North Dakota · Oil and gas
Structural steel for Bakken oil field facilities
The Bakken and Three Forks formations in western North Dakota made the state one of the largest oil producers in the country, with Williston, Watford City and Tioga as service centers. Operators and service companies need process and compressor buildings, heated shops and equipment steel. We fabricate and galvanize it.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail for your North Dakota site.
- Formation
- Bakken, Three Forks
- Hubs
- Williston, Watford City
- Coatings
- Galvanized outdoors
- Spec
- Owner specifications
Why it matters
Steel for a cold oil field
Bakken facilities run through winters far below freezing, with gas plants, compressor stations and service shops that must stay heated and tight. Owners specify materials, coatings and inspection in detail.
We fabricate to the owner’s specifications and inspection plan, galvanize exposed steel, specify toughness for the design temperature where required and pack by system.
What we design and fabricate
Steel for energy sites
Equipment structures
Platforms and supports for process and electrical equipment.
Plant buildings
Process, compressor and maintenance buildings.
Galvanized steel
Hot-dip galvanizing for exposed outdoor steel.
Owner specifications
Fabrication to the owner’s project specifications.
Who does what
Energy steel, split clearly
World Steel supplies
- Plant buildings, platforms and equipment steel
- Fabrication to owner specifications
- Galvanizing or coating systems for the exposure
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process design and equipment data from the owner
- Engineer of Record approval and PE seal
- Foundations and equipment setting
- Piping, electrical and controls
- Erection and site work
North Dakota
What we do not claim
World Steel names no North Dakota energy or utility company as a customer and claims no completed North Dakota energy project. Process design and equipment are the owner’s scope.
North Dakota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · North Dakota contractors
North Dakota contractors: let’s win the next project together
If your next bid involves Bakken oil field, World Steel wants to be your long-term, win-win steel partner in North Dakota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your North Dakota project is cut, welded, inspected and packed.
Q&A
What North Dakota buyers ask
Do you work to operator specifications?
Yes. We fabricate to the owner’s project specifications and inspection plan.
Can you meet low-temperature toughness?
Yes. We specify Charpy-tested steel on request.
Do you name operators as customers?
No. World Steel names no company as a customer on this site.
Official sources: North Dakota Industrial Commission, Oil and Gas
North Dakota solutions
Every North Dakota guide
Related pages
Code facts on this page summarize North Dakota practice, the North Dakota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in North Dakota?
Send the drawings or the site address, size and use. We set the North Dakota design basis with your Engineer of Record, design or detail the steel to the North Dakota State Building Code, blizzard drift and deep cold, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail for the truck to your site.