Alaska · Seismic
Structural steel for Alaska earthquake design
Southcentral Alaska saw the magnitude 9.2 Great Alaska Earthquake in 1964 and a magnitude 7.1 near Anchorage in 2018, and many sites fall in Seismic Design Category D or higher. Your Engineer of Record sets the category. We design and fabricate the lateral steel to AISC 341 where it applies.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by sea through Tacoma to Anchorage for your Alaska site.
- Reference events
- 1964 and 2018
- Category
- Often D or higher
- Design
- AISC 341 where it applies
- Welds
- AWS D1.8-qualified
Why it matters
The heaviest combined loads
An Alaska building often carries heavy roof snow and strong earthquakes at once, and part of that snow counts as seismic mass. Braced frames, moment frames and anchorage are sized for the combination, and cold temperatures call for tough steel.
We design or detail lateral systems to AISC 341, mark protected zones on request, weld demand-critical joints with AWS D1.8-qualified WPS and welders and supply plate with Charpy results on request.
What we design and fabricate
Steel for seismic categories
Braced frames
Special concentric and buckling-restrained frame steel.
Moment frames
Prequalified connections under AISC 358 where specified.
Demand-critical welds
Welds made by AWS D1.8-qualified welders with procedures on file.
Anchorage
Base plates and anchor rods for the seismic reactions.
Who does what
Seismic steel, split clearly
World Steel supplies
- Lateral system steel designed or detailed to AISC 341 where it applies
- AWS D1.8-qualified procedures and welders for demand-critical welds
- Protected zones marked on the members on request
- Mill certificates traced by heat, with Charpy results on request
- Tekla shop and erection drawings, included
The US contractor arranges
- Site class and Seismic Design Category by the Engineer of Record
- Engineer of Record approval and PE seal
- Special inspections and the quality assurance plan
- Foundations and anchorage installation
- Erection and site work
Alaska
What we do not claim
AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no Alaska engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.
Alaska ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Alaska contractors
Alaska contractors: let’s win the next project together
If your next bid involves earthquake design, World Steel wants to be your long-term, win-win steel partner in Alaska. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Alaska project is cut, welded, inspected and packed.
Q&A
What Alaska buyers ask
Does snow count in the seismic load?
Part of the roof snow counts as seismic mass where the code requires it. We include it.
Can you supply Charpy-tested plate?
Yes. Vietnam plate mills can supply EN 10204 3.1 certificates with Charpy results on request.
Is AISC 341 a certificate?
No. AISC 341 is a design standard. We design and fabricate to it where it applies.
Official sources: Alaska Earthquake Center
Alaska solutions
Every Alaska guide
Related pages
Code facts on this page summarize Alaska practice, the IBC as adopted for your Alaska site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Alaska?
Send the drawings or the site address, size and use. We set the Alaska design basis with your Engineer of Record, design or detail the steel for great-earthquake seismic, heavy snow and deep cold, and quote it made in our plant in Vietnam, packed by bay in erection order and shipped by sea through Tacoma to Anchorage.