Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Building package · Solar & EV charging

Sun above.
Cars below.
One steel frame.

A solar canopy is two layouts stacked on one steel frame: modules above, stalls and chargers below. World Steel, a structural steel fabricator producing 2,500 t (5.5 million lb) a month in our own plant in Vietnam, sets the columns around the cars, lays the purlins out to the modules and ships whole parking fields of canopy steel to your US contractor.

Show a layer
MODULES ON PURLINS DRAIN CLEAR HEIGHT CHARGER STALL

Above: the modules. Purlins spaced to the module and racking layout, the frame tilted to your solar designer’s angle, drainage to the low edge.

Below: stalls and chargers. Columns between stall pairs and clear of charger islands, clear height for the vehicles you park, conduit paths kept open.

Diagram, not a design. Frame shape, tilt and heights come from your layouts.

Columns
Placed clear of stalls and chargers
Purlins
Matched to the module layout
Coating
Hot-dip galvanizing on request
Capacity
2,500 t (5.5 million lb) a month
Steel frames and roof purlins against a blue sky on a World Steel job in southern Vietnam Photo · Frames and purlins

Columns around the cars

Plan the parking first, then the steel

We set the column lines from your stall and charger layout before the frame is designed, so no column lands in a door swing, a drive aisle or a charger island.

CANOPY ABOVE · MODULE ARRAY DRIVE AISLE · KEPT CLEAR
Steel column, between stall pairs Charger island, by the electrical contractor Parking stall

Illustration only. Stall sizes, column spacing and charger positions come from your site plan.

The solar canopy ecosystem

Four trades, one clear line between them

Who supplies what on a solar and EV canopy. The steel sits in the middle of every trade, so its layout is set from theirs.

Plain parking canopies without solar? See carport and canopy structures.

Three ways to hold up the array

Pick the canopy frame from the parking layout

The stalls, the drive aisles and the chargers decide where columns can stand, and that decides the frame. These are the three frames we design most often for solar parking.

Single post, T-frame

One column line between two stall rows, beams reaching both ways.

  • Fits a double row of stalls
  • Fewest columns and footings per stall
  • Balanced cantilevers keep column bending low

Single post, cantilever

Columns at the head of one stall row, the beam reaching over the cars.

  • Fits a single row along a building or a property line
  • Stall fronts left clear for doors and chargers
  • Larger columns and footings to resist the overhang

Two-post long span

Columns at both ends, a beam across stalls and an aisle.

  • Fits wide areas, truck parking and charging hubs
  • Fewer columns among the vehicles
  • Deeper beams or trusses for the span

Tilt, module layout and racking come from your solar designer; we shape the frame and the purlins to them.

Large projects

Parking fields, not parking spaces

A campus, a retail park or a fleet depot can need rows and rows of canopies. One canopy design, repeated row after row, is exactly what a plant that fabricates 2,500 t (5.5 million lb) a month does well: steel packed row by row or site by site, in the order your crews build.

Drone view of a large site with rows of steel frames going up Photo Frame rows from above
Drone view of steel frames across a wide flat site Photo A wide flat site
Top-down drone shot of an open steel frame with its purlins Photo Purlins seen from above

Projects outside the US, shown for their frame rows; they are not solar canopies or US sites.

Fabrication capacity

Canopy rows for a whole parking field

2,500 metric tons a month

About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.

Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.

Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →

Real World Steel frames

Frames and purlins under open sky

Long frame lines by World Steel with their purlins in place, the same steel a canopy row is built from. Tap a photo to open it full size.

Long line of steel frames and purlins under a bright sky Photo Frames under open sky
Steel columns and rafters standing on a sandy site Photo Columns on a clear site
Steel roof frame seen from below against the sky Photo Rafters against the sky
Row of steel frames with purlins in place Photo Purlins in place
Wide steel frame with cranes erecting more bays Photo More bays going up

A project outside the US, shown for the structure type; it is not a US site.

Buying steel from outside the US

Every worry about an overseas fabricator, answered in writing

US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.

The worry: “Will steel designed overseas pass US plan check?”

Designed to US codes, ready for your engineer’s review

We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.

The worry: “I can’t see the quality from across the Pacific.”

An accredited plant you can inspect, live

Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.

The worry: “Will the materials be traceable to the grade on the drawings?”

Mill certificates by heat number

Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.

The worry: “What if pieces don’t fit when they reach the site?”

