Oregon · Port of Portland
Structural steel through the Port of Portland and the Northwest ports
The Port of Portland sits on the Columbia River, about 160 km (100 miles) from the Pacific, with its container terminal and breakbulk docks at Rivergate. When the ocean service fits, Oregon steel lands there; otherwise it arrives through Seattle or Tacoma and comes south by truck or rail on I-5. Distribution centers cluster around Portland, Troutdale and the I-5 corridor.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of Portland or Seattle–Tacoma for your Oregon site.
- Gateways
- Portland or Seattle–Tacoma
- River
- The Columbia
- Highways
- I-5 and I-84
- Packing
- Erection order
Open call · Oregon contractors
Oregon contractors: let’s win the next project together
If your next bid involves port of Portland, World Steel wants to be your long-term, win-win steel partner in Oregon. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Oregon project is cut, welded, inspected and packed.
Q&A
What Oregon buyers ask
Which port is best for Oregon?
Portland when the ocean service fits, otherwise Seattle or Tacoma with truck or rail south. We plan the route with your logistics team.
Can you reach central Oregon?
Yes. Steel for Bend, Redmond and Prineville travels by truck on I-84 and US 97 from the port.
How are members packed?
In erection order, with piece marks and protected bundles, so each load matches the next area to erect.
Official sources: Port of Portland
Oregon solutions
Every Oregon guide
Related pages
Code facts on this page summarize Oregon practice, the Oregon Structural Specialty Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Oregon?
Send the drawings or the site address, size and use. We set the Oregon design basis with your Engineer of Record, design or detail the steel to the Oregon Structural Specialty Code and for Cascadia seismic hazard, snow and coastal wind, and quote it made in our plant in Vietnam, packed in erection order and landed at the Port of Portland or Seattle–Tacoma for the truck to your site.