Colorado · Local codes
Structural steel and Colorado’s local building codes
Colorado does not adopt one building code for every private building. Denver, Aurora, Colorado Springs and most counties and home-rule cities adopt an edition of the IBC with their own amendments, many mountain counties publish their own snow loads, and the state sets energy code requirements and the rules for some building types. The first job on a Colorado project is finding out which code and which snow value the site follows.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed on the West Coast and railed to Denver for your Colorado site.
Summit registerLocal building codes
- Statewide code
- None for private work
- Adopted by
- Counties and cities
- Local tables
- Snow by elevation
- Our part
- Code edition on sheet one
Why it matters
Know the jurisdiction and its snow table
A plant in Weld County and a utility building in Summit County can be reviewed under different IBC editions with different amendments, and the mountain county may set its own ground snow for each elevation. A site just across a county line can change both.
We confirm the jurisdiction, the edition and the local snow and wind values with your Engineer of Record before modeling, and state the code basis, the loads and the design criteria on the first calculation sheet.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Jurisdiction | County or home-rule city, from the site address |
| Code edition | The IBC edition and local amendments in force |
| Snow | The county value by elevation, or ASCE 7 for the site |
| Wind and hail | ASCE 7 wind, any local wind value and hail exposure |
| Steel | AISC 360 design, connection types and coating system |
Who does what
Codes and plan review, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for the local plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The building permit application
- Engineer of Record approval and PE seal
- Special inspections and local inspections
- Foundations and erection
- Fees and filing
Colorado
What we do not claim
World Steel holds no Colorado approval and no Colorado engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the local building department.
Colorado ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Colorado contractors
Colorado contractors: let’s win the next project together
If your next bid involves local building codes, World Steel wants to be your long-term, win-win steel partner in Colorado. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Colorado project is cut, welded, inspected and packed.
Q&A
What Colorado buyers ask
Is there a Colorado state building code?
Not one that covers every private building. Counties and home-rule cities adopt the IBC; the state sets energy code requirements and the rules for some building types.
Where do the snow loads come from?
From the county or city table where one exists, usually by elevation, otherwise from ASCE 7 for the site.
Can you answer plan review comments?
Yes. We answer comments on the steel design and revise drawings through your Engineer of Record.
Official sources: Colorado Division of Housing: building codes · ICC: code adoption by jurisdiction
Colorado solutions
Every Colorado guide
Related pages
Code facts on this page summarize Colorado practice, local IBC adoption, county snow tables, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the county or city building department confirm the code and edition in force for your project.
Building in Colorado?
Send the drawings or the site address, size and use. We set the Colorado design basis with your Engineer of Record, design or detail the steel to your local code, snow table and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.