Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Coated members drying in rows on stands in the paint hall

Members drying in the World Steel paint hall in Vietnam after coating.

Interactive 3D

3D Building Explorer

Click any piece of a demo metal building, about 30 m × 56 m (98 ft × 184 ft), to learn its name and job, from anchor bolts and rigid frames to girts, gutters, a crane runway, a mezzanine and a canopy. Sizes are illustrative; your permit set comes from project-specific engineering.

Interactive 3D metal building with its frame, envelope and accessories labeled

A complete metal building you can rotate, from anchor rods and rigid frames up through the secondary steel, sheeting, gutters, doors, mezzanine, crane runway and canopy. Select a component to read its name and typical specification.

Items for your quote ()

Send these for a quote

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.