World Steel
- Canopy columns and beams
- Purlins to the module layout
- Base plates and anchor bolts
- Conduit and cable support steel
Columns around the cars
We set the column lines from your stall and charger layout before the frame is designed, so no column lands in a door swing, a drive aisle or a charger island.
Illustration only. Stall sizes, column spacing and charger positions come from your site plan.
The solar canopy ecosystem
Who supplies what on a solar and EV canopy. The steel sits in the middle of every trade, so its layout is set from theirs.
Plain parking canopies without solar? See carport and canopy structures.
Three ways to hold up the array
The stalls, the drive aisles and the chargers decide where columns can stand, and that decides the frame. These are the three frames we design most often for solar parking.
One column line between two stall rows, beams reaching both ways.
Columns at the head of one stall row, the beam reaching over the cars.
Columns at both ends, a beam across stalls and an aisle.
Tilt, module layout and racking come from your solar designer; we shape the frame and the purlins to them.
Large projects
A campus, a retail park or a fleet depot can need rows and rows of canopies. One canopy design, repeated row after row, is exactly what a plant that fabricates 2,500 t (5.5 million lb) a month does well: steel packed row by row or site by site, in the order your crews build.
Photo
Frame rows from above
Photo
A wide flat site
Photo
Purlins seen from above Projects outside the US, shown for their frame rows; they are not solar canopies or US sites.
Fabrication capacity
2,500 metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →Real World Steel frames
Long frame lines by World Steel with their purlins in place, the same steel a canopy row is built from. Tap a photo to open it full size.
Photo
Frames under open sky
Photo
Columns on a clear site
Photo
Rafters against the sky
Photo
Purlins in place
Photo
More bays going up A project outside the US, shown for the structure type; it is not a US site.
Projects by World Steel
Photo
A factory frame by World Steel, shown for its frame rows and purlins. Vietnam · 2020.
Buying steel from outside the US
US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.
The worry: “Will steel designed overseas pass US plan check?”
We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.
The worry: “I can’t see the quality from across the Pacific.”
Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.
The worry: “Will the materials be traceable to the grade on the drawings?”
Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.
The worry: “What if pieces don’t fit when they reach the site?”
Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.
The worry: “How will I know where my order really is?”
You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.
The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”
Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.
The worry: “Who handles customs and duties?”
Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.
The worry: “Time zones and language will slow everything down.”
Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.
The worry: “Who erects it, and who stands behind the field work?”
World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.
The worry: “Who is responsible for the design?”
We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.
What the package contains
A solar canopy is a roof that has to suit two layouts at once: the parking stalls below and the module rows above. We place columns clear of stalls and charger islands, match purlin spacing to your racking, and design the cantilever for wind uplift and snow at your address under ASCE 7-22. Modules, chargers and wiring stay with your solar and electrical contractors.
standard = in the base scope · optional = add if you want it · confirm = depends on your design
Talk to an engineer
Our engineers work in English. We set the columns around your parking and chargers, lay the purlins out to your modules and send a written scope for the steel.
Covered in our state guides
Asked by solar and EV contractors
12 answers on modules, chargers, parking fields and scope.
No. Modules, racking clamps and inverters come from your solar contractor. We supply the canopy steel and lay the purlins out to their module and racking layout, so the rails land on steel.
Yes. The module weight, the wind on the tilted array and the snow from the site go into the frame design, to ASCE 7-22 or your jurisdiction’s edition. Your Engineer of Record approves the result.
Your solar designer sets the tilt and orientation. We shape the frame to it and send the drainage to the low edge, away from the chargers.
Between stall pairs or at the head of the stalls, clear of doors, drive aisles and charger islands. We set column lines from your parking and charger layout before the frame is designed.
No. Chargers, conduit, wiring and all electrical work belong to your electrical contractor. Conduit and cable support steel can be added to the canopy where they ask for it.
Yes. Our plant in Vietnam fabricates 2,500 t (5.5 million lb) of structural steel a month. Canopy rows share one design and one set of details, and steel is packed row by row or site by site with production slots confirmed in the quote.
It depends on the stall layout. A single-post T-frame over a double row of stalls is often efficient because its two cantilevers balance each other. We compare frame types by steel weight for your layout in the proposal.
High enough for the vehicles you park and for fire and service access; vans and trucks need more height than cars. Your design team sets the clear height and we frame to it, with columns and bracing kept out of the drive aisles.
Yes. Canopy steel can be hot-dip galvanized for outdoor exposure, with connections detailed so the coating is not cut or welded on site.
Your Engineer of Record reviews and approves the calculations and drawings we prepare. The PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.
No. World Steel designs, fabricates and supplies the steel. Foundations, erection, module installation and electrical work are the scope of the US contractor, our customer, and the trades they hire.
No. Send the site plan, the module layout and the charger plan and we return a written scope and quotation.
Keep reading
Send the site plan, the module layout and the charger plan. We set the steel around your cars and modules and send a written scope, made in our plant in Vietnam.