In the US market
Cities, park districts and campuses keep adding trail crossings, transit canopies and carports. Most of these structures have to go up quickly while nearby roads and paths stay open.
Built to travel
Infrastructure steel has to be designed for the road as well as the river. We plan module length, splices and galvanizing together, so sections arrive ready to lift.
Module length and splice points follow container, flat-rack and US highway permit limits.
Trusses and girders are welded and checked for fit in our Vietnam plant before galvanizing.
Learn more →Modules travel packed and tagged by erection sequence, with documents for your customs broker.
Learn more →Field splices are bolted, so your erector lifts modules into place while roads and trails stay open.
Learn more →Cities, park districts and campuses keep adding trail crossings, transit canopies and carports. Most of these structures have to go up quickly while nearby roads and paths stay open.
Modules that fit standard shipping and highway limits, bolted splices that are quick to make in the field, durable galvanizing, and inspection records that meet the owner’s criteria.
Module length, splice location and galvanizing are planned together, so sections arrive ready to lift. World Steel’s Carport (2019) reference applies the same approach to a smaller structure.
What you can build
Made in our Vietnam plant
Products · Steel buildings
Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.
Truss or girder bridge in shippable modules
Scoped to your drawings
Photo
Photo
Clear-span frame with drive-through doors
Starts from: Carport & Canopy Structures
Photo
Multi-level steel frame or cantilever canopy
Starts from: Multi-Story Steel Buildings
Photo
Building packages
Planned steel building packages for the building types US owners ask for most.
See packages →
Photo
Building Package Builder
Pick a use and rough dimensions to draft a scope you can send with your quote request.
Build a package →Engineering
Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.
Module lengths and splice locations are set by container, flat-rack and highway permit limits as well as by the structure.
Galvanizing kettle size can cap member length, so it is checked before detailing.
DOT and transit-agency work follows the owner’s design criteria, and federally funded work may carry steel sourcing rules to confirm with the funding agency.
Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.
Solutions · End to end
One partner carries your transportation & infrastructure building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.
Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.
Steel building design →Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.
Inside the plant →Watch each of your members move through fabrication and QC release, in real time.
PEB Studio →Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.
Vietnam to USA →Piece marks, erection drawings and packing lists let your erector start straight away.
How we work →PEB Studio
Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.
Demonstration data
The Transportation & Infrastructure ecosystem
Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.
ProductsSteel buildings
View all →ProductsBuilding systems
View all →ProductsComponents
Your roleWho we serve
ApplicationsRelated industries
View all →State guides
Projects
Comparable building types from our portfolio, with US work, including the US territory of Guam, shown first.
Questions and answers
16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.
It depends on the shipping method, the galvanizing kettle and the highway route to your site. We check all three before detailing and split the bridge accordingly.
Yes. Truss and girder footbridges are fabricated in shippable modules with bolted splices, to the design criteria the owner and your Engineer of Record set.
Yes. Cantilever and double-post canopies are fabricated as bolted kits, and World Steel’s Carport (2019) is one of our US references.
Yes. Panel, racking and charger loads are added to the design, and conduit routes are coordinated with your electrical engineer. Panels and chargers come from their own suppliers.
Bus and fleet maintenance garages, transit station canopies, toll and inspection buildings, salt and material storage, and rail maintenance shops.
Yes. Crane runways, hoists and equipment loads are designed with the frame from the start, using the loads their suppliers give.
Yes. We design and fabricate to the criteria the owner names. Federally funded projects may carry steel sourcing rules that the funding agency must confirm first.
With galvanizing or a coating system chosen for the exposure, applied in our Vietnam plant, and with details that drain water instead of trapping it.
Yes. Repeated structures are fabricated from one standard design, with loads re-checked per site. The plant fabricates up to 2,500 metric tons (2,756 short tons) of steel a month.
Modules are packed in the order of erection, and the shipping plan is shared with your contractor so trucks arrive inside the closure window they book.
Structural welding follows AWS D1.1, or the welding code the owner’s manual names. Our quality program is accredited under IAS AC472 and audited twice a year.
Yes. PEB Studio shows each member in real time, and inspectors can attend witness points in person or remotely.
No. World Steel designs, fabricates and supplies the steel. Lifting, erection and site work belong to the US contractor, our customer.
Your Engineer of Record reviews and approves our calculations and drawings. The PE seal and permits stay with the US project team.
That depends on the funding program’s sourcing rules, which can restrict imported steel. We ask the contractor to confirm with the agency first and make no eligibility claim.
The structure type and size, design criteria or agency manual, site location, access route and any coating requirements.
Neighboring industries
Covered in our state guides
Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.