Are your buildings designed to the Florida Building Code?
+
Yes. We design the steel structure to the Florida Building Code edition in force at your permit date, with wind loads from ASCE 7-22 for your parcel and risk category. Your Engineer of Record reviews and approves our calculations and drawings, and the building department makes the permit decision.
Do you hold Florida Product Approval or a Miami-Dade NOA?
+
No, not in our own name today. We coordinate approvals for each envelope product on each project: we specify products that already carry the approval your jurisdiction asks for, or use the local approval path the building department accepts, and we list the status of every item before you sign.
Can you build in Miami-Dade and Broward (the HVHZ)?
+
Yes. The High-Velocity Hurricane Zone is planned from day one: frame and secondary steel are engineered for the higher pressures, and roofing, wall panels, doors and windows are chosen from products approved for HVHZ use.
Where is the steel made?
+
In World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472. The steel comes mainly from mills in Vietnam and ships to JAXPORT, Port Everglades, PortMiami or Port Tampa Bay. Our office in Westminster, California is an office, not a plant.
Are shop drawings included?
+
Yes. Shop drawings come with every project at no extra charge, and you follow your own members through cutting, welding, coating and QC release in PEB Studio.
Do you publish prices or transit times?
+
No. Every Florida building is engineered for its own site, so we quote after a design review. Shipping is planned backward from your site date, in writing.
Can you handle a large Florida project?
+
Yes. Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, and our largest jobs include 5,000 t for Sunpro Steel, 2,500 t for CPV Food and 2,000 t for the Long Son petrochemical complex. Large Florida packages are released and shipped in erection sequences so your crew can start before the last member is made.
How do you plan around hurricane season?
+
We plan the production slot and the sailing backward from your site date and mark the season, June 1 to November 30, on the plan from day one. Bundles are packed in erection order for safe storage on site, and every container is tracked live in PEB Studio.
Do you erect the steel in Florida?
+
No. World Steel designs, fabricates and supplies the structural steel. Erection, foundations and site work are the scope of the US contractor, our customer, who also holds the Engineer of Record, the drawing approval and the permit.
Which coatings do you use for Florida’s coast?
+
We choose hot-dip galvanizing, duplex or multi-coat paint from the corrosivity category of your site. Coating systems come from international brands such as Jotun, PPG, Carboline, Hempel, Nippon Paint and International Paint, which are sold in Florida for touch-up and maintenance.