New Mexico · Building code
Structural steel and the New Mexico Commercial Building Code
New Mexico adopts one commercial building code statewide, based on the IBC, through the Construction Industries Division of the Regulation and Licensing Department. Some cities, Albuquerque among them, run their own permit programs. We confirm the edition and reviewing office before we model.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your New Mexico site.
- Statewide code
- NM Commercial Building Code
- Base
- IBC
- Administered by
- Construction Industries Division
- Our part
- Code stated on sheet one
Why it matters
State code, city or state review
A plant in Albuquerque is reviewed by the city, while a yard near Hobbs may be reviewed by the state. The code base is the same, but seismic, snow and wind values change sharply between the rift, the mountains and the plains.
We confirm the edition and reviewing office with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code | The New Mexico Commercial Building Code edition and the reviewing office |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Snow | Ground snow, drift and the roof shape |
| Seismic | Site class and Seismic Design Category |
| Envelope | Girt and purlin details for the adopted energy code |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The permit application
- Engineer of Record approval and PE seal
- Geotechnical report and site class
- Special inspections and local inspections
- Foundations and erection
New Mexico
What we do not claim
World Steel holds no New Mexico approval and no New Mexico engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.
New Mexico ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Mexico contractors
New Mexico contractors: let’s win the next project together
If your next bid involves Commercial Building Code, World Steel wants to be your long-term, win-win steel partner in New Mexico. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Mexico project is cut, welded, inspected and packed.
Q&A
What New Mexico buyers ask
Is there one code for all of New Mexico?
Yes. The commercial building code applies statewide, with some cities running their own permits.
Who reviews my plans?
The city where it runs a program, otherwise the Construction Industries Division. We confirm it early.
Can you answer plan review comments?
Yes. We answer comments on the steel and revise drawings through your Engineer of Record.
Official sources: New Mexico Construction Industries Division
New Mexico solutions
Every New Mexico guide
Related pages
Code facts on this page summarize New Mexico practice, the New Mexico Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Mexico?
Send the drawings or the site address, size and use. We set the New Mexico design basis with your Engineer of Record, design or detail the steel to the New Mexico Commercial Building Code, Rio Grande seismic rules and altitude snow, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail or truck to your site.