Mississippi · Food plants
Structural steel for Mississippi poultry and food plants
Poultry is the largest farm sector in Mississippi, with processing plants, hatcheries and feed mills around Laurel, Forest, Collins and the Pine Belt, plus catfish and food plants in the Delta. These are wet, humid, cold buildings. We fabricate their halls, platforms and cold room steel.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Mobile or New Orleans for your Mississippi site.
- Hubs
- Laurel, Forest, Collins
- Plants
- Poultry, catfish, food
- Coatings
- Washdown systems
- Cold rooms
- Thermal break details
Why it matters
Humid air, wet rooms, cold rooms
Gulf humidity, washdown chemicals and freezer temperatures all meet in a poultry plant, and expansions usually go up beside lines that keep running.
We choose galvanized, duplex or paint systems for each room, detail thermal breaks for cold rooms and release the steel in phases that fit the owner’s tie-in plan.
What we design and fabricate
Steel for food plants
Process halls
Clear-span halls over production lines.
Platforms and mezzanines
Equipment platforms, catwalks and mezzanines.
Washdown coatings
Galvanized, duplex or paint systems for wet rooms.
Cooler and freezer steel
Frames with thermal breaks for cold rooms.
Who does what
Plant steel, split clearly
World Steel supplies
- Process hall, platform and mezzanine steel
- Coating systems chosen for each room
- Phased releases next to running lines
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process layout with the owner and equipment suppliers
- Engineer of Record approval and PE seal
- Food safety and sanitation design
- Equipment setting and piping
- Erection and site work
Mississippi
What we do not claim
World Steel names no Mississippi food company as a customer and makes no food safety or sanitation claim. Food safety design is the owner’s and their team’s scope.
Mississippi ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Mississippi contractors
Mississippi contractors: let’s win the next project together
If your next bid involves poultry and food plants, World Steel wants to be your long-term, win-win steel partner in Mississippi. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Mississippi project is cut, welded, inspected and packed.
Q&A
What Mississippi buyers ask
Which coatings suit poultry plants?
Usually galvanizing or duplex systems in wet rooms, confirmed by your team.
Can you build beside a running plant?
Yes. We release the steel in phases that match the owner’s shutdowns.
Do you design the refrigeration?
No. Refrigeration and sanitation design are your team’s scope.
Official sources: Mississippi Department of Agriculture and Commerce
Mississippi solutions
Every Mississippi guide
Related pages
Code facts on this page summarize Mississippi practice, the code your county or city enforces, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Mississippi?
Send the drawings or the site address, size and use. We set the Mississippi design basis with your Engineer of Record, design or detail the steel to your county’s code and Gulf hurricane wind, and quote it made in our plant in Vietnam, packed in erection order and landed at Mobile or New Orleans for the truck to your site.