Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Sunpro Steel factory buildings by World Steel in Can Tho City, Vietnam.

Sunpro Steel Factory, Can Tho City, Vietnam: the largest published World Steel job.

Project references

Steel we have already built, from a 50 t clubhouse to a 5,000 t steel plant

Every reference on this page is a real World Steel job with its place, year and, where the owner allows, its tonnage and site photos. Find one like yours before you send us your drawings.

Built big, shipped from Vietnam

13,000 tabout 14,350 short tons across 6 landmark projects

Our largest structural steel jobs, all fabricated in World Steel’s own IAS AC472-accredited plant: 2,500 t (about 2,750 short tons) of steel a month.

Aerial view of the Sunpro Steel Factory Photo

Factory · Can Tho City, Vietnam · 2024

Sunpro Steel Factory

5,000 tof structural steel · about 5,500 short tons

A 2024 factory for Sunpro Steel in Can Tho City, Vietnam: about 5,000 metric tons (5,500 short tons) of structural steel designed, fabricated and supplied by World Steel.

View project
Aerial view of the CPV Food Processing Factory Photo

Factory · Dong Nai Province, Vietnam · 2020

CPV Food Processing Factory

2,500 tof structural steel · about 2,750 short tons

A food processing factory for CPV Food in Dong Nai Province, Vietnam (2020), built with about 2,500 metric tons (2,750 short tons) of World Steel structural steel.

View project
Aerial view of the Southern Vietnam Petrochemical Complex Photo

Energy & process plant · Long Son, Ba Ria–Vung Tau, Vietnam · 2022

Southern Vietnam Petrochemical Complex

2,000 tof structural steel · about 2,200 short tons

More than 56,000 m² (600,000 sq ft) of steel structures for oil and gas

View project
Aerial view of the M&D Warehouse, Thailand Photo

Warehouse · Thailand · 2024

M&D Warehouse

2,000 tof structural steel · about 2,200 short tons

A 2024 project for M&D in Thailand: about 2,000 metric tons (2,200 short tons) of structural steel designed, fabricated and supplied by World Steel.

View project
Aerial view of the Tien Giang Tongwei Animal Feed Factory (Phase 1) Photo

Factory · Dong Thap Province, Vietnam · 2018

Tien Giang Tongwei Animal Feed Factory (Phase 1)

1,500 tof structural steel · about 1,650 short tons

Phase 1 tonnage

View project
Aerial view of the New Era cold storage site in Tay Ninh Province, Vietnam: the clad high-bay cold store beside the blue NECS building Photo

Cold storage warehouse · Tay Ninh Province, Vietnam · 2024

New Era Cold Storage (Phase 2)

About 1,000 t of steel in phase 1

View project

All projects

Find a job like yours

United States projects come first, then overseas work. Pick an industry, a region or a country, or type a name. Every image is labeled as a site photo, a 3D design model or an illustration.

All industries 140 Multi-storey steel building 21 Warehouse 63 Factory 33 Multi-storey & civil building 18 Commercial & retail building 10
140 projects
Steel frame of the Addario pre-engineered steel building during construction Photo

Warehouse

Addario

United States · 2024

Tonnage on request

3D design model of the Apache Camper Center 3D model

Commercial & retail building

Apache Camper Center

United States · 2023

Tonnage on request

3D design model of the North West Community Center 3D model

Multi-storey & civil building

North West Community Center

United States · 2023

Tonnage on request

Drawn illustration of open steel structure, standing in for a photo of this project Illustration

Open steel structure

Carport

United States · 2019

Tonnage on request

Drawn illustration of steel railing & handrail, standing in for a photo of this project Illustration

Steel railing & handrail

Railing

United States · 2019

150 tabout 150 short tons

Fabricated steel members for the UR Warehouse 2, United States in the fabrication workshop Photo

Warehouse

UR Warehouse 2

United States · 2019

Tonnage on request

Steel frame of the NYT Warehouse, New York during erection Photo

Warehouse

NYT Warehouse

New York, United States

230 tabout 250 short tons

Steel frame of the Cost U Less Supermarket, Guam during construction Photo

Commercial & retail building

Cost U Less Supermarket

Guam · 2023

Tonnage on request

Fabricated steel members for the UR Warehouse, Guam, in the fabrication workshop Photo

Warehouse

UR Warehouse

Guam · 2019

Tonnage on request

Exterior design render of the two-storey FPI Barracks on Guam, gable end and long side 3D model

