
- Long buildings
- Up to 300 m (984 ft) published
- Capacity
- 2,500 t (5.5 million lb) a month
- Delivery
- Packed and shipped by erection zone
- Ports
- West Coast · Gulf · East Coast
Zoom in on one door
Every dock door is framed, not cut in later
A cross-dock wall is more door than wall. Here is one bay, with the steel we design and supply around each opening.
- Door posts and jambsSteel jambs at every opening, lined up with the bay spacing.
- Header beamCarries the wall above the door and the canopy load.
- Wall girts around the doorGirts trimmed and stiffened around each opening.
- Loading dock canopyCantilevered from the main columns, designed for uplift.
- Overhead doorAdded on request, sized to your trailers.
Levelers, seals, bumpers and door operators come from your dock equipment supplier; we frame the openings to their sizes.
Building shape
Pick the shape before the steel
The door count and the site decide the shape, and the shape decides the frame. Choose one to see the plan and what it means for the steel.
- The simplest, lightest frame for the door count
- Clear span with no columns on the dock floor
- Truck courts on both sides, inbound on one, outbound on the other
- More doors on a site that cannot take a longer building
- Corner bays laid out so the hard-to-reach inside corner stays solid wall
- Expansion joint at the corner where your Engineer of Record calls for it
- Inbound and outbound share one secured yard
- Three wings framed as one building, designed together for wind
- Short travel across the court for yard trucks
- A cross wing for high-volume destinations
- Junction framed with a valley or a step in the roof
- Often the second phase of a straight building with an expandable end wall
Large projects, delivered in order
A long building ships one zone at a time
We split the building along its length into erection zones. Each zone is fabricated, packed and shipped in turn, so your erector starts at one end while the next zone is still in our plant.
Red blocks: containers packed for that zone, labeled to the erection drawings.
Photo
Photo
Photo
Photo
Fabrication capacity
Length is tonnage. Our plant is sized for it.
2,500 metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →- 20,000 m² plant site (215,000 sq ft) in Tay Ninh Province, Vietnam
- 300+ people in engineering, production and quality control
- In parallel several projects move through the shop side by side
- Your slot production slot and ship date confirmed in your quote
- AC472 IAS-accredited design and fabrication, first and only in Vietnam
- 14 countries we have shipped structural steel to
The logistics ecosystem
From our plant to the port nearest your site
Logistics buildings sit near ports and rail. We ship to US ports on every coast; each port page explains the route and what happens after the steel lands.
Gulf Coast
Real World Steel frames
Hundreds of tonnes, frame after frame
Long logistics buildings framed with World Steel steel, including the Sapphire 2 warehouse at about 652 t. Tap a photo to open it full size.
Photo
Sapphire 2, about 652 t
Photo
Sapphire 2 from above
Photo
Roof steel going on
Photo
Warehouse 53 × 120 m
Photo
Warehouse 38 × 135 m Projects outside the US, shown for the structure type; they are not US sites.
Long buildings by World Steel
Projects to open
Photo
Sapphire 2 Warehouse
About 652 t of steel, as published by World Steel. Indonesia · 2025.
Photo
Warehouse 40×240
A 240 m long building, packed zone by zone. 40 m × 240 m (131 ft × 787 ft) · Thailand.
Photo
Warehouse 38×135
Long warehouse beside existing buildings. 38 m × 135 m (125 ft × 443 ft) · Thailand · 2025.
Photo
Warehouse 53×120
Long-span warehouse, 6,360 m². 53 m × 120 m (174 ft × 394 ft) · Thailand · 2023.
Warehouse 36×300M
Our longest published warehouse: 300 m (984 ft). 36 m × 300 m (118 ft × 984 ft) · Thailand · 2026.
Buying steel from outside the US
Every worry about an overseas fabricator, answered in writing
US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.
- Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
- An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
- Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
- Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
- Real-time tracking in PEB Studio“How will I know where my order really is?”
- Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
- Incoterm and importer of record in writing“Who handles customs and duties?”
- One English-speaking project manager“Time zones and language will slow everything down.”
- Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
- Scope split agreed before you sign“Who is responsible for the design?”
