Federally funded buildings are usually delivered by a prime contractor, and much of the steel scope is subcontracted. Each agency and funding source can bring its own sourcing, submittal and inspection requirements.
Documentation first
On federally funded work, the paperwork matters as much as the steel. We build the record set alongside fabrication, after you confirm that the contract allows imported steel.
Design calculations, shop drawings and erection drawings prepared to the criteria in your solicitation.
Learn more →Every member traced back to the mill heat it came from, recorded in the Manufacturing Data Record.
Learn more →Fabrication inspected under World Steel’s IAS AC472-accredited program in Vietnam.
Learn more →Each quote states the Incoterm and the importer of record, and shipping documents follow every container.
Learn more →Federally funded buildings are usually delivered by a prime contractor, and much of the steel scope is subcontracted. Each agency and funding source can bring its own sourcing, submittal and inspection requirements.
Steel designed to the criteria the solicitation names, submittals in the format the agency expects, and records that trace members back to mill heats. Domestic-content or foreign-steel restrictions may apply and must be read in the contract itself.
World Steel USA supplies fabricated steel to the contractor, not to the agency. Before quoting, we ask you to confirm the steel sourcing requirements with the contracting officer; we then deliver calculations, shop drawings and a Manufacturing Data Record. We make no eligibility claim for any federal program.
What you can build
Made in our Vietnam plant
Products · Steel buildings
Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.
Photo
Photo
Photo
Photo
Photo
Compact bolted frame with a protective coating
Starts from: Agricultural Steel Buildings
Photo
Building packages
Planned steel building packages for the building types US owners ask for most.
See packages →Engineering
Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.
Federal contracts can restrict foreign steel; the contractor confirms the applicable clauses with the contracting officer before World Steel quotes.
Codes, criteria and submittal formats come from the solicitation and are confirmed by the Engineer of Record.
Each quote states the Incoterm and who acts as importer of record, so responsibility for duties is clear from the start.
Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.
Solutions · End to end
One partner carries your federal & government contractor projects building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.
Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.
Steel building design →Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.
Inside the plant →Watch each of your members move through fabrication and QC release, in real time.
PEB Studio →Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.
Vietnam to USA →Piece marks, erection drawings and packing lists let your erector start straight away.
How we work →PEB Studio
Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.
Demonstration data
The Federal & Government Contractor Projects ecosystem
Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.
ProductsSteel buildings
ProductsBuilding systems
View all →ProductsComponents
+10 more · View all →How we workSolutions
How we helpServices
Your roleWho we serve
View all →ApplicationsRelated industries
View all →Questions and answers
16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.
It depends on the contract. Some federal work restricts foreign steel, so we ask the contractor to confirm the sourcing clauses with the contracting officer before we quote.
With the prime contractor or subcontractor, never directly with the agency. We supply fabricated steel and the records that come with it.
No. Eligibility depends on the contract’s clauses and funding. We state plainly that the steel is fabricated in Vietnam from Vietnamese materials, so your team can check it against the solicitation.
Where the contract allows imported steel: warehouses, maintenance shops, community and MWR buildings, hangars, canopies and storage. The Barfoot MWR Facility Community Center (2024) is one of our references.
We design to the criteria the contract documents and your Engineer of Record name, including UFC requirements they select. The design basis is confirmed in writing before we start.
Yes, when your Engineer of Record assigns it. The frame, bracing and anchorage are then designed to the higher importance factors that category requires.
Yes. We design to the ASCE 7 loads for the site, and seismic force-resisting systems are welded to AWS D1.8 procedures where the design calls for them.
Yes. A standard design can be fabricated again for each installation, with wind, snow and seismic loads re-checked for every location.
Calculations, shop and erection drawings, mill certificates traced to heat numbers, weld and coating inspection results, and packing lists by container.
Inspectors named by the contractor can attend witness points in our Vietnam plant in person or remotely, and follow each piece in PEB Studio between visits.
Yes. World Steel is accredited under IAS AC472, the first and only fabricator in Vietnam to hold it, with audits twice a year.
Yes. The plant fabricates up to 2,500 metric tons (2,756 short tons) of steel a month, so several buildings in a program can move through production together.
No. World Steel designs, fabricates and supplies. Erection, base access and site work are the scope of the US contractor, our customer.
The contractor’s Engineer of Record. We deliver calculations and drawings ready for their review and approval; World Steel does not seal drawings.
To the port named in the proposal, then by truck under the contractor’s logistics plan. Packing lists by container help base security check each delivery.
The solicitation’s structural and sourcing sections, the building size and use, the site and any UFC or agency criteria. We review sourcing first, before design work.
Neighboring industries
Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.