Multi-storey & civil building

FPI Barracks

Guam

120 tabout 150 short tons

Aerial view of the Sunpro Steel Factory Photo

Factory

Sunpro Steel Factory

Can Tho City, Vietnam · 2024

5,000 tabout 5,500 short tons

Aerial view of the CPV Food Processing Factory Photo

Factory

CPV Food Processing Factory

Dong Nai Province, Vietnam · 2020

2,500 tabout 2,750 short tons

Aerial view of the M&D Warehouse, Thailand Photo

Warehouse

M&D Warehouse

Thailand · 2024

2,000 tabout 2,200 short tons

Aerial view of the Southern Vietnam Petrochemical Complex Photo

Energy & process plant

Southern Vietnam Petrochemical Complex

Long Son, Ba Ria–Vung Tau, Vietnam · 2022

2,000 tabout 2,200 short tons

Aerial view of the Tien Giang Tongwei Animal Feed Factory (Phase 1) Photo

Factory

Tien Giang Tongwei Animal Feed Factory (Phase 1)

Dong Thap Province, Vietnam · 2018

1,500 tabout 1,650 short tons

Steel structure of the 7-ELEVEN, Thailand on site Photo

Commercial & retail building

7-ELEVEN

Thailand · 2020

791 tabout 850 short tons

Steel structure of the Sapphire 2 Warehouse, Indonesia on site Photo

Warehouse

Sapphire 2 Warehouse

Indonesia · 2025

652 tabout 700 short tons

Aerial view of the Goldfields Arts Centre, Kalgoorlie-Boulder Photo

Multi-storey & civil building

Goldfields Arts Centre

Kalgoorlie-Boulder, Western Australia, Australia

400 tabout 450 short tons

Drawn illustration of commercial & retail building, standing in for a photo of this project Illustration

Commercial & retail building

An Phu 3S Hyundai

Ho Chi Minh City, Vietnam

400 tabout 450 short tons

Aerial view of the Hope Valley project, Western Australia Photo

Warehouse

Hope Valley

Hope Valley, Western Australia, Australia

350 tabout 400 short tons

Steel structure of the Vic Ong Warehouse, Philippines on site Photo

Warehouse

Vic Ong Warehouse

Philippines · 2023

220 tabout 250 short tons

Fabricated steel members for the Aircraft Hangar, Thailand in the fabrication workshop Photo

Aircraft hangar

Aircraft Hangar

Thailand · 2018

200 tabout 200 short tons

Drawn illustration of multi-storey & civil building, standing in for a photo of this project Illustration

Multi-storey & civil building

Kosrae Hospital

Kosrae, Federated States of Micronesia

200 tabout 200 short tons

Steel structure of the CFG Long An Bridge on site Photo

Steel bridge

CFG Long An Bridge

Tay Ninh Province, Vietnam · 2023

196 tabout 200 short tons

Aerial view of the Mautic Workshop, Hope Valley Photo

Warehouse

Mautic Workshop

Hope Valley, Western Australia, Australia

60 tabout 50 short tons

3D design model of the Byford Child Care, Australia 3D model

Multi-storey & civil building

Byford Child Care

Western Australia, Australia · 2023

60 tabout 50 short tons

Architect's impression of the Whaleback Golf Club, Western Australia 3D model

Multi-storey & civil building

Whaleback Golf Club

Western Australia, Australia

50 tabout 50 short tons

Painted welded plate girder with a drilled end plate for the Guyana Mosque Photo

Place of worship

Guyana Mosque

Georgetown, Guyana · 2026

Tonnage on request

Welded box columns and plate girders on the shop floor of World Steel’s plant for the New Hope feed factory Photo

