California · Code and plan check
The California Building Code, plan check and special inspection for steel
California adds its own layers to the IBC: state amendments, city amendments, state agencies for schools and hospitals, and local rules for who may fabricate structural steel. We map that path for your project at the start, so the permit set and the shop inspection plan are right the first time.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a California port.
- State code
- California Building Code, Title 24, Part 2; 2025 edition effective January 1, 2026
- Model code
- Based on the 2024 IBC, with ASCE 7-22 loads
- State review
- DSA for public schools, HCAI for hospitals and skilled nursing
- Inspection
- IBC Chapter 17 special inspection, as amended in California
Who reviews what
The review path depends on what you are building
The steel is the same quality either way; what changes is who reviews the design and who inspects the fabrication.
| Project | Reviewing agency | What it means for the steel |
|---|---|---|
| Warehouses, plants, offices, retail | City or county building department | Plan check of the calculations and drawings; special inspection under Chapter 17 and local rules |
| Public K-12 schools and community colleges | Division of the State Architect (DSA) | DSA’s own testing and inspection program; inspectors and labs DSA accepts, agreed before pricing |
| Hospitals and skilled nursing facilities | HCAI (formerly OSHPD) | State review and inspection for the facility; the fabrication inspection plan is set with the design team |
| Outpatient clinics and medical offices | Usually the local building department | Local plan check; some clinic types follow HCAI-adopted provisions enforced locally |
| State-owned buildings | The state agency and its building official | Requirements set by the agency; confirmed during scoping |
From design to permit
What we prepare for California plan check
-
Calculation package
Design criteria, loads, member and connection checks, ready for your Engineer of Record to review and approve.
-
Permit and approval drawings
Framing plans, elevations, sections and connection details your plan checker can follow.
-
Deferred submittals
Metal building and steel shop drawings submitted as deferred items when your jurisdiction allows it.
-
Plan check responses
Written answers to plan check comments, with revised sheets, from the engineers who did the design.
-
Special inspection plan
The shop and field inspection tasks listed for your statement of special inspections.
-
Structural observation
Support for the Engineer of Record’s structural observation where the CBC requires it.
Fabricator approval, stated plainly
What we can say about shop approval in California
We say
- First and only fabricator in Vietnam accredited under IAS AC472
- In-plant special inspection supported, in person or over live video
- Welding procedures and welders qualified to AWS D1.8
- Every inspection and test recorded member by member
We never claim
- Los Angeles City or County fabricator approval
- DSA or HCAI approval of our plant
- An exemption from special inspection
- A permit decision: the building official makes it
Confirmed per project
Code editions, local amendments and inspection requirements change. We confirm them with your Engineer of Record and building official during scoping and list them in the quote, rather than assuming a statewide answer.
California ecosystem
Products and solutions for this condition
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Q&A
What California buyers ask
Does California accept IAS AC472 for shop inspection?
The building official decides. IBC Section 1704.2.5 allows special inspection of shop work to be waived for an approved fabricator, and IAS accreditation is evidence many officials consider. Where it is not accepted, your agency inspects in our plant, in person or remotely.
Can the metal building be a deferred submittal?
In many jurisdictions, yes: the architect’s permit set shows the building, and the metal building calculations and drawings follow as a deferred submittal. Your architect confirms that your building department allows it.
Who answers plan check comments on the steel?
Our engineers answer comments on the steel design in writing, with revised sheets for your Engineer of Record.
Official sources: California Building Standards Commission · Division of the State Architect · HCAI facilities development
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your California project is cut, welded, inspected and packed.
California solutions
Every California guide
Keep reading
Related pages
Code facts on this page summarize the California Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in California?
Send the site address, size and use. We set the California criteria with your Engineer of Record, design the steel to the California Building Code and quote it made in our plant in Vietnam, with the inspection path agreed in writing.