Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Oklahoma · Aircraft maintenance

Structural steel for Oklahoma aircraft maintenance hangars

Oklahoma City and Tulsa host some of the largest aircraft maintenance, repair and overhaul centers in the country, for airline, cargo and government fleets. Maintenance hangars span wide enough for wide-body aircraft, carry cranes and docks inside, and have door openings that take up a whole wall, all in Tornado Alley.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Houston and trucked north to your Oklahoma site.

Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.
Clusters
Oklahoma City and Tulsa
Spans
Wide-body clear spans
Doors
Whole-wall openings
Inside
Cranes and docks

Why it matters

A clear span and a door the size of a wall

A maintenance hangar clears the tail of the largest aircraft it serves and spans the wings without interior columns. The hangar door takes up most of one wall, so the door head girder carries the roof above it and the storm wind across it, with tight deflection limits so the door keeps working.

We design or detail deep trusses or built-up frames, the door head girder and jambs, crane runways and the dock and walkway steel inside, and release the steel bay by bay.

What we design and fabricate

Steel for maintenance hangars

Long spans

Trusses and built-up frames for wide-body clear spans.

Door head girders

Girders and jambs for whole-wall door openings.

Crane runways

Runways for overhead and bridge cranes.

Docks and walkways

Access platforms and walkways around aircraft.

Who does what

Hangar steel, split clearly

World Steel supplies

  • Frame, truss and door girder design or detailing
  • Crane runways, docks and walkways
  • Packages released bay by bay
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Owner security and access rules
  • Engineer of Record approval and PE seal
  • Fire protection design and local permit
  • Hangar doors, cranes and docks
  • Erection and site work

Oklahoma

What we do not claim

World Steel names no airline or aircraft maintenance owner as a customer and claims no completed Oklahoma hangar.

Oklahoma ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Oklahoma contractors

Oklahoma contractors: let’s win the next project together

If your next bid involves aircraft maintenance hangars, World Steel wants to be your long-term, win-win steel partner in Oklahoma. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Oklahoma project is cut, welded, inspected and packed.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.

Q&A

What Oklahoma buyers ask

How wide can a hangar span?

As wide as the aircraft needs, with deep trusses or built-up frames designed to your Engineer of Record’s criteria.

Do you design the door head girder?

Yes. The girder and jambs are designed for the roof load, the storm wind and the door maker’s deflection limits.

Can you supply docks and walkways?

Yes. Access platforms, walkways and stairs can be part of the package.

Official sources: Oklahoma Department of Commerce: aerospace

Oklahoma solutions

Every Oklahoma guide

Related pages

Code facts on this page summarize Oklahoma practice, the IBC as adopted by the Oklahoma Uniform Building Code Commission, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Oklahoma?

Send the drawings or the site address, size and use. We set the Oklahoma design basis with your Engineer of Record, design or detail the steel to the statewide code and to tornado, hail, ice and seismic loads, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.