Factory

New Hope Dong Nai Feed Factory

Chon Thanh, Dong Nai Province, Vietnam · 2026

Tonnage on request

Aerial view of the Warehouse 30×100, Thailand Photo

Warehouse

Warehouse 30×100

Thailand · 2026

Tonnage on request

Steel structure of the Foot Bridge, Singapore on site Photo

Steel bridge

Foot Bridge

Singapore · 2025

Tonnage on request

Steel structure of the JRI New Factory, Thailand on site Photo

Factory

JRI New Factory

Thailand · 2025

Tonnage on request

Steel structure of the Montaki Warehouse, Japan on site Photo

Warehouse

Montaki Warehouse

Japan · 2025

Tonnage on request

Aerial view of the PSA Port, Singapore Photo

Port facility

PSA Port

Singapore · 2025

Tonnage on request

Aerial view of the Warehouse 38×135, Thailand Photo

Warehouse

Warehouse 38×135

Thailand · 2025

Tonnage on request

Aerial view of the Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory Photo

Factory

Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory

Vinh Long Province, Vietnam · 2024

Tonnage on request

Steel structure of the Honda Warehouse, Philippines on site Photo

Warehouse

Honda Warehouse

Philippines · 2024

Tonnage on request

Steel structure of the Malang Warehouse, Indonesia on site Photo

Warehouse

Malang Warehouse

Indonesia · 2024

Tonnage on request

Steel structure of the Namyong Warehouse, Thailand on site Photo

Warehouse

Namyong Warehouse

Thailand · 2024

Tonnage on request

Aerial view of the New Era cold storage site in Tay Ninh Province, Vietnam: the clad high-bay cold store beside the blue NECS building Photo

Cold storage warehouse

New Era Cold Storage (Phase 2)

Tay Ninh Province, Vietnam · 2024

Tonnage on request

Steel structure of the Proposed Simon Warehouse Complex, Philippines on site Photo

Warehouse

Proposed Simon Warehouse Complex

Philippines · 2024

Tonnage on request

Aerial view of the Sheng Long Biotech (Hai Duong) Aquatic Feed Factory Photo

Factory

Sheng Long Biotech (Hai Duong) Aquatic Feed Factory

Hai Phong City, Vietnam · 2024

Tonnage on request

Steel structure of the Siam Lubric Warehouse, Thailand on site Photo

Warehouse

Siam Lubric Warehouse

Thailand · 2024

Tonnage on request

Fabricated steel members for the Warehouse 12×24 & Warehouse 12×18, Thailand in the fabrication workshop Photo

Warehouse

Warehouse 12×24 & Warehouse 12×18

Thailand · 2024

Tonnage on request

Fabricated steel members for the Warehouse 20×36 & Warehouse 20×24, Thailand in the fabrication workshop Photo

Warehouse

Warehouse 20×36 & Warehouse 20×24

Thailand · 2024

Tonnage on request

Aerial view of the Warehouse 23×62, Thailand Photo

Warehouse

Warehouse 23×62

Thailand · 2024

Tonnage on request

Steel structure of the Warehouse 36×114, Thailand on site Photo

Warehouse

Warehouse 36×114

Thailand · 2024

Tonnage on request

Steel structure of the 3 Storey College of Medicine, Philippines on site Photo

Multi-storey & civil building

3 Storey College of Medicine

Philippines · 2023

Tonnage on request

Steel structure of the 3N1 Warehouse, Philippines on site Photo

Warehouse

3N1 Warehouse

Philippines · 2023

Tonnage on request

Steel structure of the Hau Giang Number One Beverage Factory on site Photo

Factory

Hau Giang Number One Beverage Factory

Can Tho City, Vietnam · 2023

Tonnage on request

Steel structure of the JSB Warehouse 28×76, Thailand on site Photo

Warehouse

JSB Warehouse 28×76

Thailand · 2023

Tonnage on request

Steel structure of the JSB Warehouse 55×127, Thailand on site Photo

Warehouse

JSB Warehouse 55×127

Thailand · 2023

Tonnage on request

Steel structure of the Makro Prachinburi, Thailand on site Photo

Commercial & retail building

Makro Prachinburi

Thailand · 2023

Tonnage on request

Steel structure of the Nitto Denko Factory on site Photo

Factory

Nitto Denko Factory

Ho Chi Minh City, Vietnam · 2023

Tonnage on request

Steel structure of the Philippines Warehouse 2023 on site Photo

Warehouse

Philippines Warehouse 2023

Philippines · 2023

Tonnage on request

Steel structure of the Proposed 3 Storey Commercial Building, Philippines on site Photo

Multi-storey & civil building

Proposed 3 Storey Commercial Building

Philippines · 2023

Tonnage on request

Fabricated steel members for the SMC3 Warehouse, Thailand in the fabrication workshop Photo

Warehouse

SMC3 Warehouse

Thailand · 2023

Tonnage on request

Aerial view of the Warehouse 16×50, Thailand Photo

Warehouse

Warehouse 16×50

Thailand · 2023

Tonnage on request

Fabricated steel members for the Warehouse 38×75, Thailand in the fabrication workshop Photo

