Colorado · Energy
Structural steel for Colorado energy manufacturing
Colorado makes the parts of the energy system as well as the energy: wind towers and blades in Pueblo, Brighton and Windsor, solar and battery equipment along the Front Range, and oil and gas equipment and facilities in Weld County and the DJ Basin. These plants are long, heavy and crane-driven.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed on the West Coast and railed to Denver for your Colorado site.
Summit registerEnergy manufacturing
- Clusters
- Pueblo, Brighton, Weld County
- Halls
- Long, crane-driven
- Cranes
- Heavy, often tandem
- Yard
- Shelters and racks
Why it matters
Long halls and heavy lifts
A wind-tower plant rolls and welds tower sections down a long hall and lifts them with heavy cranes, often two working together. Blade plants need very long, clear halls. Oil and gas equipment yards need shelters, racks and platforms that stand up to the plains wind.
We design or detail crane runways, built-up crane columns and long frames for the crane classes the plant specifies, and fabricate yard steel and shelters in repeatable modules.
What we design and fabricate
Steel for energy plants
Crane runways
Runways and brackets for heavy and tandem cranes.
Built-up columns
Stepped crane columns made in our plant.
Solar supports
Support structures for solar arrays and canopies.
Yard steel
Shelters, racks and platforms for equipment yards.
Who does what
Energy plant steel, split clearly
World Steel supplies
- Frame, runway and crane column design or detailing
- Yard steel and equipment shelters
- Packages released bay by bay
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Crane classes and loads from the owner
- Engineer of Record approval and PE seal
- Local permit and inspections
- Cranes and process equipment
- Erection and site work
Colorado
What we do not claim
World Steel names no energy or wind-tower company as a customer and claims no completed Colorado energy plant.
Colorado ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Colorado contractors
Colorado contractors: let’s win the next project together
If your next bid involves energy manufacturing, World Steel wants to be your long-term, win-win steel partner in Colorado. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Colorado project is cut, welded, inspected and packed.
Q&A
What Colorado buyers ask
Can you design runways for tandem cranes?
Yes. We design or detail runways and columns for the crane classes and the tandem lifts the plant specifies.
Do you supply solar support steel?
Yes. Solar array supports and canopies can be part of the package.
Can you supply oil and gas yard steel?
Yes. Equipment shelters, racks and platforms, with coatings chosen for the service.
Official sources: Colorado Energy Office
Colorado solutions
Every Colorado guide
Related pages
Code facts on this page summarize Colorado practice, local IBC adoption, county snow tables, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the county or city building department confirm the code and edition in force for your project.
Building in Colorado?
Send the drawings or the site address, size and use. We set the Colorado design basis with your Engineer of Record, design or detail the steel to your local code, snow table and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.