Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

For structural engineers

The Engineer of Record decides. We show our work.

You carry the responsibility for the structure, so you need a fabricator that respects the boundary. World Steel designs the metal building system to the code basis you set, submits full calculations, and changes nothing without your written approval.

  • A written split of design responsibility
  • Calculations for every member and connection
  • No substitution without your approval

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

Design basisSheet A

  • › Designed to IBC edition adopted by the jurisdiction
  • › Designed to ASCE 7 loads for the site
  • › Designed to AISC 360 steel design
  • › Designed to AISI S100 cold-formed members
  • › Designed to AWS D1.1 / D1.3 welding, D1.8 for seismic

Rafter R1 · check: OK
Base reactions → to EOR for foundation design
Status: submitted for EOR approval

Multi-story steel frame designed and fabricated by World Steel

Your role, your problems

The problems we hear most, and our answer to each

  • Fuzzy delegated design

    Nobody wrote down where your design ends and the supplier’s begins.

  • Substitutions without calcs

    A member changed on a shop drawing with no calculation behind it.

  • Revisions that slip through

    A change made in one place and missed everywhere else.

  • A written responsibility splitDelegated items and EOR items listed on the drawings.
  • Calculations for every memberMembers and connections checked and submitted in full.
  • No change without approvalValue Engineering submitted to you, applied only once accepted.
  • Every revision cloudedShop drawings resubmitted with clouds, deltas and a log.

Delegated design

Who designs what

The split we write into every delegated design submittal. Your project may move items between columns; it is agreed before we start.

Who designs what

Engineer of Record

  • Overall structural concept and load path
  • Design criteria and code basis
  • Foundations and anchor embedment
  • Review and approval of delegated design
  • PE seal, where the jurisdiction requires it

World Steel

  • Metal building frame and secondary members
  • Connections within the metal building system
  • Base reactions for your foundation design
  • Calculations and shop drawings for your review
  • Fabrication to the approved drawings

Request a quotation · Structural Engineers

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Become our partner in the US

Engineering firms that specify us often get early technical sessions on unusual loads, spans and site conditions.

See the Contractor Partnership Program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that structural engineers use most, each with its own page to read before you call.

Ecosystem for Structural Engineers

  • Wind, snow & seismic designHow we size a US steel building for ASCE 7-22 wind, snow and earthquake loads at your exact address.
  • Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
  • Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What structural engineers ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Work with our engineering team
What design does World Steel take on?

The metal building system: frames, secondary members and their connections, with calculations and shop drawings. The EOR keeps the overall structure, foundations and approval.

Which standards do you design to?

The IBC edition adopted for the site, ASCE 7 loads, AISC 360, AISI S100 and AWS D1.1 and D1.3, with AWS D1.8 for seismic force-resisting systems. We design to these standards; the approval is yours.

Will you change a member to save steel?

Only with your written approval. Value Engineering options are submitted with calculations for you to accept or reject.

How are revisions tracked?

Every resubmittal shows clouds and revision deltas, and a log lists what changed and why.

Does World Steel provide a PE seal?

No. World Steel designs and fabricates. Calculations and drawings are prepared for the Engineer of Record’s review and approval; the seal and permit are the US contractor’s scope.

Can you fabricate to our own design?

Yes. We fabricate to your stamped drawings and prepare shop drawings for your review.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.