Warehouse

Warehouse 38×75

Thailand · 2023

Tonnage on request

Steel structure of the Warehouse 50×140, Thailand on site Photo

Warehouse

Warehouse 50×140

Thailand · 2023

Tonnage on request

Steel structure of the Warehouse 53×120, Thailand on site Photo

Warehouse

Warehouse 53×120

Thailand · 2023

Tonnage on request

Steel structure of the World Steel Group Office, Tay Ninh on site Photo

Multi-storey & civil building

World Steel Group Office, Tay Ninh

Tay Ninh Province, Vietnam · 2023

Tonnage on request

Steel structure of the Based Meat Factory, Thailand on site Photo

Factory

Based Meat Factory

Thailand · 2022

Tonnage on request

Aerial view of the Brotex Yarn Manufacturing Factory Photo

Factory

Brotex Yarn Manufacturing Factory

Tay Ninh Province, Vietnam · 2022

Tonnage on request

Fabricated steel members for the CPE Warehouse 80×120, Thailand in the fabrication workshop Photo

Warehouse

CPE Warehouse 80×120

Thailand · 2022

Tonnage on request

Aerial view of the Hai Trung Furniture Showroom and Model House Center Photo

Multi-storey & civil building

Hai Trung Furniture Showroom and Model House Center

Vietnam · 2022

Tonnage on request

Steel structure of the Mongkolphisan Warehouse 80×70, Thailand on site Photo

Warehouse

Mongkolphisan Warehouse 80×70

Thailand · 2022

Tonnage on request

Fabricated steel members for the Omakase Car Park Building D, Thailand in the fabrication workshop Photo

Car park

Omakase Car Park Building D

Thailand · 2022

Tonnage on request

Steel structure of the Pegasus Warehouse, Thailand on site Photo

Warehouse

Pegasus Warehouse

Thailand · 2022

Tonnage on request

Aerial view of the Syncro Engineering, Picton East Photo

Steel building

Syncro Engineering

Picton East, Western Australia, Australia · 2022

Tonnage on request

Steel structure of the Warehouse 19.4×37, Thailand on site Photo

Warehouse

Warehouse 19.4×37

Thailand · 2022

Tonnage on request

Steel structure of the AMW Warehouse, Thailand on site Photo

Warehouse

AMW Warehouse

Thailand · 2020

Tonnage on request

Steel structure of the ASEAN Warehouse, Thailand on site Photo

Warehouse

ASEAN Warehouse

Thailand · 2020

Tonnage on request

Steel structure of the Boss Pharmacere Factory, Thailand on site Photo

Factory

Boss Pharmacere Factory

Thailand · 2020

Tonnage on request

Fabricated steel members for the Chumpon Market, Thailand in the fabrication workshop Photo

Commercial & retail building

Chumpon Market

Thailand · 2020

Tonnage on request

Fabricated steel members for the Coca Cola Warehouse, Philippines in the fabrication workshop Photo

Warehouse

Coca Cola Warehouse

Philippines · 2020

Tonnage on request

Steel structure of the Dat Tuan Pharmaceutical Office on site Photo

Multi-storey & civil building

Dat Tuan Pharmaceutical Office

Ho Chi Minh City, Vietnam · 2020

Tonnage on request

Aerial view of the GPPD Energy Factory Photo

Factory

GPPD Energy Factory

Dong Nai Province, Vietnam · 2020

Tonnage on request

Aerial view of the Hai Duong Tongwei Animal Feed Factory Photo

Factory

Hai Duong Tongwei Animal Feed Factory

Hai Phong City, Vietnam · 2020

Tonnage on request

Fabricated steel members for the Hat Yai Project, Thailand in the fabrication workshop Photo

Steel building

Hat Yai Project

Thailand · 2020

Tonnage on request

Fabricated steel members for the HDD Warehouse, Thailand in the fabrication workshop Photo

Warehouse

HDD Warehouse

Thailand · 2020

Tonnage on request

Steel structure of the Interlink Factory, Thailand on site Photo

Factory

Interlink Factory

Thailand · 2020

Tonnage on request

Fabricated steel members for the Maesod Warehouse, Thailand in the fabrication workshop Photo

