Arizona, Nevada, Utah and Colorado. AZ CO CA UT NV
Port stateAlso served from Long BeachPort of Long Beach

Designed for the region

Site conditions we design for around Long Beach

Seismic Design

High seismic demand across the Los Angeles Basin means the lateral system is chosen with the earthquake in mind.

How we design for it

Coastal Corrosion Protection

Harbor-side and coastal sites get a coating system matched to the marine air.

How we design for it

Connections & Load Path

Bolted field connections keep site work quick and avoid field welding.

How we design for it

On arrival

Receiving your steel at Long Beach

Ask about on-dock rail

For inland sites, tell us early so the booking can be routed to a terminal with on-dock rail.

Watch free time

Terminals charge after the free days end; line up the trucker and the site before the vessel arrives.

Check seals at the gate

Compare each seal number with the container packing report before the door is cut.

Documents sent ahead to your broker

  • Commercial invoice and packing list per container
  • Bill of lading and certificate of origin
  • Container packing report with seal number and VGM
  • EN 10204 3.1 mill certificates
  • Shipping marks with a QR link to each member’s passport

What the quote states for Long Beach

  • The Incoterm, for example FOB Vietnam, CFR or CIF Long Beach
  • Who acts as importer of record
  • Containers, flat racks or breakbulk for oversize members
  • Delivery to the port or to a named US place, if offered

No prices, freight rates or duty estimates are published.

PEB Studio · real-time tracking

Follow every bundle from our shop floor to Long Beach

Watch production stage by stage, open the container packing report when the seal goes on, and scan a member’s QR tag at the port or on site to see what it is and where it goes.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Built near Long Beach

Industries and buildings this port serves

World Steel in the US

Projects we have shipped to the United States

All projects

Asked by US buyers

Long Beach shipping questions

How deep is the Port of Long Beach?

The main channel reaches about 23 m (76 ft), the deepest in San Pedro Bay; container berths are shallower but take the largest ships in the transpacific trade.

Can my steel go inland by rail from Long Beach?

Yes. Several terminals have on-dock rail feeding UP and BNSF through the Alameda Corridor. Your logistics provider books the rail leg, or we include it when the quote names an inland place.

Do you publish freight rates or sailing times to Long Beach?

No. Sailings and freight depend on the carrier and season and are confirmed at booking. Your project manager forwards the booking and PEB Studio shows which bundles are already loaded.

Keep reading

Related pages

Other West Coast ports

Building within reach of Long Beach?

Send the site address and what the building is for. Our engineers confirm the design basis, suggest the gateway port and Incoterm, and return a written scope for steel made in our Vietnam plant.