Additions under the IEBC
Independent or connected?
The simplest addition in a seismic region stands on its own. It has its own lateral system and a seismic joint wide enough that the two buildings do not pound against each other, sized from their drifts under ASCE 7-22. The existing building then carries no new seismic load.
When the addition is connected, the IEBC looks at the existing lateral elements. In most cases, if an element’s demand rises by more than ten percent compared with the building without the addition, that element must be shown to meet the current code for wind and seismic. Your Engineer of Record makes that evaluation and decides whether existing frames need strengthening.
Typical projects
Seismic work on existing buildings
New bays on a metal building
Frames matched to the existing profile, with braced bays in the new end wall and a joint or a tie-in designed for seismic.
Mezzanines and platforms
Added seismic weight on the floor, with its own bracing or anchored to frames that are checked for it.
Cranes and heavy equipment
New crane runways and supports change both the weight and the system; frames are checked before the crane goes in.
Rooftop solar and equipment
Weight added to the roof raises the seismic force and can take a frame outside the single-story limits.
Retrofit braced frames
New steel braced frames or moment frames installed inside an existing building to your engineer’s retrofit design.
Collectors and drag struts
Steel members that tie an old roof diaphragm into new lateral frames.
How we work on existing buildings
From field survey to steel that fits
-
Field survey
Your team or surveyor measures the existing frames, bolt patterns and elevations. We tell you exactly which dimensions we need.
-
Design basis
Your Engineer of Record sets the code path and any evaluation of the existing structure, for example to ASCE 41.
-
Shop drawings with field checks
Field-verify dimensions are flagged on the shop drawings, included at no extra charge.
-
Fabricated to fit
Members made in our plant in Vietnam, tagged by location and packed in installation order.
Real photos
From our plant in Vietnam
World Steel’s own shop floors and jobs, where the steel for US projects is made. Not stock images.
How World Steel supports this
Designed to US codes, made in our plant in Vietnam
Additions that fit
New frames detailed to match your existing building and its bolt patterns.
Build to your drawings
Retrofit steel fabricated to your engineer’s design, with shop drawings included.
Drawings for your approval
Our design scope goes to your Engineer of Record to review and approve.
The seismic solution ecosystem
Products and solutions behind this guide
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Products made in our plant in Vietnam
Solutions that come with it
World Steel projects: US codes, Guam, Japan and beyond
3D model
Photo
3D model
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Read the standard behind it
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Related solutions
Questions from US buyers
Retrofit & expansion: questions we hear
Can you extend a metal building made by another manufacturer?
Often, yes. We need the existing drawings or a field survey, and your Engineer of Record decides whether the addition is independent or tied in.
Do you design seismic retrofits?
We fabricate retrofit steel to your Engineer of Record’s design. Evaluating the existing building is theirs; designing new additions can be ours.
Does a mezzanine trigger a seismic upgrade?
It can, if it raises the demand on the existing lateral system beyond what the IEBC allows. Your Engineer of Record checks it before the mezzanine is designed.
Does World Steel provide shop drawings for seismic work?
Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure, and your Engineer of Record reviews and approves the calculations and drawings.
A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and standards govern, and your Engineer of Record confirms the criteria for each project.
Talk to a seismic engineer
Send the site address, the soil report if you have one, and what the building is for. We confirm the seismic criteria with your Engineer of Record and return a written scope for steel designed to US codes and made in our plant in Vietnam.