Warehouse

Maesod Warehouse

Thailand · 2020

Tonnage on request

Steel structure of the Marko Khonkaen, Thailand on site Photo

Commercial & retail building

Marko Khonkaen

Thailand · 2020

Tonnage on request

Aerial view of the Millennium Furniture Factory Photo

Factory

Millennium Furniture Factory

Quang Ngai Province, Vietnam · 2020

Tonnage on request

Steel structure of the Pathumtani Warehouse, Thailand on site Photo

Warehouse

Pathumtani Warehouse

Pathumtani, Thailand · 2020

Tonnage on request

Fabricated steel members for the Phuket House, Thailand in the fabrication workshop Photo

Multi-storey & civil building

Phuket House

Thailand · 2020

Tonnage on request

Fabricated steel members for the SKB Marry Mart, Thailand in the fabrication workshop Photo

Commercial & retail building

SKB Marry Mart

Thailand · 2020

Tonnage on request

Fabricated steel girders for the Southgate Tower on a truck Photo

Multi-storey & civil building

Southgate Tower

Ho Chi Minh City, Vietnam · 2020

Tonnage on request

Fabricated steel members for the Steel Bridge, Singapore in the fabrication workshop Photo

Steel bridge

Steel Bridge

Singapore · 2020

Tonnage on request

Steel structure of the TFIC Warehouse, Thailand on site Photo

Warehouse

TFIC Warehouse

Thailand · 2020

Tonnage on request

Fabricated steel members for the Thaworn Warehouse, Thailand in the fabrication workshop Photo

Warehouse

Thaworn Warehouse

Thailand · 2020

Tonnage on request

Steel structure of the The Sun Tower on site Photo

Multi-storey & civil building

The Sun Tower

Ho Chi Minh City, Vietnam · 2020

Tonnage on request

Fabricated steel members for the Winmax Export Project, Thailand in the fabrication workshop Photo

Port facility

Winmax Export Project

Thailand · 2020

Tonnage on request

Steel structure of the Hoa Phat Factory Project on site Photo

Factory

Hoa Phat Factory Project

Quang Ngai Province, Vietnam · 2019

Tonnage on request

Fabricated steel members for the Kanata project, Myanmar in the fabrication workshop Photo

Steel building

Kanata

Myanmar · 2019

Tonnage on request

Aerial view of the Nam Long Warehouse Photo

Warehouse

Nam Long Warehouse

Tay Ninh Province, Vietnam · 2019

Tonnage on request

Fabricated steel members for the Perumal Steel Mould Factory, Malaysia in the fabrication workshop Photo

Factory

Perumal Steel Mould Factory

Malaysia · 2019

Tonnage on request

Fabricated steel members for the Tamada Warehouse, Myanmar in the fabrication workshop Photo

Warehouse

Tamada Warehouse

Myanmar · 2019

Tonnage on request

Fabricated steel members for the Thailand Factory 2019 in the fabrication workshop Photo

Factory

Thailand Factory 2019

Thailand · 2019

Tonnage on request

Fabricated steel members for the TPlas Factory, Thailand in the fabrication workshop Photo

Factory

TPlas Factory

Thailand · 2019

Tonnage on request

Fabricated steel members for the Tuatong 2 Warehouse, Thailand in the fabrication workshop Photo

Warehouse

Tuatong 2 Warehouse

Thailand · 2019

Tonnage on request

Fabricated steel members for the Tuatong Warehouse, Thailand in the fabrication workshop Photo

Warehouse

Tuatong Warehouse

Thailand · 2019

Tonnage on request

Steel structure of the World Steel Group Office, Ho Chi Minh City on site Photo

Multi-storey & civil building

World Steel Group Office, Ho Chi Minh City

Ho Chi Minh City, Vietnam · 2019

Tonnage on request

Aerial view of the World Steel Group Steel Structure Factory Photo

Factory

World Steel Group Steel Structure Factory

Tay Ninh Province, Vietnam · 2016

Tonnage on request

Steel structure of the ASRS + Intake Kampot, Cambodia on site Photo

Warehouse

ASRS + Intake Kampot

Kampot, Cambodia

Tonnage on request

Fabricated steel members for the Greenfeed Factory, Cambodia in the fabrication workshop Photo

