Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

California · Code and plan check

The California Building Code, plan check and special inspection for steel

California adds its own layers to the IBC: state amendments, city amendments, state agencies for schools and hospitals, and local rules for who may fabricate structural steel. We map that path for your project at the start, so the permit set and the shop inspection plan are right the first time.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a California port.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
State code
California Building Code, Title 24, Part 2; 2025 edition effective January 1, 2026
Model code
Based on the 2024 IBC, with ASCE 7-22 loads
State review
DSA for public schools, HCAI for hospitals and skilled nursing
Inspection
IBC Chapter 17 special inspection, as amended in California

Who reviews what

The review path depends on what you are building

The steel is the same quality either way; what changes is who reviews the design and who inspects the fabrication.

ProjectReviewing agencyWhat it means for the steel
Warehouses, plants, offices, retailCity or county building departmentPlan check of the calculations and drawings; special inspection under Chapter 17 and local rules
Public K-12 schools and community collegesDivision of the State Architect (DSA)DSA’s own testing and inspection program; inspectors and labs DSA accepts, agreed before pricing
Hospitals and skilled nursing facilitiesHCAI (formerly OSHPD)State review and inspection for the facility; the fabrication inspection plan is set with the design team
Outpatient clinics and medical officesUsually the local building departmentLocal plan check; some clinic types follow HCAI-adopted provisions enforced locally
State-owned buildingsThe state agency and its building officialRequirements set by the agency; confirmed during scoping

From design to permit

What we prepare for California plan check

  • Calculation package

    Design criteria, loads, member and connection checks, ready for your Engineer of Record to review and approve.

  • Permit and approval drawings

    Framing plans, elevations, sections and connection details your plan checker can follow.

  • Deferred submittals

    Metal building and steel shop drawings submitted as deferred items when your jurisdiction allows it.

  • Plan check responses

    Written answers to plan check comments, with revised sheets, from the engineers who did the design.

  • Special inspection plan

    The shop and field inspection tasks listed for your statement of special inspections.

  • Structural observation

    Support for the Engineer of Record’s structural observation where the CBC requires it.

Fabricator approval, stated plainly

What we can say about shop approval in California

We say

  • First and only fabricator in Vietnam accredited under IAS AC472
  • In-plant special inspection supported, in person or over live video
  • Welding procedures and welders qualified to AWS D1.8
  • Every inspection and test recorded member by member

We never claim

  • Los Angeles City or County fabricator approval
  • DSA or HCAI approval of our plant
  • An exemption from special inspection
  • A permit decision: the building official makes it

Confirmed per project

Code editions, local amendments and inspection requirements change. We confirm them with your Engineer of Record and building official during scoping and list them in the quote, rather than assuming a statewide answer.

California ecosystem

Products and solutions for this condition

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Q&A

What California buyers ask

Does California accept IAS AC472 for shop inspection?

The building official decides. IBC Section 1704.2.5 allows special inspection of shop work to be waived for an approved fabricator, and IAS accreditation is evidence many officials consider. Where it is not accepted, your agency inspects in our plant, in person or remotely.

Can the metal building be a deferred submittal?

In many jurisdictions, yes: the architect’s permit set shows the building, and the metal building calculations and drawings follow as a deferred submittal. Your architect confirms that your building department allows it.

Who answers plan check comments on the steel?

Our engineers answer comments on the steel design in writing, with revised sheets for your Engineer of Record.

Official sources: California Building Standards Commission · Division of the State Architect · HCAI facilities development

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your California project is cut, welded, inspected and packed.

Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.

Keep reading

Related pages

Code facts on this page summarize the California Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in California?

Send the site address, size and use. We set the California criteria with your Engineer of Record, design the steel to the California Building Code and quote it made in our plant in Vietnam, with the inspection path agreed in writing.