Plant output
2,500 t / month
About 2,750 short tons of structural steel, IAS AC472 plant in Vietnam
Your role, your problems
The problems we hear most, and our answer to each
Fuzzy delegated design
Nobody wrote down where your design ends and the supplier’s begins.
Substitutions without calcs
A member changed on a shop drawing with no calculation behind it.
Revisions that slip through
A change made in one place and missed everywhere else.
- A written responsibility splitDelegated items and EOR items listed on the drawings.
- Calculations for every memberMembers and connections checked and submitted in full.
- No change without approvalValue Engineering submitted to you, applied only once accepted.
- Every revision cloudedShop drawings resubmitted with clouds, deltas and a log.
Delegated design
Who designs what
The split we write into every delegated design submittal. Your project may move items between columns; it is agreed before we start.
Who designs what
Engineer of Record
- Overall structural concept and load path
- Design criteria and code basis
- Foundations and anchor embedment
- Review and approval of delegated design
- PE seal, where the jurisdiction requires it
World Steel
- Metal building frame and secondary members
- Connections within the metal building system
- Base reactions for your foundation design
- Calculations and shop drawings for your review
- Fabrication to the approved drawings
Request a quotation · Structural Engineers
Send us your next steel package
Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.
Become our partner in the US
Engineering firms that specify us often get early technical sessions on unusual loads, spans and site conditions.
See the Contractor Partnership ProgramYour scope, mapped
Systems, guides and services that come up in your work
The parts of World Steel that structural engineers use most, each with its own page to read before you call.
Ecosystem for Structural Engineers
Photo
Photo
Photo
Photo
Engineering guides
- Seismic DesignSeismic Design Category drives the details
- Snow Load Steel BuildingsGround snow, drift and sliding snow, designed in
- Connections & Load PathEvery link from roof sheet to anchor rod
How we work
- Wind, snow & seismic designHow we size a US steel building for ASCE 7-22 wind, snow and earthquake loads at your exact address.
- Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
- Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
Buildings to look at
- Aircraft HangarThailand · 2018
Photo
- CFG Long An BridgeVietnam · 2023
Photo
- North West Community CenterUnited States · 2023
3D model
- IAS AC472 — Metal Building Systems
- EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
- EN 1090 EXC3 (CE marking) 2797 CPR 827443
- AS/NZS 5131 CC3 BMP 827566
How mill certificates and inspection records reach your inspector
Questions
What structural engineers ask us first
Still have one? Ask it in the quote form and an engineer answers in writing.
What design does World Steel take on?
The metal building system: frames, secondary members and their connections, with calculations and shop drawings. The EOR keeps the overall structure, foundations and approval.
Which standards do you design to?
The IBC edition adopted for the site, ASCE 7 loads, AISC 360, AISI S100 and AWS D1.1 and D1.3, with AWS D1.8 for seismic force-resisting systems. We design to these standards; the approval is yours.
Will you change a member to save steel?
Only with your written approval. Value Engineering options are submitted with calculations for you to accept or reject.
How are revisions tracked?
Every resubmittal shows clouds and revision deltas, and a log lists what changed and why.
Does World Steel provide a PE seal?
No. World Steel designs and fabricates. Calculations and drawings are prepared for the Engineer of Record’s review and approval; the seal and permit are the US contractor’s scope.
Can you fabricate to our own design?
Yes. We fabricate to your stamped drawings and prepare shop drawings for your review.
State guides
Code editions, local amendments and design loads differ by state. Check the guide for your project location.
All state guides →World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).
Ready to price your next steel package?
Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.