Caribbean guide · Rebuild programs

Steel for hurricane recovery and resilient rebuild programs

When a major hurricane crosses an island, the rebuild is not one building but dozens: schools that double as shelters, clinics, police and fire stations, warehouses for relief goods, homes and utility buildings, all needed at once. A steel family designed once and fabricated at 2,500 t a month lets a government, a development bank or a contractor rebuild many of them stronger than before, island by island.

  1. 1988GilbertJamaica
  2. 2004IvanGrenada, Cayman Islands
  3. 2017Irma and MariaBarbuda, Anguilla, BVI, Sint Maarten, USVI, Dominica, Puerto Rico
  4. 2019DorianAbaco and Grand Bahama, The Bahamas
  5. 2024BerylCarriacou, Grenada and Union Island, St Vincent and the Grenadines
  6. 2025MelissaJamaica

Building families

Six kinds of building every rebuild needs at once

Schools and shelters

Classroom blocks and halls designed to the higher risk category so they can shelter people in the next storm.

Clinics and health centres

Single and two-storey frames with plant platforms, designed to stay usable after the storm.

Relief and port warehouses

Clear-span storage for relief goods, food and building materials near the port.

Public buildings

Police, fire and emergency operations buildings, markets and community halls.

Utility buildings

Generator halls, water and power plant buildings, pump houses and substations.

Housing frames

Repeated steel frames for homes and apartments, with the roof tied down to the foundations.

Program pipeline

From a list of buildings to bundles on the dock

Our plant fabricates 2,500 t of structural steel a month, so the buildings of a program move through the shop side by side instead of one after the other.

List

The buildings, sites and islands in the program, with their use and risk category.

Family

A small set of frame types and spans that covers the list, designed once with your engineer.

Site checks

Each site's wind, exposure, seismic and soil values applied to its family member.

Drawings

Approval, shop and erection drawings per building, from the family details, at no extra cost.

Fabrication

Several buildings in the shop at once, each coated for its exposure.

Shipping

Bundles packed building by building and island by island, in erection order.

One family, many buildings

Why a steel family beats one-off designs after a storm

Repeat details

The same connections and members across the program: fewer drawings to check, faster erection, fewer mistakes.

Stronger than before

Designed to current wind and seismic values, not copied from the buildings that failed.

One fabricator

One plant, one quality system and one record for every building of the program.

Each building in the family is designed for its site: hurricane wind design and earthquakes and hurricanes. Contractors bidding a program together with us: Caribbean contractor partnership.

Packed building by building

Bundles marked for each building and island

Real World Steel photos of packing in our plant in Vietnam. None is shown as a Caribbean site.

Rows of labeled steel bundles ready to leave the plant
Steel bundles stacked high on a packing frame awaiting loading
Gray members stacked and strapped together on a packing rack
Long shop floor of built-up members, overhead cranes and a center walkway

Caribbean hurricane and marine guides

The rest of the storm and salt-air story

The code, port and parishes of each island are on its own page:

Questions

Questions on rebuild programs

Can you supply a whole program of buildings after a hurricane?

Yes. Our plant fabricates about 2,500 t of structural steel a month, so several buildings of a program run in the shop at once. We design a family of frames once and adapt each building to its site.

Do you work with governments and development banks?

We supply the steel through the contractor that wins the work, our customer. Public programs often have their own procurement and origin rules; check them before bidding and tell us what they require.

Can rebuilt schools be used as shelters?

Yes, when they are designed for the higher risk category the authority sets for shelters. That raises the design wind speed and the seismic importance, and we design the steel to those values.

Can the same design be used on different islands?

The family can, but each building is checked for its own site: wind speed, exposure, topography, seismic values and soil differ from island to island.

Do you erect the buildings?

No. World Steel supplies the steel structure. Erection and site work are the scope of the contractor, our customer, using our erection drawings and match-marked pieces.

Planning a rebuild program?

Send the list of buildings and islands. We propose a steel family with your engineer of record, show how it covers the program and quote it island by island, made in our plant and shipped to each port.