Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Long factory building framed with red tapered portal frames and roof purlins

World Steel job in Vietnam (Tay Ninh Province): tapered portal frames.

Specialized opportunities

Pedestrian bridges · Transit canopies · Fleet depots

Transportation & Infrastructure

Bridges, canopies and depots fabricated in shippable sections. Pedestrian bridges, transit canopies, parking structures and maintenance depots built from bolted sections.

Modules
Sized for containers, flat-racks and highways
Splices
Bolted, quick to make in the field
Protection
Hot-dip galvanized
Criteria
The owner’s or agency’s design manual
Typical sectionIllustrative
Illustrative section of a transportation & infrastructure steel buildingSpan 40 m (131 ft) in 3 modulesBolted field splicesPrefabricated trussGalvanized steelTransit canopy

Illustrative pedestrian bridge, not a design. Module length follows shipping, galvanizing and highway limits.

Built to travel

How a bridge crosses the Pacific in pieces and goes up in a day

Infrastructure steel has to be designed for the road as well as the river. We plan module length, splices and galvanizing together, so sections arrive ready to lift.

  1. Split into modules

    Module length and splice points follow container, flat-rack and US highway permit limits.

  2. Fabricate and trial-fit

    Trusses and girders are welded and checked for fit in our Vietnam plant before galvanizing.

    Learn more →
  3. Galvanize

    Kettle size is checked during detailing so every module can be dipped whole.

    Learn more →
  4. Ship to a US port

    Modules travel packed and tagged by erection sequence, with documents for your customs broker.

    Learn more →
  5. Bolt together on site

    Field splices are bolted, so your erector lifts modules into place while roads and trails stay open.

    Learn more →

In the US market

Cities, park districts and campuses keep adding trail crossings, transit canopies and carports. Most of these structures have to go up quickly while nearby roads and paths stay open.

What the building needs

Modules that fit standard shipping and highway limits, bolted splices that are quick to make in the field, durable galvanizing, and inspection records that meet the owner’s criteria.

How World Steel helps

Module length, splice location and galvanizing are planned together, so sections arrive ready to lift. World Steel’s Carport (2019) reference applies the same approach to a smaller structure.

Made in our Vietnam plant

What we supply

  • Prefabricated bridge modules
  • Built-up steel members
  • Structural steel fabrication
  • Hot-dip galvanizing
  • Container-sized modules

Products · Steel buildings

Building types and the frames behind them

Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.

All steel buildings →

Pedestrian bridge

Truss or girder bridge in shippable modules

Scoped to your drawings

Rows of roof purlins and rod bracing across a steel frame Photo

Transit canopy

Canopy or open-sided frame

Starts from: Equipment Shelter Buildings

Warehouse frame from above, purlins and girts fixed to the rafters and columns Photo

Building packages

Planned steel building packages for the building types US owners ask for most.

See packages →
Top-down drone shot of an open steel warehouse frame Photo

Building Package Builder

Pick a use and rough dimensions to draft a scope you can send with your quote request.

Build a package →

Engineering

Engineered for US codes, your site and this use

Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.

Questions your engineer will raise

  • Module lengths and splice locations are set by container, flat-rack and highway permit limits as well as by the structure.

  • Galvanizing kettle size can cap member length, so it is checked before detailing.

  • DOT and transit-agency work follows the owner’s design criteria, and federally funded work may carry steel sourcing rules to confirm with the funding agency.

Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.

IBC 2024ASCE 7-22AISC 360AISI S100AWS D1.1AWS D1.3

Site conditions to review

IAS AC472 accreditedWorld Steel is the first and only steel building plant in Vietnam accredited to IAS AC472 for design and fabrication inspection.

Solutions · End to end

From our plant in Vietnam to your site in the US

One partner carries your transportation & infrastructure building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.

  1. Engineered to US codes

    Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.

    Steel building design →
  2. Made in our Vietnam plant

    Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.

    Inside the plant →
  3. Tracked live in PEB Studio

    Watch each of your members move through fabrication and QC release, in real time.

    PEB Studio →
  4. Shipped to a US port

    Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.

    Vietnam to USA →
  5. Erected by your team

    Piece marks, erection drawings and packing lists let your erector start straight away.

    How we work →

PEB Studio

Watch your building being made, in real time

Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data
Live production status

The Transportation & Infrastructure ecosystem

Everything that connects to your building

Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.

Projects

Similar buildings we have fabricated

Comparable building types from our portfolio, with US work, including the US territory of Guam, shown first.

All projects →

Questions and answers

Transportation & Infrastructure: what US contractors ask us

16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.

Bridges and canopies 4 answers

How long can a bridge module be?

It depends on the shipping method, the galvanizing kettle and the highway route to your site. We check all three before detailing and split the bridge accordingly.

Do you fabricate pedestrian bridges?

Yes. Truss and girder footbridges are fabricated in shippable modules with bolted splices, to the design criteria the owner and your Engineer of Record set.

Do you fabricate carports and parking canopies?

Yes. Cantilever and double-post canopies are fabricated as bolted kits, and World Steel’s Carport (2019) is one of our US references.

Can canopies carry solar panels and EV chargers?

Yes. Panel, racking and charger loads are added to the design, and conduit routes are coordinated with your electrical engineer. Panels and chargers come from their own suppliers.

Transit and fleet buildings 4 answers

Which transportation buildings do you supply?

Bus and fleet maintenance garages, transit station canopies, toll and inspection buildings, salt and material storage, and rail maintenance shops.

Can a maintenance garage carry cranes and lifts?

Yes. Crane runways, hoists and equipment loads are designed with the frame from the start, using the loads their suppliers give.

Can you work to a DOT or transit agency manual?

Yes. We design and fabricate to the criteria the owner names. Federally funded projects may carry steel sourcing rules that the funding agency must confirm first.

How do you protect steel from road salt?

With galvanizing or a coating system chosen for the exposure, applied in our Vietnam plant, and with details that drain water instead of trapping it.

Fabrication and delivery 4 answers

Can you supply a corridor of stations or canopies?

Yes. Repeated structures are fabricated from one standard design, with loads re-checked per site. The plant fabricates up to 2,500 metric tons (2,756 short tons) of steel a month.

How do you plan deliveries for road closures?

Modules are packed in the order of erection, and the shipping plan is shared with your contractor so trucks arrive inside the closure window they book.

Which welding and quality standards apply?

Structural welding follows AWS D1.1, or the welding code the owner’s manual names. Our quality program is accredited under IAS AC472 and audited twice a year.

Can the owner follow fabrication?

Yes. PEB Studio shows each member in real time, and inspectors can attend witness points in person or remotely.

Scope and funding 4 answers

Does World Steel install bridges or canopies?

No. World Steel designs, fabricates and supplies the steel. Lifting, erection and site work belong to the US contractor, our customer.

Who seals the drawings?

Your Engineer of Record reviews and approves our calculations and drawings. The PE seal and permits stay with the US project team.

Can your steel be used on federally funded transit work?

That depends on the funding program’s sourcing rules, which can restrict imported steel. We ask the contractor to confirm with the agency first and make no eligibility claim.

What do you need to quote?

The structure type and size, design criteria or agency manual, site location, access route and any coating requirements.

Covered in our state guides

Ready to scope your bridge or canopy project?

Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.