Factory

Greenfeed Factory

Cambodia

Tonnage on request

Aerial view of the Tay Ninh AA Corporation Factory Photo

Factory

Tay Ninh AA Corporation Factory

Tay Ninh Province, Vietnam

Tonnage on request

Steel structure of the Warehouse 20×36, Thailand on site Photo

Warehouse

Warehouse 20×36

Thailand

Tonnage on request

Steel structure of the Warehouse 25×42, Thailand on site Photo

Warehouse

Warehouse 25×42

Thailand

Tonnage on request

Aerial view of the Warehouse 25×80, Thailand Photo

Warehouse

Warehouse 25×80

Thailand

Tonnage on request

Fabricated steel members for the Warehouse 26×49, Thailand in the fabrication workshop Photo

Warehouse

Warehouse 26×49

Thailand

Tonnage on request

Fabricated steel members for the Warehouse 40×240, Thailand in the fabrication workshop Photo

Warehouse

Warehouse 40×240

Thailand

Tonnage on request

Aerial view of the Warehouse 72×74, Thailand Photo

Warehouse

Warehouse 72×74

Thailand

Tonnage on request

Drawn illustration of warehouse, standing in for a photo of this project Illustration

Warehouse

Warehouse 20×36M

Thailand · 2026

Tonnage on request

Drawn illustration of warehouse, standing in for a photo of this project Illustration

Warehouse

Warehouse 30×55

Thailand · 2026

Tonnage on request

Drawn illustration of warehouse, standing in for a photo of this project Illustration

Warehouse

Warehouse 36×300M

Thailand · 2026

Tonnage on request

Drawn illustration of warehouse, standing in for a photo of this project Illustration

Warehouse

Warehouse 45×120M

Thailand · 2026

Tonnage on request

Drawn illustration of warehouse, standing in for a photo of this project Illustration

Warehouse

Wika Intinusa Warehouse

Indonesia · 2025

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Sun-Tech Mechanical Components Factory

Dong Nai Province, Vietnam · 2024

Tonnage on request

Drawn illustration of warehouse, standing in for a photo of this project Illustration

Warehouse

Warehouse 54×112

Thailand · 2024

Tonnage on request

3D design model of the Proposed Residential Building, Antigua and Barbuda 3D model

Multi-storey & civil building

Proposed Residential Building

Antigua and Barbuda · 2023

Tonnage on request

3D design model of the Guyana Warehouse 3D model

Warehouse

Guyana Warehouse

Guyana · 2022

Tonnage on request

3D design model of the Guyana Warehouse 2 3D model

Warehouse

Guyana Warehouse 2

Guyana · 2022

Tonnage on request

Drawn illustration of multi-storey & civil building, standing in for a photo of this project Illustration

Multi-storey & civil building

Tien Giang General Hospital

Vietnam · 2022

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Tan Uyen Nam Son Factory

Ho Chi Minh City, Vietnam · 2021

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Nakagawa MFG Vietnam Factory

Lam Dong Province, Vietnam · 2020

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Tien Giang Tongwei Animal Feed Factory (Expansion)

Dong Thap Province, Vietnam · 2020

Tonnage on request

Drawn illustration of warehouse, standing in for a photo of this project Illustration

Warehouse

Cat Lai Warehouse

Ho Chi Minh City, Vietnam · 2019

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

FAPV Factory

Ho Chi Minh City, Vietnam · 2019

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Le Tran Factory

Ho Chi Minh City, Vietnam · 2019

Tonnage on request

Drawn illustration of warehouse, standing in for a photo of this project Illustration

Warehouse

Pacific Warehouse

Hoc Mon District, Vietnam · 2019

Tonnage on request

Drawn illustration of energy & process plant, standing in for a photo of this project Illustration

Energy & process plant

Thuan Bac Solar Power Plant (Trung Nam Ninh Thuan)

Khanh Hoa Province, Vietnam · 2019

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Tung Kuang Industrial Factory

Dong Nai Province, Vietnam · 2019

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Anh Phat Factory

Tay Ninh Province, Vietnam · 2018

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Cuong Dai Packaging Factory

Tay Ninh Province, Vietnam · 2018

Tonnage on request

Drawn illustration of multi-storey & civil building, standing in for a photo of this project Illustration

Multi-storey & civil building

Phu Cuong Hotel

Ca Mau Province, Vietnam · 2018

Tonnage on request

Drawn illustration of factory, standing in for a photo of this project Illustration

Factory

Saigon - Cu Chi Beer Factory

Ho Chi Minh City, Vietnam · 2018

Tonnage on request

Drawn illustration of commercial & retail building, standing in for a photo of this project Illustration

Commercial & retail building

Bao Loc Showroom

Lam Dong Province, Vietnam

Tonnage on request

Drawn illustration of commercial & retail building, standing in for a photo of this project Illustration

Commercial & retail building

Binh Chau Hot Spring Renovation

Vietnam

Tonnage on request

Caribbean projects

Our Caribbean work: Guyana and Antigua and Barbuda

For Guyana: an office building, 6 warehouses, 2 large maintenance workshops, pedestrian footbridges and a mosque. For Antigua and Barbuda: a residential building. World Steel designs and fabricates the steel in its plant in Vietnam and ships it to the port. The local contractor, our customer, erects it.