Modeled, approved, then measured

Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.

The worry: “How will I know where my order really is?”

Real-time tracking in PEB Studio

You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.

The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”

Packed in erection order, listed per container

Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.

The worry: “Who handles customs and duties?”

Incoterm and importer of record in writing

Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.

The worry: “Time zones and language will slow everything down.”

One English-speaking project manager

Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.

The worry: “Who erects it, and who stands behind the field work?”

Your US contractor erects, with our drawings

World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.

The worry: “Who is responsible for the design?”

Scope split agreed before you sign

We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.

  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

What the package contains

Components in this package

A solar canopy is a roof that has to suit two layouts at once: the parking stalls below and the module rows above. We place columns clear of stalls and charger islands, match purlin spacing to your racking, and design the cantilever for wind uplift and snow at your address under ASCE 7-22. Modules, chargers and wiring stay with your solar and electrical contractors.

standard = in the base scope · optional = add if you want it · confirm = depends on your design

Primary Structural System

Secondary Framing

Connections & Anchorage

Corrosion Protection

Drainage & Weather Protection

Ventilation & Building Services Support

Special Building Accessories

Not included

  • Foundations, slabs-on-grade, anchor rod setting and other sitework.
  • Steel erection and field labor, provided by your erector or general contractor.
  • Permit applications and plan review fees, unless agreed in writing.
  • Mechanical, electrical and plumbing design and installation.
  • US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.
  • Solar modules, inverters, EV chargers and all electrical work are by your solar and electrical contractors.

Talk to an engineer

Send the site plan, the modules and the chargers.

Our engineers work in English. We set the columns around your parking and chargers, lay the purlins out to your modules and send a written scope for the steel.

Covered in our state guides

Asked by solar and EV contractors

Solar and EV canopy questions and answers

12 answers on modules, chargers, parking fields and scope.

Solar modules on steel 3 answers

Do you supply the solar modules or racking?

No. Modules, racking clamps and inverters come from your solar contractor. We supply the canopy steel and lay the purlins out to their module and racking layout, so the rails land on steel.

Can the canopy carry the module weight, wind and snow?

Yes. The module weight, the wind on the tilted array and the snow from the site go into the frame design, to ASCE 7-22 or your jurisdiction’s edition. Your Engineer of Record approves the result.

Which way should the canopy tilt?

Your solar designer sets the tilt and orientation. We shape the frame to it and send the drainage to the low edge, away from the chargers.

EV chargers and parking 2 answers

Where do the columns go?

Between stall pairs or at the head of the stalls, clear of doors, drive aisles and charger islands. We set column lines from your parking and charger layout before the frame is designed.

Do you supply the chargers or the wiring?

No. Chargers, conduit, wiring and all electrical work belong to your electrical contractor. Conduit and cable support steel can be added to the canopy where they ask for it.

Parking fields and programs 1 answer

Can you supply canopies for a whole parking field or many sites?

Yes. Our plant in Vietnam fabricates 2,500 t (5.5 million lb) of structural steel a month. Canopy rows share one design and one set of details, and steel is packed row by row or site by site with production slots confirmed in the quote.

Canopy frame types 3 answers

Which canopy frame uses the least steel?

It depends on the stall layout. A single-post T-frame over a double row of stalls is often efficient because its two cantilevers balance each other. We compare frame types by steel weight for your layout in the proposal.

How high should the canopy be?

High enough for the vehicles you park and for fire and service access; vans and trucks need more height than cars. Your design team sets the clear height and we frame to it, with columns and bracing kept out of the drive aisles.

Can the canopy steel be hot-dip galvanized?

Yes. Canopy steel can be hot-dip galvanized for outdoor exposure, with connections detailed so the coating is not cut or welded on site.

Codes, buying and erection 3 answers

Who approves and seals the drawings?

Your Engineer of Record reviews and approves the calculations and drawings we prepare. The PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.

Do you erect the canopies?

No. World Steel designs, fabricates and supplies the steel. Foundations, erection, module installation and electrical work are the scope of the US contractor, our customer, and the trades they hire.

Do you publish prices?

No. Send the site plan, the module layout and the charger plan and we return a written scope and quotation.

Keep reading

Related pages

Planning solar or EV canopies?

Send the site plan, the module layout and the charger plan. We set the steel around your cars and modules and send a written scope, made in our plant in Vietnam.