- First and only IAS AC472 plant in Vietnam
- Designed to US codes
- Shop drawings at no extra charge
- Live production in PEB Studio
- Supplied to US contractors
What the package contains
Components in this package
A cross-dock earns its keep through door count, not floor area. These buildings are long and narrow, with dock positions running down both sides and trucks working them around the clock. We reinforce every jamb and header in the opening run, size canopies with the frame, and keep the column line clear of the staging lanes.
standard = in the base scope · optional = add if you want it · confirm = depends on your design
Primary Structural System
- Pre-Engineered Metal Buildingsstandard
- Rigid Frame Systemsstandard
- Built-Up Steel Columnsstandard
- Built-Up Steel Raftersstandard
Secondary Framing
- Z Purlinsstandard
- Wall Girtsstandard
- Eave Strutsstandard
- Roof Bracingstandard
- Wall Bracingstandard
Roofing System
- Metal Roof Panelsstandard
- Ridge Capsstandard
- Roof Flashingsstandard
Wall & Cladding System
- Metal Wall Claddingstandard
- Wall Flashingsstandard
Doors & Building Openings
- Industrial Overhead Doorsconfirm
- Opening Reinforcement Steelstandard
Connections & Anchorage
- Anchor Boltsstandard
- Base Platesstandard
- Connection Platesstandard
Drainage & Weather Protection
- Guttersstandard
- Downspoutsstandard
- Loading Dock Canopiesstandard
Not included
- Foundations, slabs-on-grade, anchor rod setting and other sitework.
- Steel erection and field labor, provided by your erector or general contractor.
- Permit applications and plan review fees, unless agreed in writing.
- Mechanical, electrical and plumbing design and installation.
- US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.
Talk to an engineer
Send the door schedule and the footprint.
Our engineers work in English. We frame every opening, plan the erection zones and send a written scope for the steel.
Covered in our state guides
Asked by developers, 3PLs and contractors
Cross-dock questions and answers
14 answers on dock doors, long buildings, phased shipping and scope.
Dock doors and canopies 3 answers
How many dock doors can a cross-dock frame take?
As many as the layout needs. Door spacing is set with the bay spacing so jambs line up with frames or with dedicated door posts, and the wall girts are designed around every opening.
Do you supply the dock canopies?
Yes. Cantilevered loading dock canopies can be framed from the main columns and shipped with the building, so they are designed for wind uplift together with the frame.
Do you supply dock levelers, seals and doors?
Levelers, seals, bumpers and door operators come from the dock equipment supplier you choose. We frame the openings, the header beams and the jambs to their dimensions. Overhead doors can be added to our package on request.
Long buildings and phased delivery 3 answers
How long a building can you supply?
Published World Steel buildings include warehouses of 36 × 300 m (118 × 984 ft) and 40 × 240 m (131 × 787 ft). Length adds repeated bays, which our plant fabricates in runs at 2,500 t (5.5 million lb) a month.
Can the steel arrive in phases?
Yes. We divide the building into erection zones along its length, fabricate and pack each zone in turn and ship zone by zone, so the erector can start at one end while later zones are still in production.
How are expansion joints handled on very long buildings?
Long buildings are split by expansion joints where temperature movement calls for them. Joint locations are agreed with your Engineer of Record and shown on the erection drawings.
Design and codes 2 answers
Which codes do you design to?
IBC 2024 and ASCE 7-22 by default, or your jurisdiction’s edition, with AISC 360, AISI S100 and MBMA practice for the metal building system. Long walls full of doors get extra attention for wind on the openings.
Who approves and seals the drawings?
Your Engineer of Record reviews and approves the calculations and drawings we prepare. The approval, the PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.
Width, shape and growth 3 answers
How wide should a cross-dock be?
Cross-docks are kept narrow so freight crosses the floor quickly; many run about 18 to 36 m (60 to 120 ft) wide, wider where staging lanes or storage are needed. Your operator’s flow sets the width; we design the clear span for it, usually with no interior columns on the dock floor.
Which is better, an I, L, U or T shape?
It depends on the door count and the site. A straight I-shape is the simplest frame and the most common. L, T and U shapes fit more doors on a site that cannot take a longer building, at the cost of corner zones where doors are hard to reach. We frame the shape your layout needs and plan the corner bays and expansion joints with your Engineer of Record.
Can the building grow later?
Yes. One end wall can be designed as an expandable end wall, with a full frame instead of light end-wall framing, so more bays and doors bolt on later without taking the building apart.
Buying, shipping and erection 3 answers
Do you erect the building?
No. World Steel designs, fabricates and supplies the steel structure, and the cladding and canopies if you want them. Foundations, slab, dock pits, erection and site work are the scope of the US contractor, our customer.
Which US ports can you ship to?
West Coast, Gulf and East Coast ports. The port is named in your quote and the Incoterm sets who handles the ocean freight and the import.
Do you publish prices?
No. Send the door schedule, the footprint and the site address and we return a written scope and quotation.
Keep reading
Related pages
Planning a cross-dock?
Send the door schedule, the footprint and the site address. We frame every opening, plan the erection zones and send a written scope for the steel, made in our plant in Vietnam.