Plant, VietnamGeorgetown · St John’s

Repeat customers

Owners who came back for the next plant

A second plant, a second phase or a third warehouse from the same owner is the strongest reference a fabricator can show.

Tongwei · 3 projects

Three feed plants and an expansion

Tongwei Tien Giang logo

Tongwei came back plant after plant: Hai Duong, Tien Giang phase 1 (about 1,500 t of steel) and the Tien Giang expansion. One owner, one fabricator, repeated across sites, the way a US program of buildings runs.

  1. Hai Duong Tongwei Animal Feed FactoryHai Phong City, Vietnam · 2020
  2. Tien Giang Tongwei Animal Feed Factory (Phase 1)Dong Thap Province, Vietnam · 2018 · 1,500 t
  3. Tien Giang Tongwei Animal Feed Factory (Expansion)Dong Thap Province, Vietnam · 2020

Who did what

The same split on every project in this atlas

World Steel supplies the steel structure. The contractor, our customer, approves, permits and erects it. That is how every job above was delivered, and how yours would be.

World SteelFrom our plant in Vietnam

  • Design calculations and drawings for your Engineer of Record
  • Shop drawings and erection drawings, included
  • Fabrication, welding and coating in our own plant in Vietnam
  • Packing by erection sequence and shipping to the port
  • Engineering support by phone and video while your crew erects

US contractor, our customerOn your site

  • Engineer of Record review, approval and PE seal
  • Building permit and special inspections
  • Foundations, anchor rods and site work
  • Steel erection with your own crew
  • Local trades and handover to the owner

Q&A

Questions about our project record

Are these all World Steel projects?

Yes. Every record is a job whose steel structure World Steel designed, fabricated and supplied from its own plant in Vietnam. Projects appear only after World Steel approves them for publication, and no client endorsement is implied.

Are the photos real?

Each image carries a label. "Photo" means a site or plant photo of that project, "3D model" means a design model of it, and "Illustration" means a generic drawing used where no photo is published yet. We do not use stock photos of other companies' buildings.

What is the largest job World Steel has fabricated?

The Sunpro Steel Factory in Vietnam, with about 5,000 metric tons (about 5,500 short tons) of structural steel. The plant fabricates 2,500 metric tons a month, and several projects move through the shop in parallel.

Have you supplied projects in the United States?

Yes. The United States group lists projects shipped to US soil, including the US territory of Guam. They were designed to American codes, shipped from Vietnam and erected by the US contractor, our customer.

Did World Steel erect these buildings?

No. World Steel designs, fabricates and supplies the steel structure. Erection, foundations and site work are the contractor's scope, and our engineers support the erection crew by phone and video.

Who sealed the drawings on US projects?

The US contractor and their Engineer of Record. We prepare calculations and drawings ready for that engineer's review and approval; the PE seal and the permit stay with the contractor.

Why do some projects show no tonnage?

We publish a tonnage only when World Steel has released it for that project. Where it is blank, ask us and we tell you what we can share for your bid file.

Can we visit a project or the plant?

You can book a video walk-through of the plant from the US, or visit it in Vietnam. Site visits to a finished building depend on the owner, so ask and we check what is possible.

Can you send references for our prequalification?

Yes. Tell us the type and size of your project and we send matching project records, certificates and sample submittal documents for your prequalification package.

How do I get a quote for a project like one of these?

Send drawings, or just a footprint, height and site address, through the quote form. We reply with a scope and a quote; prices are never published on the site.

Open call · US contractors

World Steel is looking for US contractor partners

General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.

You bring

  • Your market and owners
  • EOR approval and permit
  • Foundations and erection

We bring

  • 2,500 t a month, own plant
  • IAS AC472, first in Vietnam
  • Engineering and shop drawings

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.