Design and submittals

Every drawing a footbridge needs, in the order you need it

We design the steel and draw it: a proposal set to decide on, a design report your engineer can check, approval drawings for their review, then shop and erection drawings. Your Engineer of Record approves and seals. We revise until they do, and fabricate only from the approved set.

Transmittal register

Five drawing stages, and who acts at each

World Steel designs and draws. Your Engineer of Record approves and seals. Nothing is cut before the approved set.

StageWhat it containsWhat happens nextIssued by

Proposal drawings

Design notes, plans, elevations and 3D views of the span, its members and the site it sits on.

You decide on the scheme

World Steel

Design report

Loads, combinations, member checks and connection designs, set out for your engineer to follow.

Your engineer checks the numbers

World Steel

Approval drawings

Full drawings for review. Comments are closed and every revision is logged.

Your Engineer of Record reviews, approves and seals

Your EOR

Shop drawings

Every chord, gusset and splice plate with its holes, welds and mark. No extra charge.

Fabrication starts on the approved set

World Steel

Erection drawings

Piece marks, sequence, bolts and lifting weights, span by span, in the crew’s language on request.

The US contractor, our customer, erects

World Steel

Read more: the design report, shop drawings at no extra cost and value engineering.

Design basis

The spec sheet behind a footbridge

Figures in this sheet are from the Guyana bridges. Every job follows the owner’s code and the loads your engineer confirms.

Design code

Designed to the code the owner names, usually the AASHTO guide specification for pedestrian bridges, with AISC 360 for the steel.

Crowd load

Guyana: 4.3 kN/m² (about 90 psf) on the deck, as specified for that job. Your engineer confirms the loads for yours.

Steel grades

Built-up members in Q355B or ASTM A572 Gr 50, with mill certificates traced to each piece.

Welding

Designed to AWS D1.1, with double-sided welds where the drawings call for them.

Camber

Long members cambered, L/500 on the Guyana spans, checked on our shop floor.

Other loads

Wind, temperature, vibration and any vehicle or seismic case the owner names.

The code in detail: pedestrian bridge standards. All codes we design to: US codes and standards.

To start the design

Six inputs we ask for

Span and width

Clear span, walkway width and the number of spans.

Clearances

Height over the road, river or rail below, and any navigation or vehicle envelope.

Code and loads

The design code and the owner’s loads, or ask us to propose them for your engineer.

Site

Location, exposure, supports and access for the crane.

Look

Truss form, enclosure, roof, colour and lighting provisions.

Access

Stairs, ramps or elevator frames at each end.

Records

Every revision, on one screen from the US

Drawings, comments, approvals, fabrication status and shipping stay together in PEB Studio, open to your team and your engineer.

How PEB Studio works
3D design model of two enclosed steel box-truss footbridges either side of an existing road bridge in Guyana
3D design model of a pair of steel box-truss pedestrian bridges over a river in Guyana
3D design model of two steel truss footbridges on steel columns beside a road bridge in Guyana
Fitter drilling a stiffened bridge girder marked with its piece mark

Questions

Footbridge drawings and approvals

Who seals the drawings for a pedestrian bridge?

Your Engineer of Record. World Steel designs and fabricates the steel and prepares the calculations and drawings; your Engineer of Record reviews them, approves them and applies the seal for the permit.

What drawings do you deliver for a footbridge?

A proposal set, a design report, approval drawings, shop drawings for every piece and erection drawings for each span. Shop drawings carry no extra charge.

Which code do you design pedestrian bridges to?

The code the owner names. In the US that is usually the AASHTO guide specification for pedestrian bridges, with AISC 360 for the steel and AWS D1.1 for welding.

What do you need to start the design?

Span and width, clearances, the code and loads, the site, the look you want and how people reach the deck. A general arrangement drawing helps.

Can erection drawings be issued in another language?

Yes. For the Guyana bridges the erection drawings were also issued in Chinese for the crew. Ask when you send the job.

Ready to send your footbridge for design?

Send span, width, clearances and the owner’s criteria. We return a scope, a proposal drawing set and a schedule.